QUALITY MANAGEMENT SYSTEM

ITP Description INSPECTION & TEST PLAN FOR Block Works


Project Name. R03-Turtle Bay Package 5 Consultant Saud Consult
Village Center Professional and Non-Professional Neighborhood Center
Project Code. R03-C02C02 Main Contractor AMT
Discipline Architecture Document No. R03-C02C02-AAP-ITP-AR- Rev. 00 Sub-Contractor N/A Date: 7-jan-2024
Level of Participation Points
S Code & Specification Acceptance Criteria
No. Activity Description Inspection / Test Method Frequency Other Contract Documents References REMARKS
Construction QA/QC Consultant RSG

1.0 Document Review

-Approved Drawings
1.1 -Approved Method Statement Project Specs. R03-C02D02-ZFP-SPC-Ar-0001 Project specification required H RH/H RH/H RH
-Approved Material Submittal Sec.042000
-Approved Mix Design
2.0 Material Receiving
2.1
Masonry Reference standards -Concrete Masonry Units: ASTM C129 H H H
Unit & Related - Provide units with minimum average net area
Masonry Compressive
Accessories etc. strength of 4.14 MPa
. Samples for Concrete Unit Masonry
Project Specs. R03-C02D02-ZFP-SPC-Ar-0001 Reference standards
Handling, Storage and Preservation Sec.042000
Inspection of Block work Materials

3.0 Mock Up

3.1 Mock up preparation and approval Block work method Statement - Mock up to be prepared and approved by W S S
Supervision Consultant as per the following
wall types
.
A A. block masonry walls for plaster finish.

B Cavity wall.
-
4.0 Installation

4.1 Block work mortar mixing Approved Method Statement Reference Standard W W W W

3.3 Mortor Sampling Approved Method Statement


General: Comply with ASTM C 926
for applications indicated. W W W W
. Dash-Coat Mix: 2 parts Portland
cement to 3 parts fine sand, mixed
with water to a mushy paste consistency
. Base-Coat Mixes for Use over

1|Page
3.4 Concrete:
Base coat for two-coat plasterwork as
follows: 1. Portland
Cement Mix: 1 part
Portland cement and 2- 1/2 to 4 parts
sand
Aggregate. 2. Fiber Reinforcement
Base-Coat Mixes for Use over.
Concrete
Masonry: Base coat for two- coat
plasterwork
as follows: 1. Base Coat: 1 part
Portland
cement, 5 parts aggregate, lime
replacing plasticizer as per
manufacturer’s
Recommendation. 2. Fiber
Reinforcement:
Comply with manufacturer’s printed
Instructions.

SETTING OUT Reference Standard S S S S


Setting Blocks-Works). Out
/Layout ( i.e. 1- Layer

CMU Block works / Installation of Reference Standard Ensure that the Installation of Concrete W H H H
Blocks Masonry Blocks (i.e. Mortar bedding &
Jointing, Horizontal Joint Reinforcement,
Control Joints, Repair, Pointing &
Cleaning, Curing Install according to ASTM C
1063 and at
locations indicated on Drawings.
Masonry Accessories At distances between control joints of not
greater than 5.5 m
1- As required to delineate plasterwork intoareas
(panels) with length-to-width ratios of not
greater than 2- 1/2:1.
2- Where control joints occur in
surface of construction directly behind plaster
Plumpness/Vertically Check Reference Standard A. Plumbness: Not more than 1.00 mm W H H H
per
one meter of gradual change, maximum
3.00 mm
Level: Not more than 1.00 mm per one
meter of gradual change, maximum 3.00
mm
Compressive Strength Reference Standard For CMU Blocks 4.14 MPa For Mortar 5 +- 1 W H H H
N/ mm2 Proportion grout in accordance
with ASTM C 476, Table 1 or paragraph
4.2.2 for specified 28-day compressive
strength indicated, but not less than 14 MPa

4 Pre-Commissioning
4.1 Not Applicable
ITP Approval Signature
Sub-Contractor (If Applicable) Main Contractor SC RSG
Name: Name: Name: Name:

2|Page
Signature Signature Signature Signature

Date: Date: Date: Date:


GENERAL NOTES:
Hold: QA/QC team shall be notified of the schedule of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC Team/Client representative in attendance.
Review: Required qualification/certification/reports shall be submitted for the QA/QC team review and approval.
Witness: QA/QC team shall be notified of the schedule of inspection or test in advance. If the QA/QC Team/Client representative doesn’t come on time for inspection, the activity can proceed.
Legend:
S: Responsible for carrying out random surveillance of inspection or
H: Contractor must not proceed without approval. R: Responsible for reviewing certification or reports. W: Responsible for / and witnessing all inspection or test.
test/Random Check.

RH: Review and Approval of Documents I: Contractor Inspection /Test

Surveillance: QA/QC team to monitor work in progress without notice from the construction organization/Random check selection.

Project:
R03C02C02-Turtle Bay Village (TBV)

Location Issue Date

Building Name

Clearance Form Clearance Details: -

DEPT. AMT UG Contractor SC RSG

Survey

Civil

Mechanical

Electrical