The document provides a dry docking/repair list for the vessel JMS 5. It details that cargo pump no. 3 needs a full overhaul, including dismantling and inspection by the owner's superintendent and surveyor. The shipyard will provide labor, tools, and equipment to disconnect, transport, reassemble the pump with new bearings and a mechanical seal supplied by the owner. The shipyard is also required to check pump shaft alignment with the motor and perform a function test witnessed by the owner. The yard facilities needed include a gas free certificate, enclosed space work, lighting, ventilation, pressure testing, function testing, transportation, and certification. The total cost will be itemized.
The document provides a dry docking/repair list for the vessel JMS 5. It details that cargo pump no. 3 needs a full overhaul, including dismantling and inspection by the owner's superintendent and surveyor. The shipyard will provide labor, tools, and equipment to disconnect, transport, reassemble the pump with new bearings and a mechanical seal supplied by the owner. The shipyard is also required to check pump shaft alignment with the motor and perform a function test witnessed by the owner. The yard facilities needed include a gas free certificate, enclosed space work, lighting, ventilation, pressure testing, function testing, transportation, and certification. The total cost will be itemized.
The document provides a dry docking/repair list for the vessel JMS 5. It details that cargo pump no. 3 needs a full overhaul, including dismantling and inspection by the owner's superintendent and surveyor. The shipyard will provide labor, tools, and equipment to disconnect, transport, reassemble the pump with new bearings and a mechanical seal supplied by the owner. The shipyard is also required to check pump shaft alignment with the motor and perform a function test witnessed by the owner. The yard facilities needed include a gas free certificate, enclosed space work, lighting, ventilation, pressure testing, function testing, transportation, and certification. The total cost will be itemized.
Shipyard to provide labour, tools and equipment to accomplish the
followings works. Inspection/ Survey Classification Society To disconnect pump coupling, foundation and fitting and to transport to workshop for full overhauling. Owner's representative x Flag State To dismantle cargo pump for inspect by Owner Superintendent & surveyor. To re-assemble with new bearings, mechanical seal (owner supply) Manufacturer/ Maker currently cargo pump found leaking and cargo drip from shaft Insurance/ Underwriters To check pump shaft alignment with motor To function test with witnessed by owner superintendent or the senior engineer from the vessel. Others
Total cost : …………………….
Yard Facilities Requirement *mark (X) Remarks
Gas Free Certificate x Galvanising Itemised the unit price as shipyard Enclosed Space Work x Paint work tariffs with estimated quantity for budgeting purpose. Lightings x Pressure testing x Ventilation x Function testing x Cleaning Correction drawing H.P. Cleaning Surface blasting Chemical washing Hydraulic jacking Polishing Overhauling Staging/ Scaffolding Re-conditioning Total cost ………………… Crane x Dynamic load testing Transportation x Certification Corrosion protection