FARIŇAS RESIDENCE PROJECT

CONSTRUCTION REPORT

PROJECT SITE NAME C0NTRAC


Fariňas Residence
CONTRACTOR WORK DA
RND Designs Engineering May 0
SITE CONDITIONS, RESOURCES AND INSPECTIONS
WEATHER PERSONNEL AND EQUIPMENT
CLEAR FAIR CLOUDY SHOWER RAIN TYPHON

√ √ Inspections or Test's
TO 32 32 - 50 50 -70 70 - 83 OVER 83 "None"
TEMP

LOW LOW MED HIGH
WIND

WET LOW MED HIGH
HUMIDITY
√ √
LABORS/EQUIPMENT HOURS

2 WATER PUMP 0 Inspections / Test's Sch

CONCRETE MIXER 8 "None"


FOREMAN/LABORERS 8

Total payroll hours reported today 16


WORK PROGRESS
SCHED
DISCRIPTION OF WORK
TASK PERFORMED This Report Planned Finish Actual Finish Estimated %
Date Date Complete

Task #1: 2nd Floor Slab Pouring Done 10/17/2019 11/15/2019 100.0%

Task #2: Rough-in plumbing & (Septic Tank Excavation) Done 09/14/2019 2/9/2019 100.0%
Task #3: Install of main Stair Done 3/10/2019 09/25/2019 100.0%
Task #4: Column and Foundation @ Ground Flr. Done 08/31/2019 3/8/2019 100.0%
Task #5: Grade Beam Ground Flr.CHB Laying On Going 12/23/2019 12/31/2019 70.0%
Task #6: Steel Deck Instalation Done 10/31/2019 10/22/2019 100.0%
Task #7: 2nd Floor Beam Phase 1,2,3,4,5,6,7,8,9 Done 10/17/2019 10/19/2019 100.0%
Task #8: Roughing in Electrical instalation 2nd Flr. Not Fully Done 11/19/2019 12/11/2019 30.0%
Task #8: Excavation for Foundation Start Done 05/18/2019 12/6/2019 100.0%
Task #9: Backfilling at Garage Area Start On Going 3/8/2019 11/27/2019 5.0%
Task #10: 2ndFlr Column and Roof Beam Forms Works On Going 12/19/2019 11/30/2019 45.0%
Task #11: Stair @ Maids Room Done 12/10/2019 3/10/2019 100.0%
Task : Substantial Complete

WORK PROGRESS -- REMARKS: Include unresolved issues / factors contributing to delays, meetings and significant decisions.
Task #1 Remarks Fabrication of Steel Trusses Started

Task #2 Remarks Rough-in plumbing & (Septic Tank Excavation) already done
Task #3 Remarks Install of the main Stair is ongoing, planned finish @ 09-25-2019
Task #4 Remarks Main Stair Done @ landing,Stair at Garage Done
Task #5 Remarks All Column and Grade Beam Ground Floor done
Task #6 Remarks Septic Tank is already done ready for instalation for the pvc pipe
Task #7 Remarks Instalation of Rough in Electrical for @ roof beam electrical done by Darious
Task #8 Remarks Instalation of CHB @ Porch Area
Task #9 Remarks Backfill at Garage Area Ongoing
Task #10 Remarks Instalation of CHB @ Ground Floor

Planned Work -- Following 1 or 2 Day's (as applicable)

CHB Laying on Ground Floor Area and @Monday 12-09-2019 Start of Laying CHB at the Second Floor Area

SUBMITTED BY: SIGNATURE: S M T W T F

Eunice Bal √ √ √ √ √

CONTRACTOR'S DAILY CONSTRUCTION REPORT PAGE 2

PROJECT NAME & NUMBER


Fariňas Residence

PHOTOGRAPHS
SIDENCE PROJECT
UCTION REPORT

C0NTRACT NO.

WORK DATE
May 05-December 07,2019
ESOURCES AND INSPECTIONS
INSPECTIONS & TEST's

Inspections or Test's Today


"None"

Inspections / Test's Scheduled next 48 hrs

"None"

K PROGRESS
SCHEDULE
Estimated % Ahead/ Behind / On Schedule
Complete

100.0% Behind Sched 10/17/2019

100.0% Ahead Sched 09/14/2019


100.0% Ahead Sched 10/03/2019
100.0% Ahead Sched 08/31/2019
70.0% Behind Sched 31/12/2019
100.0% Behind Sched 10/22/2019
100.0% Behind Sched 10/17/2019
30.0% Behind Sched 11/19/2019
100.0% Ahead Sched 06/12/2019
5.0% Behind Sched 08/03/2019
45.0% Behind Sched 12/19/2019
100.0% Behind Sched 10/03/2019

meetings and significant decisions.

) already done
nish @ 09-25-2019
ne
ne
on for the pvc pipe
eam electrical done by Darious

wing 1 or 2 Day's (as applicable)

the Second Floor Area

F S WORK DATE

√ √ December 02- 07,2019

CONSTRUCTION REPORT PAGE 2

WORK DATE
December 02- 07,2019