DAILY ACTIVITIES REPORT

PROJECT : PCSA Project


SCOPE OF WORK : Plumbing Work
NO : /DAR/LAM/III/2023
DATE :

MAN POWER OF THE


QTY TODAY ACTIVITIES
CONTRACTOR
Subcont No. DESCRIPTION LOCATION

01. Project Manager 1


02. Site Manager 1

04. Safety K3 1

05. Engineer 1

06. Drafter 2

07. Document Control 0

08. QC 1

09. Administration 1

Total 8

Mechanical Plumbing
14. Supervisor 1

15. Foreman 0
16. Skill 4
17. Helper 5

Total 10
WEATHER
CLOUDY DRIZZLE RAIN RAIN SHOWER
from : to : from: to: from : to :
Qty 18 from : to : from: to: from : to :
TOTAL 18 from : to : from: to: from : to :
Incoming Material / Tools Qty Used Material / Tools
1.METERAN 3
2.GEGEP 5
3.PALU 2
4.SPIDOL 5
5.ETC
Problems Solved Prepared by
Approved By : Proposed By :
PT.Lam Jagar Natio PT.Lam Jagar Natio

(........................................) (.......................................)
Project Manager Site Manager / Engineering
DAILY ACTIVITIES REPORT

PROJECT : PCSA Project


SCOPE OF WORK : Fire Fighting Work
NO : /DAR/LAM/III/2023
DATE :

MAN POWER OF THE


QTY TODAY ACTIVITIES
CONTRACTOR
Subcont No. DESCRIPTION LOCATION

01. Project Manager 1


02. Site Manager 1

04. Safety K3 1

05. Engineer 1

06. Drafter 2

07. Document Control 0

08. QC 1

09. Administration 1

Total 8

Mechanical Fire Fighting


14. Supervisor 1

15. Foreman 0
16. Skill 4
17. Helper 4

Total 9
WEATHER
CLOUDY DRIZZLE RAIN RAIN SHOWER
from : to : from: to: from : to :
Qty 17 from : to : from: to: from : to :
TOTAL 17 from : to : from: to: from : to :
Incoming Material / Tools Qty Used Material / Tools
1.METERAN 3
2.GEGEP 5
3.PALU 2
4.SPIDOL 5
5.ETC
Problems Solved Prepared by

Approved By : Proposed By :
PT.Lam Jagar Natio PT.Lam Jagar Natio

(.........................................) (.......................................)
Project Manager Site Manager / Engineering