CHEVRON GEOTHERMAL SALAK

CIVIL DAILY ACTIVITY RE

CLIENT :
CONTRACTOR :
SUB - CONTRACTOR :
CONTRAC :
PROJECT :
FIC NO. :

REPORT NO. :
CLIENT : LEGEND 06.00-07.00 07.00-08.00
DATE / DAY : C : CLER
WORKING HOURS : Hours CL : CLOUD
WORK CATEGORY : TR : TINY RAIN
LOCATION : HR : HEAVY RAIN
MANPOWER PRODUCTION
NO. TODAY ACTIVIES / ACHIEVEMENT UNIT LAST DAY TODAY QTY SUM
MANPOWER
NO. DIRECT QTY NO
1 Supervisor 1 Construction Manager
2 Foreman 2 Site Manager
3 Surveyor 3 PPC Manager
4 Helper 4 Engineering
5 Craftman 5 Project Control
6 General Labour 6 Logistic Manager
7 Access Control 7 Quality Control
8 First Aider 8 Welding Tracking
9 Operator B Loader 9 Material Control
10 Operator Mixer 10 Line Check
11 Driver 11 Safety Officer
12 Painter

TOTAL DIRECT TOTAL INDIRECT

NO. EQUIPMENT

PREPARED BY CHECKED BY
PT. REKAYASA INDUSTRI PT. SUPRACO
PT. REKAYASA INDUSTRI

AILY ACTIVITY REPORT

RAIN RECAPITULATION TABLE


08.00-09.00 09.00-10.00 10.00-11.00 11.00-12.00 12.00-13.00 13.00-14.00 14.00-15.00 15.00-16.00

SUMMARY ACTIVITIES
% NO. TOMORROW ACTIVITIES PLAN
NO TOOLS UNIT QTY
QTY

T TOTAL TOOLS

QTY NO. MATERIAL UNIT QTY

CHECKED BY APPROVED BY
PT. SUPRACO CHEVRON GEOTHERMAL SALAK, Ltd
CHEVRON GEOTHERMAL SALAK GENERAL PROCURM

PT. REKAYASA INDUSTRI SCH

PERCENTAGE Week 1 Week 2


NO WORK ITEM DESCRIPTION
OF WORK 11-Jul 18-Jul
1 PREPARATION 3.00% 3.00%
2 MOBILIZATION RAIL 5.00% 5.00%
3 INSTALL SCAFOLLDING 15.00% 5.00%
4 INSTALLATION RAIL 18.00%
5 MOBILIZATION OVER HEAD CRANE 7.00%
6 INSTALLATION OVER HEAD CRANE 52.00%
7 HOUSE KEEPING 0.00%
TOTAL PERCENTAGE … 100.00%
PROGRESS SCHEDULE… 3.00% 10.00%
TOTAL PROGRESS SCHEDULE… 3.00% 13.00%

CHEVRON GEOTHERMAL SALAK GENERAL PROCURM

PT. REKAYASA INDUSTRI ACTUAL EXECU

PERCENTAGE W.0 W.1


NO DESCRIPTION OF WORK
OF WORK 11-Jul 18-Jul
1 PREPARATION
2 MOBILIZATION RAIL
3 INSTALL SCAFOLLDING
4 INSTALLATION RAIL
5 MOBILIZATION OVER HEAD CRANE
6 INSTALLATION OVER HEAD CRANE
7 HOUSE KEEPING
TOTAL PERCENTAGE …
PROGRESS SCHEDULE…
TOTAL PROGRESS SCHEDULE…
GENERAL PROCURMENT & CONSTRUCTION SERVICE

SCHEDULE OF WORK

Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9


25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 8-Apr 5-Sep

5.00% 5.00%
6.00% 6.00% 6.00%
3.50% 3.50%
26.00% 26.00%
0.00%

5.00% 11.00% 6.00% 9.50% 3.50% 26.00% 26.00%


18.00% 29.00% 35.00% 44.50% 48.00% 74.00% 100.00%

GENERAL PROCURMENT & CONSTRUCTION SERVICE

ACTUAL EXECUTION OF WORK OF WORK

W.2 W.3 W.4 W.5 W.6 W.7 W.8


25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 8-Apr 5-Sep
WORK PACKAGE :

AWI 2 CONVERSION

FIP REFERENCE :

REMARKS

WORK PACKAGE :

AWI 2 CONVERSION

FIP REFERENCE :

REMARKS
CONTRUCTION PROGRESS UPDATE
GCSSD PROJECT
Updated: 25-Jul-14

PLAN PLAN ACTUAL ACTUAL PHYSICAL PRO


FIC No TITLE LOCATION START COMPLETE START COMPLETE
LAST WEEK

SLK-019 Well Hook Up AWI# 13-Apr-14 29-Jun-14 15-Apr-14 85.2%


2-4
AWI 2

CONTRUCTION PROGRESS UPDATE


GCSSD PROJECT
Updated: 18-Aug-14

PLAN PLAN ACTUAL ACTUAL PHYSICAL PRO


FIC No TITLE LOCATION START COMPLETE START COMPLETE
LAST WEEK

SLK-019 Well Hook Up AWI# 13-Apr-14 29-Jun-14 15-Apr-14 18-Jul-14 65.33%


2-4
AWI 2
PHYSICAL PROGRESS Update Plan
Finish ACTION LAST WEEK CURRENT PROGRESS
THIS WEEK CUMM Plan

11.64% 96.9% 67% 29-Jun-14 1. Complete all concrete work for 1. Complete all stimulation line pipe
PS, line,
2. Platform foundation and 2. startup line 10" , stimulation pipe
stimulation line foundation, support and platform,
3. Complete install pipe 3. Additional work Drain Line 2" of
downcommer 18" including valves Down comer line 18" tie-in to
existing drain line2" of stimulation
Line 3"

PHYSICAL PROGRESS Update Plan


Finish ACTION LAST WEEK CURRENT PROGRESS
THIS WEEK CUMM Plan

31.61% 96.94% 100.00% 29-Jun-14 1. Complete all stimulation line 1. Completed Installation of
pipe line, insulation,
2. startup line 10" , stimulation 2. finishing cable pulling & backfill
pipe support and platform, 3.finsihing touch up painting.
3. Additional work Drain Line 2" of 4. Punch list Preparation
Down comer line 18" tie-in to
existing drain line2" of stimulation
Line 3"
PLAN TO BE COMPLETED NEXT REMARKS/PROBLEM RESOURCES
WEEK

1. Completed Installation of Deliverable data from QC team Coordination between


insulation, related punch list requirement conctruction team.
2. finishing cable pulling & backfill
3.finsihing touch up painting.
4. Punch list Preparation

PLAN TO BE COMPLETED NEXT REMARKS/PROBLEM RESOURCES


WEEK

1. Punch List Deliverable data from QC team Coordination between


related punch list requirement conctruction team.
5/15/2022 3:26

ACTION BY

REKON - RBS

5/15/2022 3:26

ACTION BY

REKON - RBS