SHERIDAN DRIVE CENTER

Sheridan Drive, Camp John Hay, Baguio City

221101SHB-DAR-00008

DAILY ACTIVITY REPORT (JANUARY 18, 2023)

Engr. Simeon James D. Villacrusis Engr. Alvin Bernal ______________________

PE/PA/PIC/PLANNING ENGR. PM/AREA ADMINISTRATOR PLANNING DEPT./CMG


TABLE OF CFSDAONTENTS
Weather Report.................................................................................................................................... 1

Manpower Report................................................................................................................................ 2

Equipment And Vehicle Report..........................................................................................................2

Site Activities....................................................................................................................................... 4

Page 1 of 6
fsda

WEATHER REPOFSDART

DATE 18-January-23
WEATHER FINE/SUNNY CLOUDY RAINY STORMY
TIME 7:30 – 4:30    

MANPOWER REPORT

NO. POSITION QUANTITY JOB ROLE


I PROJECT MANAGER 1 DELIVERING PROJECT
II PROJECT IN – CHARGE 1 MONITORING PROJECT PROGRESS
III QA/QC ENGINEER 1 SUPERVISE MONITORING ACTIVITY SEQUENCE
PRODUCTION
IV LINE & GRADE ENGINEER 1 ALLIGNMENT MONITORING OF SITE
V QUANTITY SURVEYOR 1 MANAGE THE COST ON A CONSTRUCTION
PROJECT
VI MEPF’S ENGINEER 1 PLANING DESIGN OF MECHANICAL,
ELECTRICAL, PLUMBING.
VII SAFETY OFFICER 3 1 PLANNING EMPLEMENTING AND OVERSEEING
EMPLOYEE SAFETY WORK
VIII SAFETY OFFICE 2 1 PLANNING EMPLEMENTING AND OVERSEEING
EMPLOYEE SAFETY WORK
IX CEB 14 MANPOWER IN CONSTRUCTING BUILDING
X LPQ 5 MANPOWER IN CONSTRUCTING BUILDING

fsda

TOTAL MANPOWER COUNT 27

Page 2 of 6
EQUIPMENT AND VEHICLE REPORT

NO EQUIPMENT/VEHICLE OPERATOR/DRIVER SCOPE OF WORK OPERATING


. fsda(With Plate Number) HRS

1 BACKHOE/SY215C VIRGILLO DOMINGO JR. EXCAVATION FOR CRANE 8


FOOTINGS
2 WELDING MACHINE CEB/RYAN CONSTRUCTION OF WAREHOUSE 8
3 CHIPPING GUN CEB/RYAN CURING OF TANK 8
4 DUMP TRUCK ADMIN/JESS DELIVERY OF MATERIALS 8
5 TRAILER TRUCK ADMIN DELIVERY OF TOWER CRANE 8
PARTS

SITE ACTIVITIES
PERCENTAGE OF
NO
ACTIVITY FLOOR/GL/LOCATION COMPLETION
.
(ACTUAL)

1 CONSTRUCTION OF CRANE FOOTING LOWER GROUND 70%


2 CONSTRUCTION OF TEMPORARY FACILITIES UPPER GROUND 40%
3 CONSTRUCTION OF WARE HOUSE UPPER GROUND 60%
4 CONSTRUCTION OF POWER HOUSE UPPER GROUND 55%

Page 3 of 6
PROGRESS PHOTO REFLECTED KEY PLAN

EXCAVATION AT AREA 4

PERIMETER LAY-OUT

Page 4 of 6
POWER HOUSE BEAM FORMWORKS INSTALLATION

fsda PROGRESS PHOTO REFLECTED KEY PLAN

INSPECTION OF TOWER CRANE FOUNDATION PRIOR TO CONC.POURING

CHB LAY-OUT FOR TEMFACIL