ACTIVITIES
1.0 SLEEVINGING OF BRANCHLINES AND DRAIN / STAB OUT AT ROOFDECK
2.0 INSTALLATION OF CROSSMAIN AT 30/F
3.0 INSTALLATION OF RUBBER GASKET IN RISER LOW AND HIGH ZONE AT B-3 UP
4.0 LAYOUT AND FABRICATION OF DUCT AT 3/F
5.0 INSTALLATION OF CI VERTICAL AT 12/F
6.0 INSTALLATION AND REPAIR WATERLINE AND SANITARY AT 20/F
7.0 PREPARATION OF TESTING WATERLINE AND RESTORATION AT 15/F