Date: 21/04/2021
Sr. TOPICS PHOTO/ DETAILS Direct Manpower: 78
No Indirect Manpower: 17
1 TOOL BOX TALK

(a) Life Saving rules,


Heavy equipment
safety, Safe driving
awareness.

2 WORK PERMIT
Total No of Permit. 12 S Work Equipment’s/Tools Hot Work Permit Manpo Company
r. Permit wer
(a) Hot Work Permit N No.
= 10 o
(b) Cold Work Permit 1 0509 Mixer, hand tools Shuttering and concrete cutting work for gate 02 Advanced Elements
= 02 foundation.
2 0504 Bobcat, Forklift and hand tools Walkways interlock installation work at road # 1-5 04 Hexagon (civil)
and roundabout.
3 0505 Hand tools, cutter ,grinder Expansion joint cutting and sealant filling on 03 Advanced Elements
Helipad foundation.
4 0501 Grader ,portable generator ,hand tools Permanent drain line. 04 Advanced Elements

5 0503 Mixer machine hand tools Interlock installation works in road 1-5 03 Hexagon (civil)

6 0500 Generator .grinder ,jack hammer Concrete chipping and preparation of gathering 12 Al-khadi
[Type here]

tent column
7 0507 JCB,hand tools Excavation, Pipe laying and Backfilling for 12 Hexagon
Irrigation system.
8 0499 Hand tools Water well pump termination and commissioning 04 Al-Aswad
work.
9 0506 Dump truck loader,Jcb Housekeeping and garbage removing works 06 Advance Elements

Cold Work Permit

10 0774 Hand tools Road cleaning works and housekeeping 04 Al-Aswad


[Type here]

3 Daily Activities
Guard house stair case foundation work in S.T.P. Housekeeping and Garbage removing work.

Walkways interlock installation work at road # 1-5 and Walkways Curve stone installation work.
roundabout.
Expansion joint cutting and sealant filling on Helipad foundation. Concrete chipping and preparation of gathering tent column
Backfilling and compaction work for gate foundation. Excavation, Pipe laying and Backfilling for Irrigation system.
Water well pump termination and commissioning work.
4 HEIGH RISK
ACTIVITIES
5 ACHIVEMENT ZERO INCIDENT/ ACCIDENT

6 LOOK AHEAD Hand Rail Installation for the Kitchen &Clinic, Excavation for the 15 m Gate foundation near to the helipad, Swimming Pool Tiles Installation,
ACTIVITEIS Interlock and curbstone work, Gathering Tend foundation backfilling, Backfilling and leveling for Around stp Area, Backfilling and leveling roads
and sport area, Backfilling for inside the roundabout, Sludge tank leak rectification, Excavation & layer by layer backfilling and compaction for
the street poles, Foundation preparation for the control panel water well pump, RO {LIGHTING , POWER SOCKETS & FIRE ALARM}, Grounding connection
for the AC, INSTALLATION OF STREET LIGHTING POLES {OFFICE}, INSTALLATION OF STREET LIGHT POLES IN PLAYGROUND 25 MTR, CLOSING OF EIL
COMMENTS AND OPEN RFI'S, Irrigation water tank commissioning, Spindle Surface cover installation transmission & force main line, Kitchen commissioning(Air balancing for
Duct& Exhaust fans), A/C Rectification and inspection, Diesel Tank flushing with Diesel, Potable water supply installation for STP, Fire networking commissioning with overall
network, Air valve installation for fire network, Inspection Chamber Extension for STP, Water well existing pump remove and install the new pump.

7 MAJOR INCIDENT/
NEAR MISS
[Type here]

8
CONCERN & ISSUES CONSTRUCTION

9 Safety
1. Sabre Alam 2. Hafiz Sher Dil
3 Carlose 4 Sahil

10 TCF- 1 Project/ Sign:


Construction Manager