TEMPORARY CONSTRUCTION
FACILITY
TCF-1
Date: 24/04/2021
Sr. TOPICS PHOTO/ DETAILS Direct Manpower: 78
No Indirect Manpower: 16
1 TOOL BOX TALK

(a) Covid-19
precautions, its effect
on mental health
how to cop with
it.Confined space
Entry

2 WORK PERMIT
Total No of Permit. 14 S Work Equipment’s/Tools Hot Work Permit Manpo Company
r. Permit wer
(a) Hot Work Permit N No.
= 12 o
(b) Cold Work Permit 1 0529 Generator,Grinder,jack hammer Concrete chipping,column Installation and 02 Al-Kadi
= 02 ,welding machine ,forklift welding works in gathering tent
(C) Confined Space work 2 0524 JCB ,Bobcat compactor Excavation leveling and compaction work ,for 04 Hexagon (civil)
=01 walkway near guard house at Road 2
3 0525 Bobcat Jcb ,hand tools Excavation and compaction fork for sign board 03 Advanced Elements
foundation
4 0527 Mixer machine hand tools Walkway curbstone installations works 04 Advanced Elements

5 0528 Mixer machine Jcb, hand tools Steel fixing and shuttering work for gate 03 Hexagon (civil)
foundation column post
6 0523 Generator. grinder, jack hammer Expansion joint cutting and seabed filling works 12 Al-khadi
on helipad foundation
7 0526 JCB, bobcat Housekeeping and garbage removal works 4 Hexagon

8 0529 Welding machine Welding works for irrigation system in gathering 04 Al-Aswad
[Type here]

tent.
9 0519 JCB ,hand tools Excavation ,shoring and fire water line leakage 06 Advance Elements
rectifications
10 0532 JCB and Hand tools Excavation pipe laying and Backfilling works for 04 Hexagon
irrigation works
Cold Work Permit

11 0778 Hand tools Scaffolding erfection and modification in 04 Advance Elements


Gathering tent area
Confined Space Work

0398 Excavation for fire water line Hand tools 04 Advance Elements
rectifications
[Type here]

3 Daily Activities
Guard house stair case foundation work in S.T.P. Housekeeping and Garbage removing work.

Walkways interlock installation work at road # 1-5 and Walkways Curve stone installation work.
roundabout.
Expansion joint cutting and sealant filling on Helipad foundation. Concrete chipping and preparation of gathering tent column
Backfilling and compaction work for gate foundation. Excavation, Pipe laying and Backfilling for Irrigation system.
Water well pump termination and commissioning work.
4 HEIGH RISK
ACTIVITIES
5 ACHIVEMENT ZERO INCIDENT/ ACCIDENT

6 LOOK AHEAD Hand Rail Installation for the Kitchen &Clinic, Excavation for the 15 m Gate foundation near to the helipad, Swimming Pool Tiles Installation,
ACTIVITEIS Interlock and curbstone work, Gathering Tend foundation backfilling, Backfilling and leveling for Around stp Area, Backfilling and leveling roads
and sport area, Backfilling for inside the roundabout, Sludge tank leak rectification, Excavation & layer by layer backfilling and compaction for
the street poles, Foundation preparation for the control panel water well pump, RO {LIGHTING , POWER SOCKETS & FIRE ALARM}, Grounding connection
for the AC, INSTALLATION OF STREET LIGHTING POLES {OFFICE}, INSTALLATION OF STREET LIGHT POLES IN PLAYGROUND 25 MTR, CLOSING OF EIL
COMMENTS AND OPEN RFI'S, Irrigation water tank commissioning, Spindle Surface cover installation transmission & force main line, Kitchen commissioning(Air balancing for
Duct& Exhaust fans), A/C Rectification and inspection, Diesel Tank flushing with Diesel, Potable water supply installation for STP, Fire networking commissioning with overall
network, Air valve installation for fire network, Inspection Chamber Extension for STP, Water well existing pump remove and install the new pump.

7 MAJOR INCIDENT/
NEAR MISS
[Type here]

8
CONCERN & ISSUES CONSTRUCTION

9 Safety
1 Hafiz Sher Dil

10 TCF- 1 Project/ Sign: