DEMOLITION METHOD STATEMENT
Scope of work
The proposals constitute inappropriate development in the Green Belt, however the very special
circumstances outweigh the harm to the openness of the Green Belt and are considered
acceptable. There would be a benefit to the site by removing the existing porta cabins any
visual harm of the fence would be mitigated by additional planting. The permission is for a
temporary period and is considered acceptable for approval subject to conditions. This project
will eliminate the interim facilities to removed the porta cabin and receipt the loader travels out
the Aramco territories.
Equipment Requirement.
1 Crane
2 JCB
3 Skid loader
Tools Requirement.
Mechanical Tools
Electrical Tools
Plumbing Tools
Civil Tools
HSE Manager
Site Manager shall understand the terms accident, hazard, hazard
control and loss control. The front–line supervisor and upper
management should know the procedures for accident prevention
and the steps to follow should any accident, serious or minor, occur.
They should also realize the direct and indirect cost of accidents and
know the best approach to safety performance. He is responsible for
the subcontractors and will help him (subcontractors) in establishing
safe work practices in whatever way possible.
Safety Supervisor
Safety Officer
Site Engineers
Foreman/Supervisor
Workers Responsibilities
DEMOLITION METHOD STATEMENT
Disconnect the main line of water supply by closing valve and dade plug.
Open all the tabs to drain all water from the water line.
Disconnect all the main sewerage line and dade plug from all porta cabins.
Make sure that water heater is disconnected.
Disconnected out door AC unit remove from the porta cabin
Civil Works