2 – Plans for Contractor CSAR 10.3 2.1. Review and Approval of Comprehensive Layout Plans (design drawings, site plan and specifications) for Contractor Camps
Camps and Project Support and Project Support facilities
Facilities CSAR 11.1(C) No evidence
GI 298.010, sec.
5.17 – 5.20
CSAR11.1(H) 2.2. Pre-occupancy Inspection of the Camp and Project Support Facilities
No evidence
GI 298.010 5.17 –
5.20
CSAR11.1(C) 2.3. Approval of the Camp and Project Support Facilities
No evidence
GI 298.010 5.17 –
5.20
CSAR 11.1(A & B) 2.4. Site Verification of Updated and Approved Layout Plans against the As-built
No evidence
GI 298.010, sec.
5.22
CSAR 10.3(B) 2.5. Approval Date of the Camp and Project Support Facilities Layout Plans against the Starting Date of Construction of
mentioned Facilities
CSAR 11.1(C) No evidence
4 – Work Site Medical 4.1. Approval of the Clinic
Facilities (Clinics) CSAR 10.3(B) No evidence
GI 298.010, sec.
5.17-5.20
CSAR 9.3(E)
CSAR 9.3(G) 4.2. Independent Inspection / audit of the Clinic
No evidence
5 – Medical Staff and CSAR 9.4 5.1. JHAH or SA approved CV’s of Medical Staff (Doctor, Nurse)
Associated Medical No evidence
Requirements MMSR – Standard
2, Figure 2-3 (CV
Approval Process)
CSAR 9.4(E) 5.2. Availability and validity of MOH Licenses and MMSR-Specific Required Trainings
No evidence.
MMSR, Figure 2-2
(Ongoing
Education and
Training & CME)
6 - Ambulance 6.1. Availability of Dedicated and Acceptable Full Size Ambulance
CSAR 10.3 No evidence
GI 298.010 5.17 –
5.20
CSAR 9.5(B,C & D)
MMSR – Figure 6-
1 (Ambulance-
Minimal Vehicle
Specifications)