TEMPORARY CONSTRUCTION
FACILITY
TCF-1
Date: 27/04/2021
Sr. TOPICS PHOTO/ DETAILS Direct Manpower: 82
No Indirect Manpower: 18
1 TOOL BOX TALK

(a) Welding cutting


grinding hazards,
hot work activities.

2 WORK PERMIT
Total No of Permit. 12 S Work Equipment’s/Tools Hot Work Permit Manpo Company
r. Permit wer
(a) Hot Work Permit N No.
= 09 o
(b) Cold Work Permit 1 0559 Grinder, Hand tools. Expansion joint cutting and sealant filing woks on 03 Advance Elements
= 02 helipad foundation
© Confined Space 2 0560 Grinder ,Hand tools. Excavation and pipe sleve installation and 04 Hexagon (civil)
work backfilling works.
=01 3 0562 Hand tools JCB Street light pole termination works and excavation 03 Advanced Elements
works
4 0566 Mixer machine hand tools Walkway curbstone installations works 04 Advanced Elements

5 0567 Mixer machine Jcb, hand tools Excavation backfilling pipe lying works for 08 Hexagon (civil)
irrigation system
[Type here]

6 0561 JCB,SACABA ,Butt Machine, Gas Excavation, shoring and fire water leakage 3 Al-khadi
tester. rectification works. And concrete casting works
7 0565 , Generator Grinder welding machine Gathering tent column and purlines welding works 6 Hexagon

8 0570 Grinder,hand tools 15m wide gate preparation and installation works 04 Al-Aswad

9 0568 JCB ,hand tools HDPE pipe connection and joint welding works 06 Advance Elements

Cold Work Permit

10 0400 Hand tools Interlock installation works 04 Advance Elements

Confined Space Work

11 0451 Excavation for fire water line Hand tools 04 Advance Elements
rectifications
[Type here]

3 Daily Activities
Guard house stair case foundation work in S.T.P. Column installation work in Gathering tent

Walkways interlock installation work at road # 1-5 and Walkways Curve stone installation work.
roundabout.
Expansion joint cutting and sealant filling on Helipad foundation. Concrete chipping and preparation of gathering tent column
Backfilling and compaction work for gate foundation. Excavation, Pipe laying and Backfilling for Irrigation system.
Fire waterline rectification work office area Water well pump termination and commissioning work.
4 HEIGH RISK
ACTIVITIES
5 ACHIVEMENT ZERO INCIDENT/ ACCIDENT

6 LOOK AHEAD Hand Rail Installation for the Kitchen &Clinic, Excavation for the 15 m Gate foundation near to the helipad, Swimming Pool Tiles Installation,
ACTIVITEIS Interlock and curbstone work, Gathering Tend foundation backfilling, Backfilling and leveling for Around stp Area, Backfilling and leveling roads
and sport area, Backfilling for inside the roundabout, Sludge tank leak rectification, Excavation & layer by layer backfilling and compaction for
the street poles, Foundation preparation for the control panel water well pump, RO {LIGHTING , POWER SOCKETS & FIRE ALARM}, Grounding connection
for the AC, INSTALLATION OF STREET LIGHTING POLES {OFFICE}, INSTALLATION OF STREET LIGHT POLES IN PLAYGROUND 25 MTR, CLOSING OF EIL
COMMENTS AND OPEN RFI'S, Irrigation water tank commissioning, Spindle Surface cover installation transmission & force main line, Kitchen commissioning(Air balancing for
Duct& Exhaust fans), A/C Rectification and inspection, Diesel Tank flushing with Diesel, Potable water supply installation for STP, Fire networking commissioning with overall
network, Air valve installation for fire network, Inspection Chamber Extension for STP, Water well existing pump remove and install the new pump.

7 MAJOR INCIDENT/
NEAR MISS
[Type here]

8
CONCERN & ISSUES CONSTRUCTION

9 Safety
1 Hafiz Sher Dil

10 TCF- 1 Project/ Sign: