You are on page 1of 2

PRIORITY INFRASTRUCTURE REMAINING

WORKS for
TCF-1,2 & 3
Contract No: 6510928546

Daily Activities list – TCF3 (Safety Aramco)


S PERMIT N0.
N
WORK DESCRIPTION #
DATE LOCATION
1 Surface preparation and inspection in helipad area for sealent. HWP. 2404 16-08-2022 Helipad Area
2 Curbstone & interlock repairing work in playground area HWP.1841 16-08-2022 Camp Area
3 Housekeeping in all areas HWP.2419 16-08-2022 All site
4 Surface preparation and painting coating works in Helipad HWP.2403 16-08-2022 Helipad Area
area
5 Surface preparation of diesel tank and light pole found HWP.2411 16-08-2022 CAMP AREA
6 Excavation, grounding cable placement and backfilling leveling HWP.1998 16-08-2022 HELIPAD Area
work
7 Grouting and Ceramic tiles installation work in swimming pool HWP.2412 16-08-2022 Camp Area
area
08 Grouting and ceramic tiles installation in swimming pool area CSP.0272 16-08-2022 Camp area
09 Paint coating work CWP.0156 16-08-2022 STP Area
10 Manual excavation and repair for irrigation cable placement. CWP.0158 16-08-2022 Office Area
11 Arranging of cable grounding as well as panel labeling CWP.0154 16-08-2022 Camp AREA
12 Aggregate placement work HWP.2417 16-08-2022 Camp area
13 Surface preparation and painting work in playground area HWP.1827 16-08-2022 Camp area
14 Soil mixing, placement and grass installation work HWP.2401 16-08-2022 Camp Area
15 Wearing course and asphalt laying in R11 HWP.2418 16-08-2022 Road 11
16 Repairing of irrigation waterline together with sprinkler and CWP.0157 16-08-2022 Camp Area
deep line
17 Repairing of irrigation waterline together with sprinkler and CWP.0153 16-08-2022 Office Area
deep line
18 Scaffolding erection in clinic area CWP.0159 16-08-2022 Camp Area
19 Manhole cover installation and repairing work HWP.2402 16-08-2022 Office Area

TOTAL NUMBER OF LOCATIONS: = 19 PERMITS CODE:


HWP – HOT WORK PERMIT
CAMP area = 11 CWP – COLD WORK PERMIT
Office area = 3 CSP – CONFINED SPACE PERMIT
Fuel Station= 0 LFWP – LIFTING WORK PERMIT
STP= 1
Helipad area= 03
Road 11 01
TOTAL NUMBER OF PERMITS = 19
PRIORITY INFRASTRUCTURE REMAINING
WORKS for
TCF-1,2 & 3
Contract No: 6510928546

HWP = 12
CWP = 06
CSP=1

Note: There are times that the workers were coming from the other sites and they will be added
here without noticing.
And some also were pulled out for another area without information.
REMINDERS: Permits are added but they are the same person that’s working.