You are on page 1of 1

Technical Query

Java LG Project – TSF and Civil Construction Work

TECHNICAL QUERY NO: DATE: PAGE:


AEI-TQE-CVL-0153-0005 27/12/2022 3 pages
CONTRACT NO: 5200000000
CONTRACTOR: PT. ASUKA ENGINEERING INDONESIA
AREA/SUBJECT Main Air Compressor Coordinate for C1161A and C1161B
Full description / justification of Technical Query: No of Attachments:
2 pages

In IFC Drawing (LDI-CA10-G-ZA1018.102), in Sheet 1 mentioned that the MAC C1161A Foundation is
at PE 205.327 , PN 629.000, and also in Sheet 2 mentioned that the MAC C1161B Foundation is at PE
205.327 , PN 629.000. In staking out, the MAC C1161A foundation is at correct / tolerated area, but for
MAC C1161B foundation still can not staked out because the coordinate is still unmatch.

Therefore we ask about the correct coordinate of MAC C1161B foundation.

Date: / Originator: Date: / Contractor Site Manager:


27/12/2022 – Muhammad Rabani 27/12/2022 – Mujikan

LINDE verification / response: No of Attachments:

Date: / Linde Project: Date: / LINDE Lead Engineer: