Site Claims
Document Reference No: Date of Record28/09/2022
1. Description
Job : DLE-056_TIALOC
Type of Claim : CONTAINER DAMAGED
Pictures
2. Description
Pictures
3. Description
Job : DLE-056_TIALOC
Type of Claim : PKL shows wrong cont number
4. Description
Job : DLE-057_GTM_Utility
Type of Claim : PKL shows wrong part name in cont
PKL shows these parts in cont. number: CIPU_5285520 -> But, these parts are packed in cont. number CAIU
8268624
Pictures:
5. Description
Job : DLE-057_GTM_Utility
Type of Claim : Wrong part name in the label
DESCRIPTION :
The part name is not same between the label and punched number on part
Pictures:
6. Description
DESCRIPTION :
Safety door stopper orentation wrongly welded
Rectification work done in Dexsion Factory& Installation work done insite
So many excess holes on ladder.Dexsion patchup the holes and paint touch work done
One step ladder rod not welded in VN.Dexsion done the rectification work accordingly
Pictures:
7. Description
DESCRIPTION :
Due to fin plate fabrication error,Dexsion installer required to make slot holes on the finplate.
Pictures:
8. Description
Job : DLE-057-UTILITY
Type of Claim : DRAWING errors
DESCRIPTION :
Utility staircase GL-15 drawing error. Detailer missed out the ALC wall panel.So as per site condition,we
required tof abricate &shift the bracing beam on RC Column location.
Due to drawing error,we required to cut the excess brackets on the stringer beam
Pictures: