Java LG Project – TSF and Civil Construction Work

TECHNICAL QUERY NO: DATE: PAGE:


AEI-TQE-CVL-0153-0015 11/1/2023 2 pages
CONTRACT NO: 5200000000
CONTRACTOR: PT. ASUKA ENGINEERING INDONESIA
AREA/SUBJECT Cold Box, Raft Rebar Difference
Full description / justification of Technical Query: No of Attachments:
1 pages

In TQE no. 15, Plan Foundation mentioned that the Cold Box Foundation Top Rebar is D22-100 and
Bottom Rebar is D25-100, and in Section mentioned that the Cold Box Foundation Top Rebar is D22-
200 and Bottom Rebar is D25-100.

Therefore we ask about the correct rebar of Cold Box Raft.

Date: / Originator: Date: / Contractor Site Manager:


11/1/2023 – Nuroh Romdhonah 11/1/2023 – Doni Phasa

LINDE verification / response: No of Attachments:

Date: / Linde Project: Date: / LINDE Lead Engineer: