Balance of Plant (BOP) Mechanical,Piping & Field instrumentation works Package-03 for Field Gas Gathering Station, Baghjan,Assam

DAILY PROGRESS REPORT


WORK ORDER NUMBER GEMC-511687726216255 DPR NO:18
OWNER M/s Oil India Ltd Date: 04.02.2023
EPM CONSULTANT JAYATHE PETROTECH ENGINEERS & CONSULTANTS Weather Condition: clear
EPC CONTRACTOR HAL Offshore Limited

TOTAL SCOPE PREV. TODAY WORKDONE


ACTIVITY START ACTIVITY END NEXT DAY CUMMULATIV BALANCE
SL NO DESCRIPTION DATE DATE UNIT OF WORK ( As WORK PLAN E WORKDONE WORK REMARKS
per drawing ) DONE ACTUAL
PLANNED
DAY NIGHT

C1 Fabrication of all items, NDT, Radiography, 3rd party inspection, Hydro test, Surface Preparation and Painting as certified by EPMC/3rd party on pro-rata basis as per the approved schedule of activities activities.
C1.01 Mechanical
C1.01.01 Fabrication,NDT, Hydrotest, surface preparation, painting of Fire water tank-TK3401A.
C1.01.01.01 Fabrication of Roof Plate Activity completed at Jorhat Fabrication Yard;
C1.01.01.02 Fabrication of Shell Plate Activity completed at Jorhat Fabrication Yard;
C1.01.01.03 Fabrication of bottom plate Activity completed at Jorhat Fabrication Yard;
C1.01.01.04 Fabrication of Tank structural item Activity completed at Jorhat Fabrication Yard;
C1.01.01.05 Surface Preparation & Painting
C1.01.01.06 Fabrication of Roof Nozzles
C1.01.01.07 Fabrication of Shell Nozzles
C1.01.02 Fabrication,NDT, Hydrotest, surface preparation, painting of Fire water tank-TK3401B.
C1.01.02.01 Fabrication of Roof Plate Activity completed at Jorhat Fabrication Yard;
C1.01.02.02 Fabrication of Shell Plate Activity completed at Jorhat Fabrication Yard;
C1.01.02.03 Fabrication of bottom plate Activity completed at Jorhat Fabrication Yard;
C1.01.02.04 Fabrication of Tank structural item Activity completed at Jorhat Fabrication Yard;
C1.01.02.05 Surface Preparation & Painting
C1.01.02.06 Fabrication of Roof Nozzles
C1.01.02.07 Fabrication of Shell Nozzles
C1.01.03 Fabrication,NDT, Hydrotest, surface preparation, painting of Raw water effluent tank-TK3101A.
C1.01.03.01 Fabrication of Roof Plate Activity completed at Jorhat Fabrication Yard;
C1.01.03.02 Fabrication of Shell Plate Activity completed at Jorhat Fabrication Yard;
C1.01.03.03 Fabrication of bottom plate Activity completed at Jorhat Fabrication Yard;
C1.01.03.04 Fabrication of Tank structural item Activity completed at Jorhat Fabrication Yard;
C1.01.03.05 Surface Preparation & Painting
C1.01.03.06 Fabrication of Roof Nozzles
C1.01.03.07 Fabrication of Shell Nozzles
C1.01.04 Fabrication,NDT, Hydrotest, surface preparation, painting of Raw water effluent tank-TK3101B.
C1.01.04.01 Fabrication of Roof Plate Activity completed at Jorhat Fabrication Yard;
C1.01.04.02 Fabrication of Shell Plate Activity completed at Jorhat Fabrication Yard;
C1.01.04.03 Fabrication of bottom plate Activity completed at Jorhat Fabrication Yard;
C1.01.04.04 Fabrication of Tank structural item Activity completed at Jorhat Fabrication Yard;
C1.01.04.05 Surface Preparation & Painting
C1.01.04.06 Fabrication of Roof Nozzles
C1.01.04.07 Fabrication of Shell Nozzles
C1.01.05 Fabrication,NDT, Hydrotest, surface preparation, painting of Raw water effluent tank-TK3101C.
C1.01.05.01 Fabrication of Roof Plate Activity completed at Jorhat Fabrication Yard;
C1.01.05.02 Fabrication of Shell Plate Activity completed at Jorhat Fabrication Yard;
C1.01.05.03 Fabrication of bottom plate Activity completed at Jorhat Fabrication Yard;
C1.01.05.04 Fabrication of Tank structural item Activity completed at Jorhat Fabrication Yard;
C1.01.05.05 Surface Preparation & Painting
C1.01.05.06 Fabrication of Roof Nozzles
C1.01.05.07 Fabrication of Shell Nozzles
C1.01.06 Fabrication,NDT, Hydrotest, surface preparation, painting of Treated water tank-TK3104A.
C1.01.06.01 Fabrication of Roof Plate Activity completed at Jorhat Fabrication Yard;
C1.01.06.02 Fabrication of Shell Plate Activity completed at Jorhat Fabrication Yard;
C1.01.06.03 Fabrication of bottom plate Activity completed at Jorhat Fabrication Yard;
C1.01.06.04 Fabrication of Tank structural item Activity completed at Jorhat Fabrication Yard;
C1.01.06.05 Surface Preparation & Painting
C1.01.06.06 Fabrication of Roof Nozzles
C1.01.06.07 Fabrication of Shell Nozzles
C1.01.07 Fabrication, NDT, Hydrotest, surface preparation, painting of Treated water tank-TK3104B.
C1.01.07.01 Fabrication of Roof Plate Activity completed at Jorhat Fabrication Yard;
C1.01.07.02 Fabrication of Shell Plate Activity completed at Jorhat Fabrication Yard;
C1.01.07.03 Fabrication of bottom plate Activity completed at Jorhat Fabrication Yard;
C1.01.07.04 Fabrication of Tank structural item Activity completed at Jorhat Fabrication Yard;
C1.01.07.05 Surface Preparation & Painting
C1.01.07.06 Fabrication of Roof Nozzles
C1.01.07.07 Fabrication of Shell Nozzles
C1.02 Piping/Pipeline
C1.02.01 Pipe Fabrication of Process Gas Piping
C1.02.02 Pipe Fabrication of Fuel Gas Piping
C1.02.03 Pipe Fabrication of Flare Piping
C1.02.04 Pipe Fabrication of Drain Piping
C1.02.05 Pipe Fabrication of Fire Water Piping
C1.02.06 Pipe Fabrication of Service Water Piping
C1.02.07 Pipe Fabrication of Portable Water Piping
C1.02.08 Pipe Fabrication of Instrument Air Piping
C1.02.09 Pipe Fabrication of Utility Air Piping
C1.02.10 NDT

C2 All site work including Site welding, Erection / Installation, Piping, Hook-up to the systems, Painting, Instrumentation, Electrical works and Testing as certified by EPMC/OIL on pro-rata basis as per the approved schedule of
activities
C2.01 Mechanical
C2.01.01 Erection/Installation of Fire water tank-TK3401A.
C2.01.01.01 Tank Erection/Installation of Roof Plate
C2.01.01.02 Tank Erection/Installation of Shell Plate
C2.01.01.03 Tank Erection/Installation of bottom plate
C2.01.01.04 Tank Erection/Installation of Roof structure
C2.01.01.05 Tank Erection/Installation of Roof nozzles
C2.01.01.06 Tank Erection/Installation of shell nozzles
C2.01.01.07 NDT
C2.01.01.08 Hydro Test
C2.01.02 Erection/Installation of Fire water tank-TK3401B.
C2.01.02.01 Tank Erection/Installation of Roof Plate
C2.01.02.02 Tank Erection/Installation of Shell Plate
C2.01.02.03 Tank Erection/Installation of bottom plate
C2.01.02.04 Tank Erection/Installation of Roof structure
C2.01.02.05 Tank Erection/Installation of Roof nozzles
C2.01.02.06 Tank Erection/Installation of shell nozzles
C2.01.02.07 NDT
C2.01.02.08 Hydro Test
C2.01.03 Erection/Installation of Raw water effluent tank-TK3101A.
C2.01.03.01 Tank Erection/Installation of Roof Plate
C2.01.03.02 Tank Erection/Installation of Shell Plate
C2.01.03.03 Tank Erection/Installation of bottom plate
C2.01.03.04 Tank Erection/Installation of Roof structure
C2.01.03.05 Tank Erection/Installation of Roof nozzles
C2.01.03.06 Tank Erection/Installation of shell nozzles
C2.01.03.07 NDT
C2.01.03.08 Hydro Test
C2.01.04 Erection/Installation of Raw water effluent tank-TK3101B.
C2.01.04.01 Tank Erection/Installation of Roof Plate
C2.01.04.02 Tank Erection/Installation of Shell Plate
C2.01.04.03 Tank Erection/Installation of bottom plate
C2.01.04.04 Tank Erection/Installation of Roof structure
C2.01.04.05 Tank Erection/Installation of Roof nozzles
C2.01.04.06 Tank Erection/Installation of shell nozzles
C2.01.04.07 NDT
C2.01.04.08 Hydro Test
C2.01.05 Erection/Installation of Raw water effluent tank-TK3101C.
C2.01.05.01 Tank Erection/Installation of Roof Plate
C2.01.05.02 Tank Erection/Installation of Shell Plate 03.02.2023 No's 30 4 2 2 0 0 6 24 S4 shell vertical joint under progress
C2.01.05.03 Tank Erection/Installation of bottom plate 01.02.2023 No's 16 16 0 0 0 0 16 0 Laying and fitup completed;welding bal
C2.01.05.04 Tank Erection/Installation of Roof structure
C2.01.05.05 Tank Erection/Installation of Roof nozzles
C2.01.05.06 Tank Erection/Installation of shell nozzles
C2.01.05.07 NDT
C2.01.05.08 Hydro Test
C2.01.06 Erection/Installation of Treated water tank-TK3104A.
C2.01.06.01 Tank Erection/Installation of Roof Plate
C2.01.06.02 Tank Erection/Installation of Shell Plate
C2.01.06.03 Tank Erection/Installation of bottom plate
C2.01.06.04 Tank Erection/Installation of Roof structure
C2.01.06.05 Tank Erection/Installation of Roof nozzles
C2.01.06.06 Tank Erection/Installation of shell nozzles
C2.01.06.07 NDT
C2.01.06.08 Hydro Test
C2.01.07 Erection/Installation of Treated water tank-TK3104B.
C2.01.07.01 Tank Erection/Installation of Roof Plate 04.02.2023 No's 15 0 0 9 0 6 9 6 Laying under progress
C2.01.07.02 Tank Erection/Installation of Shell Plate 18.01.2023 No's 30 12 0 0 0 0 12 18 S4&S5 erection and welding completed
C2.01.07.03 Tank Erection/Installation of bottom plate 12.01.2023 No's 16 16 0 0 0 0 16 0 Laying completed,welding balance
C2.01.07.04 Tank Erection/Installation of Roof structure 31.01.2023 04.02.2023 Percentage 100 95 5 5 0 0 100 0
C2.01.07.05 Tank Erection/Installation of Roof nozzles
C2.01.07.06 Tank Erection/Installation of shell nozzles
C2.01.07.07 NDT
C2.01.07.08 Hydro Test
C2.01.08 Erection/Installation of Other Mechanical Item
C2.01.08.01 Erection/Installation of PRODUCTION SEPARATORS
C2.01.08.02 Erection/Installation of HP SEPARATOR
C2.01.08.03 Erection/Installation of FUEL GAS CONDITIONING UNIT
C2.01.08.04 Erection/Installation of LP FLARE KOD
C2.01.08.05 Erection/Installation of HP FLARE KOD
C2.01.08.06 Erection/Installation of LP FLARE KOD PUMP
C2.01.08.07 Erection/Installation of HP FLARE KOD PUMP
C2.01.08.08 Erection/Installation of GROUND FLARE PACKAGE
C2.01.08.09 Erection/Installation of WATER BATH HEATER
C2.01.08.10 Erection/Installation of CLOSED BLOW DOWN VESSEL
C2.01.08.11 Erection/Installation of CLOSED BLOW DOWN OIL RECYCLE PUMP
C2.01.08.12 Erection/Installation of WATER TREATMENT SYSTEM
C2.01.08.13 Erection/Installation of INSTRUMENT AIR SYSTEM
C2.01.08.14 Erection/Installation of CHEMICAL INJECTION PACKAGE
C2.01.08.15 Erection/Installation of EOT CRANES
C2.01.08.16 Erection/Installation of FIRE WATER PUMP
C2.01.08.17 Erection/Installation of FIRE WATER JOCKEY PUMP
C2.01.08.18 Erection/Installation of OILY WATER PUMP
C2.01.08.19 Erection/Installation of SKIMMED OIL RECYCLE PUMP
C2.01.08.20 Erection/Installation of EFFELUENT FEED PUMP
C2.01.08.21 Erection/Installation of TREATED WATER DISPOSAL PUMP
C2.02 Piping/Pipeline
C2.02.01 Erection/Installation of Process Gas Piping
C2.02.02 Erection/Installation of Fuel Gas Piping
C2.02.03 Erection/Installation of Flare Piping
C2.02.04 Erection/Installation of Drain Piping
C2.02.05 Erection/Installation of Fire Water Piping
C2.02.06 Erection/Installation of Service Water Piping
C2.02.07 Erection/Installation of Portable Water Piping
C2.02.08 Erection/Installation of Instrument Air Piping
C2.02.09 Erection/Installation of Utility Air Piping
C2.02.10 Painting of Process Gas Piping
C2.02.11 Painting of Fuel Gas Piping
C2.02.12 Painting of Flare Piping
C2.02.13 Painting of Drain Piping
C2.02.14 Painting of Fire Water Piping
C2.02.15 Painting of Service Water Piping
C2.02.16 Painting of Portable Water Piping
C2.02.17 Painting of Instrument Air Piping
C2.02.18 Painting of Utility Air Piping
C2.03 Instrumentation
C2.03.01 Installation of CHOKE VALVE
C2.03.02 Installation of GWR LT/ NON CONTACT RADAR
C2.03.03 Installation of ON/OFF VALVE/SHUTDOWN VALVE/EMERGENCY VALVE
C2.03.04 Installation of TRANSMITTER(PRESSURE,TEMP,FLOW,LEVEL,DP TYPE)
C2.03.05 Installation of CONTROL VALVE(PRESSURE,FLOW,LEVEL)
C2.03.06 Installation of PRESSURE SAFETY VALVE
C2.03.07 Installation of ROTAMETER
C2.03.08 Installation of SENIOR ORIFICE FLOW METER
C2.03.09 Installation of GAUGES(PRESSURE / TEMPERATURE/LEVEL/FLOAT)
C2.03.10 Installation of CLEAN AGENT SYSTEM
C2.03.11 Installation of MPFM
C2.03.12 Installation of CORIOLIS FLOW TRANSMITTER
C2.03.13 Installation of MAGNETIC FLOW TRANSMITTER
C2.03.14 Installation of SAND PROBE
C2.03.15 Installation of CONTROL ROOM

C3 Systems hydro test and pre-commissioning as certified by EPMC/OIL on pro-rata basis as per the approved schedule of activities. Organizing training for OIL's personnel for Operation and Maintenance of the plant

C3.01 System Hydro Test


C3.02 Pre Commissioning of Mechanical & Piping system
C3.02.01 Pre Commissioning of PRODUCTION SEPARATORS
C3.02.02 Pre Commissioning of HP SEPARATOR
C3.02.03 Pre Commissioning of FUEL GAS CONDITIONING UNIT
C3.02.04 Pre Commissioning of LP FLARE KOD
C3.02.05 Pre Commissioning of HP FLARE KOD
C3.02.06 Pre Commissioning of GROUND FLARE PACKAGE
C3.02.07 Pre Commissioning of WATER BATH HEATER
C3.02.08 Pre Commissioning of CLOSED BLOW DOWN SYSTEM
C3.02.09 Pre Commissioning of WATER TREATMENT SYSTEM
C3.02.10 Pre Commissioning of INSTRUMENT AIR SYSTEM
C3.02.11 Pre Commissioning of CHEMICAL INJECTION PACKAGE
C3.03 Organizing training for OIL's personnel for Operation and Maintenance of the plant
C4 Successful Commissioning of Baghjan FGGS.
D WBS -PGTR
D1 PGTR- as certified by EPMC/ OIL on pro-rata basis as per the approved weighted Billing schedule.
D2 PGTR-Successful Trail run of the Baghjan FGGS.
DAILY PROGRESS REPORT
(Daily Highlights / Events / Incidents register)

HAL Offshore Limited JPEC Oil India Limited


LSTK Contractor OIL Project Management Consultant Owner
Date: 04.02.2023

Project Name: Balance of Plant (BOP) Mechanical,Piping & Field instrumentation works Package-03 for Field Gas Gathering Station, Baghjan,Assam

WO Reference GEMC-511687726216255
Owner M/s OIL India Ltd.
Consultant JAYATHE PETROTECH ENGINEERS & CONSULTANTS
Contractor HAL Offshore Limited

Date EVENTS/INCIDENTS RELATED TO WORK, ACCIDENTS, SECURITY, DISCIPLINE, ATTRITION, BANDH ETC.
DAILY PROGRESS REPORT
(Site Progress Photos)

HAL Offshore Limited JPEC


LSTK Contractor EPMC

Project Name:Balance of Plant (BOP) Mechanical,Piping & Field instrumentation works Package-03 for Field Gas Gathering Station, Baghjan,Assam
WO Reference GEMC-511687726216255
Owner M/s OIL india Ltd.
Consultant JAYATHE PETROTECH ENGINEERS & CONSULTANTS
Contractor HAL Offshore Limited
MANPOWER DETAILS at FGGS Baghjan site

No of
SL NO Designation No of personnel Engaged personnel
Present

1 SR QA/QC ENGINEER-Mech 1 1
2 QA/QC ENGINEER-Mech 1 1
3 HSE supervisor 1 1
4 Supervisor 1 1
5 Fabricator 1 1
6 Welder 3 3
7 Grinder 3 3
8 Gas cutter 2 2
9 Electrician 1 1
10 Rigger 14 14
11 Hydra Operator 1 1
12 Jack Operator 1 1
13 Store Incharge 1 1
14 Store assistant 1 1
15 Office assistant 1 1
16 Security 5 5
17 Driver 1 1
MANPOWER DETAILS at Jorhat Fabrication Yard
1 QA/QC ENGINEER-Mech 1 1
2 Fabricator 1 1
3 Welder 1 1
4 Grinder 1 1
5 Gas cutter 1 1
6 Electrician 1 1
7 Store keeper 1 1
8 Rigger 5 5
9 Hydra Operator 1 1

Total 52 52
Date: 04.02.2023
Weather Condition: clear
ng Station, Baghjan,Assam

ite

Remarks

on Yard
DAILY PROGRESS REPORT
(Site Progress Photos)

HAL Offshore Limited JPEC Oil India Limited


LSTK Contractor EPMC Owner

Project Name:Balance of Plant (BOP) Mechanical,Piping & Field instrumentation works Package-03 for Field Gas Gathering Station, Baghjan,Assam
WO Reference GEMC-511687726216255
Owner M/s OIL india Ltd.
Consultant JAYATHE PETROTECH ENGINEERS & CONSULTANTS
Contractor HAL Offshore Limited
Photos:
Oil India Limited
Owner
Date: 04.02.2023
Weather Condition: clear
r Field Gas Gathering Station, Baghjan,Assam