You are on page 1of 3

Project Greenfield PVC Additives

DYE PENETRANT TEST Location


Client
Dewas MP
BIAPL
REPORT Date
Format No EFE/SITE/QC/22/00
LINE NO.: RC 09 ( L01 - L 06) Inspection Stage : Root Weld/ Fillet Weld
Location : Production plant - Northside wall
ITEM MAKE BATCH NO EXPIRY DATE Report No : 01
Cleaner CHECKMATE INDIA 302 2023 Penetration Time:06 min
Penetrant CHECKMATE INDIA 302 2023 Developing time:08 min
Developer CHECKMATE INDIA 297 2023 Material :MS ERW PIPE
Accepted Standard:
JOINT.
Sl NO. Location Line No. NO. PIPE SIZE WELDER NO. Welding Run OBSERVATION Remark

1 Production plant - North side Wall L 02 J 04 200 NB W 02 Root weld OK


2 Production plant - North side Wall L 03 J 04 200 NB W 02 Root weld OK
3 Production plant - North side Wall L 04 J 04 200 NB W 02 Root weld Found defect due to improper cleaning Extinct corrected the same
4 Production plant - North side Wall L 05 J 04 200 NB W 02 Root weld OK
5 Production plant - North side Wall L 01 J 06 200 NB W 03 Root weld OK
6 Production plant - North side Wall L 02 J 06 200 NB W 03 Root weld OK
7 Production plant - North side Wall L 02 J 02 200 NB W 03 Final weld OK
8 Production plant - North side Wall L 04 J 02 200 NB W 03 Final weld OK
9 Production plant - North side Wall L 05 J 02 200 NB W 03 Final weld OK
10 Production plant - North side Wall L 06 J 02 200 NB W 03 Final weld OK

Checked by Witnessed/Reviewed/Approved by Approved By


EXTINCT FIRE ENGINEERS MOTT Macdonald BIAPL
Sign.

Name : Mr. Mandar Khanvilkar Mr. Brajesh Kumar Prasad Mr. Kamlesh Sagitra
Date
Project Greenfield PVC Additives
DYE PENETRANT TEST Location
Client
Dewas MP
BIAPL
REPORT Date
Format No EFE/SITE/QC/22/00
LINE NO.: RC 08 ( L01 - L 02) Inspection Stage : Root Weld/ Fillet Weld
Location : Production plant - Northside wall
ITEM MAKE BATCH NO EXPIRY DATE Report No : 02
Cleaner ORION R/002/2021 2023 Penetration Time:06 min
Penetrant ORION P/004/2021 2023 Developing time:08 min
Developer ORION D/10/2021 2023 Material :MS ERW PIPE
Accepted Standard:
Sl NO. Location Line No. JOINT. PIPE SIZE WELDER NO. Welding Run OBSERVATION EFEPL MM Remark
NO.

1 Production plant - North side Wall L01 J05 150 NB W03 Final weld OK
2 Production plant - North side Wall L02 J03 150 NB W03 Final weld OK

Checked by Witnessed/Reviewed/Approved by Approved By


EXTINCT FIRE ENGINEERS MOTT Macdonald BIAPL
Sign.

Name : Mr. MOHMMAD SAMAN Mr. Brajesh Kumar Prasad Mr. Kamlesh Sagitra
Date
Project Greenfield PVC Additives
DYE PENETRANT TEST Location
Client
Dewas MP
BIAPL
REPORT Date
Format No EFE/SITE/QC/22/00
LINE NO.: RC 09 ( L01 - L 06) Inspection Stage : Root Weld/ Fillet Weld
Location : Production plant - Northside wall
ITEM MAKE BATCH NO EXPIRY DATE Report No : 02
Cleaner ORION R/002/2021 2023 Penetration Time:06 min
Penetrant ORION P/004/2021 2023 Developing time:08 min
Developer ORION D/10/2021 2023 Material :MS ERW PIPE
Accepted Standard:
JOINT.
Sl NO. Location Line No. NO. PIPE SIZE WELDER NO. Welding Run OBSERVATION Date Remark

1 250 NB W02 Final weld OK 24.03.2022


2 200 NB W03 Root weld OK 25.03.2022
3 250 NB W02 Root weld OK 25.03.2022
4 RC08 L01 J05 150 NB W03 Final weld OK 26.03.2022
5 RC08 L02 J03 150 NB W03 Final weld OK 26.03.2022
6 RC25 L01 J03 100 W02 Root weld ok 26.03.2022
7 RC26 L01 J03 100 W02 Root weld ok 26.03.2022
8
9
10

Checked by Witnessed/Reviewed/Approved by Approved By


EXTINCT FIRE ENGINEERS MOTT Macdonald BIAPL
Sign.

Name : Mr. MOHMMAD SAMAN Mr. Brajesh Kumar Prasad Mr. Kamlesh Sagitra
Date

You might also like