REQUEST FOR MATERIAL APPROVAL [ RFMA ]

BML Ref No: SBW-RFMA-005.R1

Project: Proposed South Beach Weligama Condominium Development Project

Client: South Beach Weligama Propoerties (Pvt) Ltd

Sample Submitted by BML Date: 30th March 2022

Name & Address Sample Item Waterproofing


25& 25B , Jesmin Gardens,
Nawala, Rajagiriya.
Salik Engineering (Pvt)
Supplier
Ltd

Submission of Supplier's
Specifications and Method Telephone No
Contents 077 763 5165
Statements for
Waterproofing
Sample Detail

01. Brand SikaBit T-1150 PG SA for Raft Slab and Pool

Fleximent 201 for Water Sump, Toilets and balconies

Sikaflex for Expansion Joint

02. Country of Origin Sikabit T-1150 PG SA - Saudi Arabia Proposed Condominium Development
for South Beach Weligama Properties
(Pvt) Ltd
Fleximent 201 - Singapore Engineer's Office - Global Project
Management Consultants (Pvt) Ltd.
Sikaflex - China (GPMC)

No Exception Taken

Revise & Submit


03. Dimension As per attached Specifications.
Approved With Comments

Reject

04. Specifications As per attached Specifications. Submit Specified Item

Signed By :
05. Standards As per attached Specifications. Date :

Consultant's
Please refer to the attached structural consultant's comments.
Comments
Client Representative's Approval Consultant's Approval

Navesta Consultant's
Representative's Representative's
Name: Name:

Signature: Signature:

Date & Time: Date & Time:

Acknowledged by :

Name:………………………......………… Signature : ……………..…………


Date : ………………..……….
CIVIL & STRUCTURAL ENGINEERING CONSULTANTS
DOCUMENT REVIEW REPORT (DRR)
(PRIVATE) LIMITED
No. 01, 33rd Lane, Bagatalle Rd., Colombo 03 DRR No. : 11
Tel : 94- 11 – 2501727
Fax : 94- 71 – 8802859
Email contact@csec.lk Date : 18/04/2022

Project : Proposed Condominium Development for South Beach Weligama Properties (Pvt) Ltd
Employer : South Beach Weligama Properties (Pvt) Ltd
Engineer : Global Project Management Consultants (Pvt) Ltd
Contractor : Buildmart Lanka (Pvt) Ltd.
To : Mr. Mihiru Perera (Contractor’s Representative) – Buildmart Lanka (Pvt) Ltd.

Contractor's Doc Ref. No. Rev Description Status * Expected Re-issue Date

Request for Material Approval for Waterproofing


SBW-RFMA-005.R1 0 B -
and Waterproofing Method Statement

Comments
• Sikabit T-1150 PG SA can be accepted as the waterproofing membrane for Roof slab and Basement slab.

• Fleximent 201 can be accepted as the waterproofing membrane for Bathrooms, Swimming Pool, Water Tanks and Lift Pit

• Sikaflex cannot be accepted as the joint sealant. The service temperature of the sealent shall be greater than 80oC and it

shall be UV stable.

• Certifications shall be provided by both installer and waterproof membrane manufacturer that the waterproofing systems

together with details and fitments are fit for purpose for the waterproofing works shown on drawings.

• Shop drawings shall be submitted, fully detailing the work and installations including details at Margins, Flashings,

Movement Joints, Outlets and Penetrations.

• Samples of each waterproofing material shall be provided for approval.

• A sample installation shall be carried out at a location chosen by the engineer and it shall be 10m 2 minimum completed with

jointing, sealing, flashing and ancillary work to demonstrate finished work.

• All work shall be carried out in a manner, which ensures that warranties of the installers are not restricted or voided.

• In the event of leak, water proofing company should be liable for the removal or reinstallation and related cost there of

screeds or any other layer that may have been laid over the water proofing.

Notes

From: Reviewed By:


Eng. Shiromal Fernando
Civil & Structural Engineering Consultants (Pvt) Ltd
772/A, Wijesinghe Mawatha, Madinnagoda, Rajagiriya
Tel: +94 11 268 3979
………………………………………..

* Status
A – Approved B – Approved with Comments C – Not Approved - Resubmit D – Rejected
CIVIL & STRUCTURAL ENGINEERING CONSULTANTS
DOCUMENT REVIEW REPORT (DRR)
(PRIVATE) LIMITED
No. 01, 33rd Lane, Bagatalle Rd., Colombo 03 DRR No. : 11
Tel : 94- 11 – 2501727
Fax : 94- 71 – 8802859
Email contact@csec.lk Date : 18/04/2022

Acknowledgement Receipt

Name :
Signature :
Date :

* Status
A – Approved B – Approved with Comments C – Not Approved - Resubmit D – Rejected
SikaBit T-1150 PG SA
PRODUCT DATA SHEET
SikaBit® T-1150 PG SA
4 MM TORCH-ON, SHEET WATERPROOFING AND ROOFING MEMBRANE BASED ON ATACTIC
POLY PROPYLENE (APP) MODIFIED, REINFORCED BITUMEN 150 G/M2, WITH POLYETHYLENE
FILM ON BOTH SIDES

DESCRIPTION CHARACTERISTICS / ADVANTAGES


SikaBit® T-1150 PG SA is a standard torch-on sheet wa- ▪ Resistant to ageing
terproofing membrane. It is based on APP (Atactic ▪ Resistant to weathering
Poly-Propylene) modified bitumen, reinforced with a ▪ Good tensile strength and elongation
150 g/m2 polyester non-woven fabric and, faced with ▪ High resistance to water vapour
a polyethylene film on both the top surface and the re- ▪ Good dimensional stability
verse to ease installation works. ▪ Flexible at low temperatures
Suitable for use in hot and tropical climatic conditions. ▪ Easy to install using the torch-on method
▪ Suitable as top layer for multilayer installations
USES ▪ Good resistance to mechanical impact

SikaBit® T-1150 PG SA may only be used by experi-


enced professionals.
It is used a waterproofing membrane for protection of
e d for and
various substrates in a wide range of applications.
p r o v l a b
▪ Waterproofing and damp-proofing of the exterior
t e r i al ap ng roof s
walls of basements against percolating water and
Ma proofi
damp soil r b
▪ Waterproofing of retaining walls wate ent sla
m
▪ Wet areas
▪ Waterproofing on flat roofs under protective layers base
or ballast
▪ Waterproofing on balconies, terraces and wetrooms
under tiles

PRODUCT INFORMATION
Composition Atactic Polypropylene Modified Bitumen
Packaging Roll size: 1.00 m (roll width) x 10.00 m (roll length). 23 rolls per pallet.
Appearance / Colour Rolled sheet membrane, reinforced with polyester non-woven fabric with
Polyethylene film on both sides for ease of installation
Colour: Black
Shelf life 2 years minimum from date of production if stored properly in original un-
opened packaging.
Storage conditions Rolls must be stored in their original package, in vertical position and un-
der cool and dry conditions between temperatures of +5 °C and +35 °C.
They must be protected from direct sunlight, rain, snow and ice.

PRODUCT DATA SHEET


SikaBit® T-1150 PG SA
April 2019, Version 03.01
020704410010000101

1/3
Length 10 m ± 1 %
Width 1.0 m ± 1 %
Effective Thickness 4 mm ± 0.2 mm (ASTM D5147)

Mass per unit area 4.5 kg/m2 ± 10 % (EN 1849-1)

TECHNICAL INFORMATION
Resistance to Impact > 300 mm (EN 12691)

Tensile Strength Longitudinal ~600 N/50 mm (ASTM D5147)


Transversal ~450 N/50 mm

Elongation Longitudinal ~40 % (ASTM D5147)


Transversal ~40 %

Tear Strength Longitudinal ≥500 N (ASTM D5147)


Transversal ≥350 N

Joint Shear Resistance Longitudinal ~600 N/50 mm (EN 12317-1)


Transversal ~450 N/50 mm

Foldability at Low Temperature 0 °C (EN 1109)

Watertightness Method A ≥60 kPa (EN 1928-1)


Method B ≥400 kPa

Service Temperature 0 °C min. / +35 °C max.

APPLICATION INFORMATION
Ambient Air Temperature +5 °C min. / +50 °C max.
Substrate Temperature +5 °C min. / +65 °C max.

APPLICATION INSTRUCTIONS must be finished with a roller.


For detailed information regarding application please
SUBSTRATE QUALITY refer to Method Statement.

Concrete / brickwork / mortar screeds: IMPORTANT CONSIDERATIONS


Must be installed on suitably primed, smooth, clean,
dry, homogeneous and free from oils and grease, dust Not resistant to root penetration.
and loose or friable particles. Horizontal surfaces must Ambient Maximum Temperature of Liquids + 35 °C.
be sloped > 1.5 Avoid damage to previously installed membranes dur-
ing the torch-on of further layers of sheet membrane.
APPLICATION METHOD / TOOLS The water tightness of the structure must be tested
and approved after completion of the membrane in-
The cold applied bituminous primer SikaBit® P-11 SA or stallation works according to the requirements of the
SikaBit® P-12 AE shall be applied onto the substrate client’s specifications.
(refer to product data sheet) before the first mem- Flood testing maximum 48 hours at 50 mm depth.
brane layer as follows:
The membrane is fully to the substrate by the torch-on
method using a gas torch. Unroll and position the BASIS OF PRODUCT DATA
membrane roll. Roll out half a roll length, heating the All technical data stated in this Data Sheet are based
underside of the membrane with the gas flame until on laboratory tests. Actual measured data may vary
the polyethylene film and bitumen mass melts. Unroll due to circumstances beyond our control.
the membrane steadily and continuously. A bead of li-
quid bitumen must be visible on the underside of the
roll. The torch on membrane must be firmly pressed LOCAL RESTRICTIONS
onto the substrate in order to avoid air entrapment us- Note that as a result of specific local regulations the
ing a special roller or heavy brush. Repeat this proced- declared data and recommended uses for this product
ure with the second half of the roll. All membranes may vary from country to country. Consult the local
must be overlapped by a minimum 100 mm the seams Product Data Sheet for the exact product data and

PRODUCT DATA SHEET


SikaBit® T-1150 PG SA
April 2019, Version 03.01
020704410010000101

2/3
uses. ECOLOGY, HEALTH AND SAFETY
For information and advice on the safe handling, stor-
age and disposal of chemical products, users shall refer
to the most recent Safety Data Sheet (SDS) containing
physical, ecological, toxicological and other safety-re-
lated data.

LEGAL NOTES
The information, and, in particular, the recommenda-
tions relating to the application and end-use of Sika
products, are given in good faith based on Sika's cur-
rent knowledge and experience of the products when
properly stored, handled and applied under normal
conditions in accordance with Sika's recommenda-
tions. In practice, the differences in materials, sub-
strates and actual site conditions are such that no war-
ranty in respect of merchantability or of fitness for a
particular purpose, nor any liability arising out of any
legal relationship whatsoever, can be inferred either
from this information, or from any written recom-
mendations, or from any other advice offered. The
user of the product must test the product’s suitability
for the intended application and purpose. Sika re-
serves the right to change the properties of its
products. The proprietary rights of third parties must
be observed. All orders are accepted subject to our
current terms of sale and delivery. Users must always
refer to the most recent issue of the local Product Data
Sheet for the product concerned, copies of which will
be supplied on request.

Sika Lanka (Private) Limited


No. 58/12-B
Raja Mawatha
Ekala, Ja-Ela
Sri Lanka

SikaBitT-1150PGSA-en-LK-(04-2019)-3-1.pdf

PRODUCT DATA SHEET


SikaBit® T-1150 PG SA
April 2019, Version 03.01
020704410010000101

3/3
Fleximent 201
®
Fleximent 201 Flexible Cementitious
Waterproofing Coating

032 - 019
Fleximent® 201 is a two-component, flexible cementitious Environmentally
Friendly Coating
waterproofing coating comprising of a proprietary synthetic
resin dispersion and a blend of selected cement mixed with
fillers. Once cured, the membrane allows entrapped water
vapour to escape but yet remain impermeable to water.

Fleximent® 201 is flexible, adheres to most surfaces and


fills hairline cracks. It has excellent resistance to wear,
weather, abrasion, aggressive soils and contaminated
ground water. Fleximent® 201 acts as an effective
waterproofing coating for floors, walls, water retaining
structures and planter boxes. It may be applied onto
surfaces in contact with potable water.

Fleximent® 201 may be applied to damp surfaces. It


contains no chlorine and salts that cause corrosion and
efflorescence and is resistant to frost and thawing salts.

Fleximent® 201 meets the requirements of British


Standard BS 6920:90 and Singapore Standard SS 375:94.

Protect freshly applied surfaces from strong sunlight and


Installation Procedures drying wind with a polyethylene sheet. Fleximent ® 201
once cured, should be covered by a protective screed as
Surfaces should be clean, free from honeycombs, voids, soon as possible. Care should be exercised to prevent
dirt, loose material, paint, oil, curing agents or other damage to the waterproofing during subsequent
contaminants. construction work prior to laying of the protection screed.

Prior to application, dampen the substrate with a brush or Fleximent® 201 should be applied in 2 coats at a coverage
roller. of 1.0 kg – 1.1 kg per sq.m. per coat for a final dry film
a. Pour Part A (liquid) into a clean container. thickness of approximately 1.2 mm.
b. Pour Part B (powder) slowly into Part A.
c. Mix with a low speed drill fitted with a purpose-made
paddle, ensuring the mix is homogeneous and
lump-free.

Fleximent® 201 may be applied by squeegee, roller or


brush to horizontal and vertical surfaces. Ensure that air is
not entrapped in the membrane. For joints and corners,
apply the slurry with a brush ensuring that areas are
worked and covered well. Allow curing to take place
completely before applying the second coat.
Specifications
Mix density 1300 kg/m3
protective screed

Mixed colour Grey cement sand render

Pot life @ 35ºC approx. 1 hour Fleximent 201

protective/bedding screed
Drying time 1 – 3 hours

Water penetration test 0, no water penetration (DIN 1048)

Crack bridging 2 mm (ASTM C836)

Hardness Shore A >50 (ASTM D2240)


Wet Area
Adhesion to substrate >1.0 N/mm2

Water vapour transmission <21 g/m2.d (ASTM E96-93)


Fleximent 201
Tensile strength >1.6 N/mm2 (ASTM D412)
protective/bedding screed
Elongation at break >150 % (ASTM D412)
discharge pipe

Health and Safety

Do not allow Fleximent® 201 to be contaminated by other


materials. Gloves and goggles should be worn. Any splashes to non-shrink grout

the skin or eye should be washed off with clean water. Store in Drain Outlet
cool and dry place.

e d for s,
Fleximent 201

p r o v o o m
al ap ng bathr r tank
cement sand render

t e r i
Ma proofi
e r o l , wate protective/bedding screed

wat ming p o
swim ft pit
li
and

Water-Retaining Structure

Note: The information provided in this brochure is based on current knowledge


and experience and does not infer any legally binding assurance or warranty,
expressed or implied. Intending purchasers should verify whether any changes to
specifications or applications or otherwise have been made since this literature
was issued.

Singapore
Sikaflex
Product Data Sheet
Edition 2 (12/2014)
Identification no:
®
Sikaflex Construction

Sikaflex® Construction
1-C polyurethane sealant for building joints

®
Product Sikaflex Construction is an one component, moisture curing, elastic joint sealant
based on polyurethane. It is suitable for outdoor applications
Construction

Description/Uses
Characteristics /  One component, ready to use
Advantages  Very good adhesion to many substrates
 Excellent workability, easy to smooth
 Non sag
 Bubble free curing
 Can be overpainted
 High tear resistance
 Good weather and ageing resistance
Conforms to ISO 11600 Classification F 25 HM /20 LM
Approval / Standard
Conforms to ASTM C 920 Type S, Grade NS, Class 25, Use NT, G, M and A

Technical Data

Colours White, Concrete Grey, Black, Dark Amber, Beige, further colours available upon
request

Packaging 600ml sausages, 20 sausages per box


Storage Conditions / 12 months from date of production if stored in undamaged original sealed
Shelf-Life containers, in dry conditions and protected from direct sunlight at temperatures
between +5°C and +25°C.

Chemical Base 1-component polyurethane, moisture curing.


2) 1)
Density 1.30 kg/l approx. (CQP 006-4, ISO 1183-1)
Sag Flow 0 mm (CQP 061-4, ISO 7390)

pro ved
al n ot ap
ri
Mate

Sikaflex® Construction
2)
Skin Time 60 minutes approx. (CQP 019-1)
2)
Curing Rate 3 mm/24 h approx. (CQP 049-2)
Movement Capability 25% (ISO 9047)
2 2)
Tensile Strength 1.2 N/mm approx. (CQP 036-1, ISO 37)
2)
Tear Propagation 7.0 N/mm approx. (CQP 045-1, ISO 34)
Resistance
2)
Shore A Hardness 35 after 28 days approx. (CQP 023-1, ISO 868)
2 2)
E-Modulus 0.6 N/mm aprox.at 100% elongation after 28 days (CQP 555-1, ISO 8339)
2)
Elongation at Break 800% approx. (CQP 036-1, ISO 37)
2)
Construction

Elastic Recovery > 80% after 28 days (ISO 7389)


Application Temperature +5°C to +40°C
Service Temperature -40°C to +70°C
Service temperature shall be
Application Details greater than 80 degrees celcius
Joint Design/ The joint width must be designed to suit the movement capability of the sealant. In
Consumption general the joint width must be > 10 mm and < 40 mm. A width to depth ratio of
~ 2 : 1 must be maintained.
Standard design dimensions for concrete elements as per DIN 18 540 /table 3:
Joint distance [m] 2 2 - 3.5 3.5 - 5 5 - 6.5 6.5 - 8

Design joint width [mm] 15 20 25 30 35

Min. joint width [mm] 10 15 20 25 30

Joint depth [mm] 8 10 12 15 15

All joints must be properly designed and dimensioned by the specifier and the main
contractor in accordance with the relevant standards, because changes are not
usually feasible after Construction. The basis for calculation of the necessary joint
width are the technical values of the joint sealant and the adjacent building
materials as well as the exposure of the building, its method of Construction and its
dimensions.
Approximate consumption
Joint width [mm] 10 15 20 25 30

Joint depth [mm] 8 8 10 12 15

Joint length / 600 ml [m] ~ 7.5 ~ 4.5 ~ 2.5 ~ 1.6 ~ 1.3

Backing: Use only closed cell, polyethylene foam backing rods.


Substrate Preparation / Surface must be clean, dry, homogeneous and free from oil, grease, dust and
Priming loose or friable particles. Cement laitance must be removed.
Non porous substrates:
E.g. metals, powder coatings etc. have to be cleaned with a fine abrasive pad and
® ®
Sika Aktivator-205 (Sika Cleaner-205) by using a clean towel / cloth.
®
After a flash off time of at least 15 min, apply Sika Primer-3 N by using a brush.
Before sealing allow a flash off time of at least 30 min. (max. 8 hrs.).
®
For PVC use Sika Primer-215.
Before sealing allow a flash off time of at least 30 min. (max. 8 hrs.).
Porous substrates:
E. g concrete, aerated concrete and cementitious renders, mortars, brick, etc. have
®
to be primed with Sika Primer-3 N by using a brush.
Before sealing allow a flash off time of at least 30 min. (max. 8 hrs.).
Important note: Primers are only adhesion promoters. They neither substitute for
the correct cleaning of the surface nor improve their strength significantly.
Primers improve long term performance of a sealed joint.
®
For further information refer to the Sika Primer table.

Sikaflex® Construction
®
Sikaflex Construction is supplied ready to use.
Application Method / After suitable joint and substrate preparation, insert backing rod to required depth
Tools and apply primer if necessary. Insert cartridge into sealant gun and firmly extrude
®
Sikaflex Construction into joint making sure that it is full contact with the side of the
®
joint. Fill the joint, avoiding air entrapment. Sikaflex Construction must be tooled
firmly against joint sides to ensure good adhesion.
Masking tape must be used where sharp exact joint lines or exceptionally neat lines
are required. Remove the tape whilst the sealant is still soft. Sleek joint with
smoothing liquid for a perfect sealant surface.
®
Cleaning of Tools Clean all tools and application equipment with Sika Remover-208 /
®
Sika TopClean-T immediately after use. Hardened / cured material can only be
mechanically removed.
Further Documents  Material Safety Data Sheet(MSDS)
Construction

available
 Pre-treatment Chart Sealing & Bonding
 Method Statement Joint Sealing
 Method Statement Joint Maintenance, Cleaing and Renovation
 Technical Manual Facade sealing
Notes on Application / Compatible coatings may cover the joint sides to max. 1 mm.
Limitations The compatibility must be tested according to DIN 52 452-2.
Colour deviations may occur due to exposure to chemicals, high temperatures, UV-
radiation (especially with colour shade white). However a change in colour will not
adversely influence the technical performance or the durability of the product.
Before using on natural stone contact our Technical Service.
®
Do not use Sikaflex Construction as a glass sealer, on bituminous substrates,
natural rubber, EPDM rubber or on building materials which might bleed oils,
plastisicers or solvents which could attack the sealant.
®
Do not use Sikaflex Construction to seal swimming pools.
Not suitable for joints with water pressure or permanent water immersion.
The freshly applied sealant has a smell similar to 'Amaretto' until it has fully cured
(benzalehyde).
®
Do not mix with or expose uncured Sikaflex Construction to substances that
may react with isocyanates, especially alcohols which are often components
within e.g. thinners, solvents, cleaning agents and formwork releasing
compounds. Such contact could interfere or prevent the cross linking curing
reaction of the material.

Sikaflex® Construction
Value Base All technical data stated in this Product Data Sheet are based on laboratory tests.
Actual measured data may vary due to circumstances beyond our control.
Health and Safety For information and advice on the safe handling, storage and disposal of chemical
Information products, users shall refer to the most recent Material Safety Data Sheet containing
physical, ecological, toxicological and other safety-related data.
Legal Notes The information, and, in particular, the recommendations relating to the application
and end-use of Sika products, are given in good faith based on Sika's current
knowledge and experience of the products when properly stored, handled and
applied under normal conditions in accordance with Sika’s recommendations. In
practice, the differences in materials, substrates and actual site conditions are such
that no warranty in respect of merchantability or of fitness for a particular purpose,
nor any liability arising out of any legal relationship whatsoever, can be inferred
either from this information, or from any written recommendations, or from any other
advice offered. The user of the product must test the product’s suitability for the
intended application and purpose. Sika reserves the right to change the properties
Construction

of its products. The proprietary rights of third parties must be observed. All orders
are accepted subject to our current terms of sale and delivery. Users must always
refer to the most recent issue of the local Product Data Sheet for the product
concerned, copies of which will be supplied on request.

Sika (China) Ltd.


No.28 Jingdong Road, Suzhou Industrial Park,
JiangSu,P.R.China
Postal Code: 215121
ISO9001: 2008 ISO14001: 2004
Tel: (86) 512 6273 2888 Certificate No: CC3576 Certificate No: CC3577
Fax: (86) 512 6287 7030
chn.sika.com

Sikaflex® Construction
Method Statements
22nd March 2022

METHOD STATEMENT

PROJECT : PROPOSED SOUTH BEACH WELIGAMA CONDOMINIUM PROJECT

SUBJECT : WATERPROOFING OF BASEMENT WALL AND FLOOR

THE PRODUCT : Topseal / Sikabit 1150 – AAP modified bituminous torch welded sheet
Membrane
Polyprim SB- Solvent base bituminous emulsion

The floor screed concrete is laid with necessary slope to the de watering outlets.
The concrete screed shall be laid over well compacted
1. Then construct the block wall around the perimeter, height up to base thickness (it will
act as a form work for base thickness )

2. If any mortar, debris and foreign matter are present on this screed, they are to be
removed.

3. A cement sand fillet minimum of 25mm X 25 mm to be laid at the intersection point of


any vertical and horizontal section such as the wall – slab edge, etc. Detailed sketch shall be
provided
4. Polyprime SB primer is now brush applied on the surface (floor and vertical block wall)
to act and the key coat for the torch membrane.

5. Topseal 4mm torch membrane in now torch laid over the prime surface (floor and
vertical block wall)
The application of waterproofing membrane shall strictly be done as recommended by the manufacturer
6. Each sheet is lapped to the next sheet – both at side laps and end laps. Minimum laps to
be 100 mm.
minimum lap length of 100mm shall be maintained at all times
7. The torch membrane laying on the horizontal is continued on the vertical sections and
terminated temporary on the vertical walls as per the height of block wall (leave the
minimum of 150mm lap length to joint with next step).

8. A protection screed laid over the horizontal waterproofing and protection plaster to be
laid over the vertical walls waterproofing.

9. Structural concrete is now laid (base and walls) and allow it to cure.

10. Then continue construction of structural vertical wall. A groove is formed in the vertical
walls at termination point 30x20mm.

11. Polyprime SB primer is now brush applied on the surface (vertical wall) to act and the
key coat for the torch membrane.
12. The torch membrane laying continued on the vertical walls and terminating by tucking
in to the groove.

13. The groove sealing with mastic sealant

14. A protection plaster to be laid over the vertical walls waterproofing.

1. Concrete grade 15 shall be laid with a thickness of 75mm and the screed shall be kept damp for at least 5 days.
2. The block wall and laid screed shall be cleaned and free from damp, laitance, dust and dirt prior to application of
primer.
3. At interruption of work the edges of the sheets have to be finished in such a manner that rain water or duct shall
not penetrate underneath.
4. The waterproofing membrane shall be laid 6m beyond vertical construction joints of basement walls and shall be
laid 3m beyond horizontal construction joints of basement wall.
22nd March 2022

METHOD STATEMENT

PROJECT : PROPOSED SOUTH BEACH WELIGAMA CONDOMINIUM PROJECT

SUBJECT : WATERPROOFING OF BATHROOMS

THE PRODUCT:

Fleximent 201 is a two component cementitious flexible membrane. The product consists of
powder and liquid. The product is a brush application.

THE APPLICATION:
All plumbing must be completed and pressure tested (if necessary) prior to commencement of
the waterproofing. All voids created for installation of pipes, fitting etc must be filled and
1 completed

The cement mortars debris on the surface must be removed by main contractor. The surface is
then inspected to ascertain if there is foreign objects/honey combing in the surface. These areas
will be hacked and patched prior to waterproofing application by the main contractor.

For vertical brick/ block work, it must be plastered semi rough thin plaster, to a height of
300mm-1000mm from the finished floor level and 2100 mm high of shower area .Lay the fillet
minimum of 25mm X 25mm of cement sand is placed at the intersection of the vertical and the
2 horizontal.

The surface is then thoroughly cleaned. Once the surface preparation is completed, the surface
is wetted prior to application of the waterproofing. This is to promote capillary action of
product into substrate.

The two components that constitute the Fleximent 201 product are mixed to ensure proper
dispersion of the components. The first coat applied on the concrete substrate. On completion
of the first coat, allow for cure 4-3 hours then will undertake the second coat application over
the first coat. Edger’s will reinforce with polyester mat and will apply 3rd coat over the 2nd
coat at edger’s.

In areas where pipes/penetrations exists, the membrane will be extended either along the
surface of the pipe, if the pipe protrudes from the concrete surface or into the pipe if the pipe
is flushed with the concrete surface.

Allow product to cure minimum of 24 hours. The structure is then pond tested.( Minimum of
24 hr)

On pond test if there are no any defects is found. Then water will be removed and lay the
protection screed or tile bed.
1. Any uneven areas, defected areas and chiseled patches to be treated with an approved
epoxy resin based un-pigmented primer and to be leveled with a homogeneously mixed
approved 2-component epoxy mortar.
2. The detail at intersections shall be provided with sketches.
22nd March 2022

METHOD STATEMENT

PROJECT : PROPOSED CONDOMINIUM PROJECT AT WALIGAMA

SUBJECT : WATERPROOFING OF ROOF SLAB WALL AND FLOOR

THE PRODUCT : Topseal / Sikabit1150 – AAP modified bituminous torch welded


Sheet membrane
Polyprim SB- Solvent base bituminous emulsion
Refer comments 1,2, 3
APPLICATION.
below
1. The floor levelling screed concrete is laid with necessary slope to the drain outlets.

2. If any mortar, debris and foreign matter are present on this screed, they are to be
removed. Refer comment 4
below
3. A cement sand fillet minimum of 25mm X 25 mm to be laid at the intersection point
of any vertical and horizontal section such as the wall – slab edge, etc

4. Bituprime primer is now brush apply to the surface (floor and vertical wall) and allow
it to get cure. It act as the key coat for the torch membrane. Refer comment 5
below
5. Torch membrane in now torch laid over the prime surface (floor and vertical walls)

6. Each sheet is lapped to the next sheet – both at side laps and end laps. Minimum laps
to be 75mm.

7. The torch membrane laying on the horizontal is continued on the vertical sections and
terminated on the vertical walls as per the height of 450mm above from finishing floor
level.
Refer comments
8. Then Structure will fill with water and pond tested for minimum of 48 hours.
7,8,9 below
9. Then water will removed and will lay the 50mm thick Rigifoam over the
waterproofing membrane and follow with separation layer (1000g polythene) and will
be protected with a chip concrete. On chip concrete will form expansion joints at every
4m intervals. Groove width should be minimum of 10mm

10. Vertical termination will terminated with aluminium strip fix with using concrete nails
300 mm intervals.

11. A protection plaster to be laid over the vertical walls waterproofing.

12. Allow chip concrete to get cure for minimum of 14 days. Refer comment 10
below
13. Expansion joint will be seal with PS sealant. And allow cure for 3days
1. Prior to laying the leveling screed, the concrete surface shall be well cleaned to
remove any loose materials, dust and contaminants, and the concrete slab shall be
grouted with cement/water slurry before laying the leveling screed.
2. The 1:3 (cement: sand) leveling screed shall be laid with minimum thickness of
25mm and the slope shall be not less than 1:200 or as shown on drawings finished with
a wooden float.
3. The leveling screed shall be kept damp for 5 days and waterproofing membrane shall
be applied after fully drying of the surface.
4. The detail at corners shall be provided with sketches.
5. The application of waterproofing membrane shall strictly be done as recommended by
the manufacturer and adequate lap length of 100mm shall be maintained at all times.
6. At interruption of work the edges of the sheets have to be finished in such a manner
that rain water or duct shall not penetrate underneath.
7. 50mm thick concrete covering screed shall be laid over gauge 1000 polyethylene
sheet as shown on drawings.
8. 50x50mm (3mm dia.) galvanized steel wire mesh shall be embedded in the concrete
covering screed.
9. The expansion joint shall be coincided with the joints of the tile layer above.
10. Material approval shall be taken for the sealant
22nd March 2022

METHOD STATEMENT

PROJECT : PROPOSED CONDOMINIUM PROJECT AT WALIGAMA

SUBJECT : WATERPROOFING OF SWIMMING POOL WALL AND FLOOR

THE PRODUCT : Fleximent 201


a two component cementitious flexible membrane. The product consists of powder and
liquid. The product is a brush application.

APPLICATION.
All plumbing must be completed and pressure tested (if necessary) prior to commencement of
the waterproofing. All voids created for installation of pipes, fitting etc must be filled and
completed

The cement mortars debris on the surface must be removed by main contractor. The surface is
then inspected to ascertain if there is foreign objects/honey combing in the surface. These areas
1 will be hacked and patched prior to waterproofing application by the main contractor.

The product is applied directly on structural concrete. Therefore existing cement sand moter,
on the surface must be removed. The surface is then inspected. If honeycombing exists in, they
will be hacked and patched with grout 280 repairer mortar.

If any water leeks are exists will seal with mortar fast

The surface is then thoroughly cleaned. Once the surface preparation is completed, the surface
is wetted prior to application of the waterproofing. This is to promote capillary action of
product into substrate.

Fleximent 201 powder and liquid are mixed with a mechanical mixer to ensure proper
dispersion of the components. The first coat applied on the concrete substrate. And allow it to
cure for 3-4 hours.

Then second coat application is undertaken over the first coat

Construction joint’s will reinforce with polyester mat and will apply 3rd coat over the 2nd
coat.

In areas where pipes/penetrations exists, the membrane will be extended either along the
surface of the pipe, if the pipe protrudes from the concrete surface or into the pipe if the pipe
is flushed with the concrete surface (finishing level)

Allow product to cure minimum of 24 hours. The structure is then pond tested.( Minimum of
48 hr)
On pond test if there are no any defects is found. Then water will remove and will be protected
with cement sand screed or tile bed.
1. Any uneven areas, defected areas and chiseled patches to be treated with an approved
epoxy resin based un-pigmented primer and to be leveled with a homogeneously mixed
approved 2-component epoxy mortar.
22nd March 2022

METHOD STATEMENT

PROJECT : PROPOSED SOUTH BEACH WELIGAMA CONDOMINIUM PROJECT

SUBJECT : WATERPROOFING OF WATER TANK/ LIFT WELL

THE PRODUCT: Fleximent 201


A two component cementitious flexible membrane. The product consists of powder and
liquid. The product is a brush application.

THE APPLICATION:
All plumbing must be completed and pressure tested prior to commencement of the
waterproofing. All voids created for installation of pipes, fitting etc must be filled and
completed
1
The cement mortars debris on the surface must be removed by main contractor. The surface is
then inspected to ascertain if there is foreign objects/honey combing in the surface. These areas
will be hacked and patched prior to waterproofing application by the main contractor.

The surface is then thoroughly cleaned. Once the surface preparation is completed, the surface
is wetted prior to application of the waterproofing. This is to promote capillary action of
product into substrate.

Lay the fillet minimum of 25mm X 25mm of cement sand is placed at the intersection of the
vertical and the horizontal. (This is to be undertaken by main contractor.)
2
The surface is then thoroughly cleaned. Once the surface preparation is completed, the surface
is wetted prior to application of the waterproofing. This is to promote capillary action of
product into substrate.

The two components that constitute the Fleximent 201 product are mixed to ensure proper
dispersion of the components. The first coat applied on the concrete substrate. On completion
of the first coat, allow product to get cure for 5-6 hours then second coat application is
undertaken over the first coat. Edger’s will reinforce with polyester mat and will apply 3 rd
coat over the 2nd coat.

In areas where pipes/penetrations exists, the membrane will be extended either along the
surface of the pipe, if the pipe protrudes from the concrete surface or into the pipe if the pipe
is flushed with the concrete surface.
Allow product to cure minimum of 24 hours. The structure is then pond tested.( Minimum of
24 hr)
On pond test if there are no any defects is found. The areas may be protected with a cement
sand mortar by main contractor.

1. Any uneven areas, defected areas and chiseled patches to be treated with an approved
epoxy resin based un-pigmented primer and to be leveled with a homogeneously mixed
approved 2-component epoxy mortar.
2. The detail at intersections shall be provided with sketches.
Company Profile
COMPANY PROFILE ICTAD Reg. No. SP-103
SALIK ENGINEERING -

Salik Engineering pvt ltd is one of the fast growing specialize engineering (civil engineering)
company in Sri Lanka. Salik engineering is establish on 2007. We have been worked very closely
with most of reputed construction companies, structural engineers, Architectures, Originations and
prospective customers. We are well experience, technical sound professional and very flexible team
and our approach blended with sound technical knowledge to delivers the customer satisfaction.

Our services.
 Water proofing - Basement
Car pack
Bath room
Roof top
Bridge deck
Water tank & swimming pool
External wall waterproofing

 Painting Internal & External wall smooth finish


External wall coating
Texture coating

 Concrete repair - Any kind of non under water concrete repair


 Industrial flooring – Floor epoxy coating
Epoxy toping
Epoxy screed
Floor hardener
 Sealants & water stop

Managing Director

Mr. D.G.Pradeep L. Kularathna :

 Hold a Marketing management diploma – .


 National certificate course ( Civil Engineering ) in technical college in Maradana – Sri
Lanka .( 03 years course )
 Have got B pass for finishing works from Vocational training college – Sri Lanka.an
 More than 18 years in waterproofing experience

 Have got 06 years working Experience as a Manager Projects- technical at (leading


waterproofing company’s in Sri Lanka)
 Have worked 06 months for NPM group pty. Ltd. At Townsville Australia.
(Painting and decoration division)

Director

Mr.D.G. Rajesh D. Kularathna.

 Hold a Customer care management diploma


 IT diploma certifies holder.
12years of working experience of customer handling

Director

Mrs M. Y.G.C. Premakanthi

 Student of Sri Jayawardanapura university –(Management faculty )


 AAT Part ( 111) certificates holder

Office clack. 02 persons

Site supervisor com QS . 03 persons

Site work force. 15 as a permanent carder


15-20 stand by (when required)

Vehicle. 02 Jeep
01 car
01 Nissan dabble cab
01 Single cab

Equipments . Necessary working tools are available

Banker . HNB – Gampaha


Union bank - Gampaha
DFCC Bank Kakirawa

Experience in field. Please see the attach list

Any clarification please do not hesitate to contact the undersigned on 0777635165


Thank you,
Your faithfully,

SALIK ENGINEERING (PVT)LTD

Pradeep. L. Kularathna.
2
ICTAD Reg. No. SP-103
22nd March 2022

The project Manager,


CSCE (pvt) ltd,
Colombo 0

Dear sir,

SALIK ENGINEERING PAST EXPERIENCE IN THE FIELD


Salik Engineering (pvt) ltd is one of the fast growing ICTAD registered specialize engineering (civil
engineering) company in Sri Lanka. Salik Engineering is establish on 2007. We have been worked
very closely with most of reputed construction companies, structural engineers, Architectures,
Originations and other prospective customers.

We are well sound technical and experience team. Due to our goodwill, efficiency, trust wrath and
reliability we got opportunity to engage some of prestige projects in island wide with sort time of
span.( Fourteen years + ) and we are building up very good relationship with the our customers in
regularly.

WARRANTY
Our waterproofing comes with the 10- year warranty for materials and workmanship, subject to
terms and condition for the warranty.

SITE REFERENCE
We are pleased to inform that we have completed over 450 projects in Sri Lanka. Please see the some
of the prestigious projects which we have completed in success fully

No Project name Contractor / Consultant Area


.
Rehabilitation of Mt. Lavinia
1 hotel Tudawe Brothers Bathrooms & balcony
Rehabilitation of Mt. Lavinia
2 hotel Mt Lavinia hotel management External wall
Telecom building - Penthouse engineering (pvt) Roof terrace, balcony,
3 Jaffna ltd / SLT bathroom

Melbourne garment -
4 Mahiyanganaya EAM Maliban Group Roof top , external
wall
Chinese embassy Shenghi construction group 7
5 Colombo 07 Roof terrace

6 Medical faculty of colombo Wijaya engineering/ SEC Roof slab, terraces,


sump tank
Factory complex -
7 (MAS)Thulhiriya Mawell construction Water tank

Durdance hospital Management


8 Durdance Hospital / Mudith jayakodin Roof slab,
Factory complex - Marching pit ,
9 Ekala Jae la Rhino roofing Concrete repairer,

Public welfare building


10 Pasikuda Bala construction/ building Bathrooms & shower
dept. areas
Governor’s Building Dept. of building (EP) Roof gutter
11 Trincomalee
Roof top , bathroom,
12 Luxury holidy banglow Mr. Gehards -Aluthgama external wall
13 Kali Amman kovil –
Trincomalee Roof slab
Sun deck , roof
14 Taj Viventa- Hotel Taj hotel management / Bimal terraces, planter boxes
Fenando associate ,bathroom

Roof terraces,
15 Taj Samudra- Hotel Taj hotel management / Bimal bathroom, Concrete
Fenando associate repair

16 Taj Samudra- Hotel Savisavana construction / bathroom, Balcony


Cost managment

Roof top, balcony


17 Royal hospital ,- Colombo 06 Tudawe brothers bathroom
Roof top, balcony
18 Luxury Apartment complex, - Tudawe brothers bathroom, swimming
Nawala pool.

19 Residence of Mr.Nadeshan – Sanken construction (sanken Roof terrace,


Arali, Jaffna Lanka) bathroom,

20 Tulsimahal Apartment Sanken construction Roof terrace,


complex – Jaffna bathroom, balcony
sump
Subasinghe construction /
21 Water tower in Madu church building dept. Water Tank
Basement
22 Yale hotel – Jaffna Sanken construction / DG 5 Roof terrace,
bathroom, balcony
Sump, treatment plant
Paranthan to KKS Railway
23 station project (10 stations) Sanken construction / CECB Roof terrace,
bathroom,

24
British council – Jaffna Sanken construction / Roof terrace,
bathroom, balcony
2
Water tank
25
Hostel complex – Jaffna Sanken construction / bathroom, balcony
Phase 1 and 11 sump
26
Hostel complex – Vavnia Sanken construction bathroom, balcony
Phase 1 and 11 sump
27
Hostel complex –Kilinochchi Sanken construction bathroom, balcony
sump
28
Kachcheri building– Jaffna Sanken construction / bathroom, balcony
Building dept
29 Roof top, balcony
Luxury Apartment complex, - Tudawe brothers bathroom, swimming
Colombo 7 pool. External walls
30 Roof top, expansion
Cinnamon grand hotel – Tudawe brothers / Bimal joints
Colombo 3 Fenando associate

31 Sump tank, expansion


National measurement lab - Tudawe brothers / Arch joints
Homagama international
32 Roof top, bathroom,
German tech - Kilinochchi Tudawe brothers / expansion joints.
33 Roof top, bathroom,
Mousses collage – Colombo 7 Tudawe brothers expansion joint
34 Roof top, balcony
Base hospital - Building department / bathroom, Lift well,
Kalawanchchikudi Building dept sump.
35 Roof top, balcony
Luxury Hotel complex, -N- Sarasi construction / Ranmal bathroom, Retaining
eliya associate walls, treatment plant
water tank
36
Low cost Apartment complex Amil builders / SEC balcony bathroom,
- thachchiwatta
37
Low cost Apartment complex Asoka builders /SEC balcony bathroom,
- thachchiwatta
38
Apartment complex for Amil builders / SEC balcony bathroom,
government - Lusiyawatta
39
Apartment complex for Waheed costruction / SEC balcony bathroom,
government - Lusiyawatta
40
Blood bank – Kaluthara/ Access balcony bathroom,
chilow
41 Costumer centre for telecom- Penthouse engineering / SLT Bathroom balcony
bandarawela roof slabs
42 Costumer centre for telecom- penthouse engineering /SLT Bathroom balcony
trincomalee roof slabs .external
walls
43 Packagers Lanka penthouse engineering Bathroom balcony
roof slabs
44 Reedge edge hotel - penthouse engineering Bathroom balcony
uswatakeyyawe roof slabs sump tank
45 Puliumkulam ,mankulam roof slabs , Expansion
Murukkandi, kilinochchi rail IRRCON / CECB joints, cracks repairer
way station
46 Kali kovil Kalawanchchikudi Roof slabs

47 Weerakesary press - Jaela penthouse engineering Bathroom balcony


roof slabs
48 Villa hotel –Halpe, Galle Savisewana Bathroom balcony
roof slabs swimming
pool
49 Factory complex Savisewana Bathroom balcony ,
retaining walls
50 Emerald factory
Emerald Bathrooms
Basement , roof slab,
51 CEB Grid L – Colombo 1 Sierra construction / CEB bathroom, canopy
/Hyosung
Basement , roof slab,
52 CEB Grid M – Colombo 2 Sierra construction /CEB bathroom, canopy
/Hyosung
Basement , roof slab,
53 CEB Grid N – Colombo 2 ESTA International / bathroom, canopy
CEB/Hyosung
Basement , roof slab,
54 CEB – Kalanitissa ESTA International / CEB / bathroom, canopy
Hyosung
Basement , roof slab,
55 The Everest apartment – Sierra construction / bathroom, canopy
Colombo 5
Roof slab, bathroom,
56 Atomic project Colombo 14 Tudawe btothers / ECL canopy, Expansion
joints
Roof slab, bathroom,
57 Bricks apartment - Tudawe btothers balcony , sump
Rajagiriya
Roof slab, bathroom,
58 HSBC – CO”S residence Tudawe homes / DCL balcony , sump,
bungalow- colombo07 swimming pool
Roof slab, bathroom,
59 AVENCY apartment - Mabima / Architect Upul balcony , sump
Negambo
4
Bathroom, balcony ,
60 Erls hotel - Kandy Savisevana retaining wall
Bathrooms ,Balcony
61 TRC Building - Sooriyawawa Tudawe brothers / SLLRDC and water sump
Roof slabs / balcony/
62 Atomic project Colombo 09 Tudawe brothers/ ECL bathrooms/ water
sump/ expansion joints

63 Treatment plant for cargills - Enviro tritech Treatment plant


Baduragoda

64 Chello dairy factory - Chello dairys Treatment plant


Godakawela

65 Tokyo cement factory Enviro tritech / Treatment plant


Sarowerasuriya Associate

66 Multipurpose building for Nandana Rodrigo Roof slab bathroom,


Rajarata univerysity construction – Apura/ SEC

67 UDA Housing complex at HR Holding /SEC /UDA Bathrooms /roof slab


colabage mw.

68 CEB Sub station ESTA International / CEB Basement/ bathrooms


Minuwangoda Galle

69 Proposed market complex - GDP Engineering(pvt)ltd Roof slab /bathrooms /


Homagama sump tanks

70 Proposed market complex- GDP Engineering (pvt)ltd/ Roof slab /bathrooms /


Wallampitiya SEC retaining wall.

71 People bank branch - Sanken Construction (pvt)ltd Roof slab. Bathrooms/


Mulathive DG 5 water tank/ Balcony

72 Mix development project Tudawe Brothers (pvt)ltd Basement / Roof slab.


- Colombo 03 CESE Bathrooms/ water
tank/ Balcony

73 Apartment project- off flower Tudawe Brothers (pvt)ltd / Basement / Roof slab.
road CESE Bathrooms/ water
tank/ Balcony

74 CEB Substation - Biyagama ESTA International / CEB / Basement/ bathrooms/


ABB roof slab
Agrarian office building – GDP Engineering(pvt)ltd / Basement (lift pit) /
75 Colombo -07 CECB Bathrooms / Balcony/
roof slab

76 Court complex - Ruwanwalla CESL/ CEB bathrooms/ roof slab

77 Court complex - Rathnapura CESL/ CEB Lift well / retaining


wall

78 Low cost housing project – HRL / SEC bathrooms


Colabage mawatta

79 CMC Office building – Wijaya engineering - CMC Bathrooms / open slab


Colombo 08

80 Commercial building Piripun property / Priyantha bathrooms/ roof slab/


complex – Colombo 03 premathilaka associate / roof terrace
Basement , roof slab,
81 CEB Grid I – Colombo 2 ESTA International / CEB/ bathroom, canopy
Hyosung

82 CEB Grid A – Colombo 2 ESTA International / CEB/ Basement ,


Hyosung

83 CEB Sub station - Beruwala ESTA International / CEB Basement , bathroom,

84 CEB Sub Station- Kasbawa Dimo / CEB/SIMENCE Bathrooms,


Basement , (roof slab,
85 CEB Grid B– Colombo 1 Vonlan / CEB / Hyosung bathroom, canopy to
be done)
Basement , roof slab,
86 Market building - Katubadda GDP Engineering/ UDA/ SEC bathroom, canopy,
water sump, lift well

Any clarification please do not hesitate to contact the undersigned on 0777635165

Thank you,

Your faithfully,
SALIK ENGINEERING (PVT) Ltd,

Pradeep L .Kularathna.

6
Sika Lanka Pvt Limited 58/12-B, Raja Mawatha, Ekala Jaela

March 28, 2022

To Whom It May Concern;

Sika is a specialty chemicals company which was founded in 1910. The company is a world
leader in the development and production of systems and products for bonding, sealing,
damping, reinforcing, and protecting in the building sector and the motor vehicle industry. Sika
has subsidiaries in over 100 countries around the world and manufactures in over 300
factories.

Sika Lanka (Pvt) Ltd is a fully owned subsidiary of the Sika Group.

Sika Lanka hereby confirms that Salik Engineering (Pvt) Ltd., situated at 311/47, Hansa
Vimana, Hansagiri Road, Gampaha, Sri Lanka, has been appointed Sika’s approved Supplier
and Applicator in respect of:

• Waterproofing Products for the Building Industry

Yours faithfully
SIKA LANKA (PVT) LTD

………………………………..
Sanjeewa Samarakoon
Business Development Manager

SIKA LANKA PVT LIMITED


58/12-B, Raja Mawatha Ekala, Jaela, Sri Lanka
Phone: +94-11-2239977 - Fax: +94-11-2239966
https://lka.sika.com
WARRANTY FOR WATERPROOFING WORK

CLIENT :

PROJECT :

CONTRACTOR. :.

SCOPE OF WORK : WATERPROOFING WORKS

DATE OF COMPLETION OF WATERPROOFING WORKS:

THE WARRANTY:

The waterproofing carries a warranty for a period of 10 years from the date of
completion of the work. We undertake to rectify any material or workmanship defects
in waterproofing, during the said period. This warranty is applicable subject to the
following conditions:

This warranty is void if cracks and/or movement/separations at joints, develop in the structural
of the waterproofed areas that are as a result of settlements, structural failure or any other
cause that may arise directly or indirectly, as a result of defects in design, or due to poor
materials/workmanship in construction.

Structural surface are not stable and found to be working (extending in length), and/or volatile
(displaying movement)

The warranty is void if leaks develop from areas of honeycombing in the structure.

After completion of the structure, the warranty is void if the waterproofed areas, are subjected
to mechanical damage or damage from the work of other trades or persons being employed to
construct on, repair, maintain or alter these areas.

This waterproofing system is not suitable for planters and roots (not roots resist) there for not
recommending to planting over the waterproofing, if do so the warranty is void.

The warranty is also void if the area waterproofed is subjected to any damage and/or the
development of cracks that are as a result of natural and or manmade disasters such as earth
quakes, explosions, etc.

The warranty is applicable solely to the areas waterproofed and is not applicable for any other
areas. In the event of a leak, Salik Engineering (pvt)ltd is not liable for the removal or
reinstallation and any related cost there of screeds or any layer that may have been laid over
the waterproofing.

Salik Engineering(pvt)ltd shall not be liable for any other incidental or consequential
losses, costs, damages or expenses of any description, directly or indirectly arising
from any cause relating thereto whether such claim is based on breach of warranty,
breach of contract, negligence, strict liability on tort, or any other legal theory. Salik
Engineering (pvt)ltd is liability hereunder in any case is expressly limited to the
rectification of defects in the waterproofing subject to the above mentioned terms
and conditions. Any claim with reference to the waterproofing work hereunder for any
cause shall be deemed waived unless made in writing within thirty (30) days from the
date Owner discovered, or should have discovered,
any claimed breach or leak.

Area of works done:

Product used

SALIK ENGINEERING (PVT) LTD

Pradeep L. Kularathna Date.