EX-AB 01 31/03/2020 Issued for As-Built M. BECHA M. BECHA H. Hammami H. Hammami R. Dellacecca
EX-AB 00 13/1/2019 Issued for As-Built M. BECHA M. BECHA H. Hammami H. Hammami R. Dellacecca
EX-CO 00 25/8/2018 Issued for Construction A. BASIL A. BASIL H. Hammami H. Hammami R. Dellacecca
EX-DE 01 4/8/2018 Issued for Approval A. BASIL A. BASIL H. Hammami H. Hammami R. Dellacecca
EX-DE 00 4/1/2018 Issued for Approval A. BASIL A. BASIL H. Hammami H. Hammami R. Dellacecca
Validity Rev.
Prepared Checked Approved Contractor Company
Status Number Date Description
by by by Approval Approval
Revision index
Company logo and business name Project name Company Identification
ZUBAIR OIL FIELD
251213DTEBD0658
eni iraq b.v. DEVELOPMENT PROJECT
Job N.
Contractor logo and business name Contractor Identification
OGI002-PI-0658-00
Drake & Scull International PJSC Contract N.
REVISION HISTORY
1 COVER COVER
2 REVISION HISTORY REVISION HISTORY
3 PIPING PIPING
4 VALVES VALVES
5 NOTES NOTES
This document is property of eni iraq bv. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Contractor logo and business Company Document Contractor Document Revision Index
name Identification Identification Sheet of sheets
Validity Staus Rev. N. 03 of 05
251213DTEBD0658 OGI002-PI-0658-00 EXAB 01
NOTES
General:
The object of the M.T.O. are the following P.I.D. :
This document is property of eni iraq bv. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Company logo and business name of document Owner Company Document Identification Owner Document Identification Revision Index
SHEET OF SHEETS
Validity Status Rev. No.
04 OF 05
Drake & Scull International PJSC 251213DTEBD0658 OGI002-PI-0658-00
EXAB 01
DGS North - Interface Water Out 24" Pipe Rack Installation - Piping Material Take Off (MTO)
DIMENSIONS WEIGHT
PIPING PROJECT
SPECIFICATION
THICKNESS 1
THICKNESS 2
DIAMETER 1
DIAMETER 2
SCHEDULE
RATING
LENGTH
FACING
REFERENCE
END
NO. IDENTITY CODE ITEM MATERIAL FULL DESCRIPTION U.M. QTY. UNIT TOTAL NOTES
NORM.
in in mm mm mm LB Kg Kg
01 43E P01A‐00017 PIPE SMLS BE 2 11.07 XXS ASTM A 106 Gr. B ASME B36.10M Pipe ASME B36.10M BE ASTM A 106 Gr. B SMLS M 0.8 13.44 10.75
02 43E P01A‐00039 PIPE SMLS BE 24 59.54 160 ASTM A 106 Gr. C ASME B36.10M Pipe ASME B36.10M BE ASTM A 106 Gr. C SMLS M 50.247 808.27 40613.14
03 43E P04A‐00105 90° ELBOW R=1.5D BW 2 11.07 XXS ASTM A 234 Gr.WPB ASME B16.9 Elbow 90° LR ASME B16.9 BW ASTM A234 Gr.WPB SMLS EA 2 1.8 3.6
04 43E P04A‐00122 90° ELBOW R=1.5D BW 24 59.54 160 ASTM A 234 Gr.WPC ASME B16.9 Elbow 90° LR ASME B16.9 BW ASTM A234 Gr.WPC SMLS EA 5 954 4770
05 43E P05A‐00624 45° ELBOW R=1.5D BW 24 59.54 160 ASTM A234 Gr.WPC ASME B16.9 Elbow 45° LR ASME B16.9 BW ASTM A234 Gr.WPC SMLS EA 2 635 1270
06 43E P02A‐00048 FLANGE WN BW RTJ 1 9.09 XXS 1500 ASTM A105 ASME B16.5 Flange WN ASME B16.5 1500 LB RTJ ASTM A 105 EA 2 3.92 7.84
07 43E P02A‐00058 FLANGE WN BW RTJ 2 11.07 XXS 1500 ASTM A105 ASME B16.5 Flange WN ASME B16.5 1500 LB RTJ ASTM A 105 EA 2 11.61 23.22
08 43E P02A‐00085 FLANGE WN BW RTJ 24 59.54 160 1500 ASTM A105 ASME B16.5 Flange WN ASME B16.5 1500 LB RTJ ASTM A 105 EA 4 1536.61 6146.44
09 43E P18A‐00244 FLANGE BLIND RTJ 1 1500 ASTM A105 ASME B16.5 Flange Blind ASME B16.5 1500 LB RTJ ASTM A 105 EA 2 3.7 7.4
10 43E P18A‐00248 FLANGE BLIND RTJ 2 1500 ASTM A105 ASME B16.5 Flange Blind ASME B16.5 1500 LB RTJ ASTM A 105 EA 2 10.1 20.2
14 43E P19A‐00271 STUD BOLT + 2 HEAVY NUTS 7/8 125 A193 Gr B7M / A194 Gr 2HM ANSI B1.1 UNC STUD BOLT+2 NUTS ASTM A 193 GR.B7M + A194 GR.2HM (ZINC COATED) EA 8 0.645 5.16 FOR FLANGE WN (1" 1500#)
15 43E P19A‐00471 STUD BOLT + 2 HEAVY NUTS 7/8 150 A193 Gr B7M / A194 Gr 2HM ANSI B1.1 UNC STUD BOLT+2 NUTS ASTM A 193 GR.B7M + A194 GR.2HM (ZINC COATED) EA 24 0.704 16.89 FOR FLANGE WN (2" 1500#)
16 43E P19A‐00295 STUD BOLT + 2 HEAVY NUTS 3 1/2 650 A193 Gr B7M / A194 Gr 2HM ANSI B1.1 UNC STUD BOLT+2 NUTS ASTM A 193 GR.B7M + A194 GR.2HM (ZINC COATED) EA 48 42.02 2016.96 FOR FLANGE WN (24" 1500#)
17 43E P19A‐00296 STUD BOLT + 2 HEAVY NUTS 3 1/2 820 A193 Gr B7M / A194 Gr 2HM ANSI B1.1 UNC STUD BOLT+2 NUTS ASTM A 193 GR.B7M + A194 GR.2HM (ZINC COATED) EA 16 53.01 848.16 FOR FLANGE WN (24" 1500#)
18 43E P10A‐00628 WELDOLET BW 24 1 59.54 9.09 160xXXS ASTM A105 MSS SP‐97 Weldolet MSS SP‐97 ASTM A 105 EA 2 0.38 0.76
19 43E P10A‐00205 WELDOLET BW 24 2 59.54 11.07 160xXXS ASTM A105 MSS SP‐97 Weldolet MSS SP‐97 ASTM A 105 EA 3 0.97 2.91
20 43E ‐‐ NIPPLE, SMLS BBE 1 9.09 XXS 100 ASTM A 106 Gr.B ASME B16.11 Nipple BE ASTM A 106 Gr. B SMLS (100.00 MM LG) EA 2 0.545 1.09
Sheet 3 of 3
Company logo and business name of document Owner Company Document Identification Owner Document Identification Revision Index
SHEET OF SHEETS
Validity Status Rev. No.
05 OF 05
Drake & Scull International PJSC 251213DTEBD0658 OGI002-PI-0658-00
EXAB 01
DGS North - Interface Water Out 24" Pipe Rack Installation - Piping Material Take Off (MTO)
DIMENSIONS WEIGHT
PIPING PROJECT
SPECIFICATION
THICKNESS 1
THICKNESS 2
DIAMETER 1
DIAMETER 2
SCHEDULE
RATING
LENGTH
FACING
REFERENCE NOTES
END
NO. IDENTITY CODE ITEM BORE FULL DESCRIPTION U.M. QTY. UNIT TOTAL
SPEC.
in in mm mm mm LB Kg Kg
01 43E ‐‐ MOV FLG RTJ 24" 1500 ‐‐ 1900MOV102 1900MOV102, 1500# RTJ EA 1 9558.96 9558.96
Sheet 3 of 3