EX-DE 01 17/01/17 Issue for Approval M.HIJAZI H.HAMMAMI C. IALENTI M.SHAKER R. Dellacecca
EX-DE 00 19/11/16 Issue for Approval M.HIJAZI H.HAMMAMI C. IALENTI M.SHAKER R. Dellacecca
Validity Rev.
Status number Prepared Checked Approved Contractor Company
Date Description
by by by Approval Approval
Revision Index
Company logo and business name Project name Company Identification
OGI002-EL-0197-00
Drake & Scull International PJSC
Contract N.
Vendor logo and business name Vendor Identification
Order N.
Facility Name Location Scale Sheet of Sheets
ZUBAIR OIL FIELD - WATER INJECTION ONSHORE n.a. 1 of 10
NETWORK INSTALLATION
Document Title Supersedes N.
EX-DE 01
REVISION HISTORY
EX-DE 01
INDEX
1. General.......................................................................................................................................... 4
1.1 Scope of work........................................................................................................................ 4
1.2 Acronyms and abbreviations.................................................................................................. 4
2. Reference documents................................................................................................................. 5
2.1 Project documents................................................................................................................. 5
2.2 Company Standards.............................................................................................................. 5
2.3 International rules, codes and standards...............................................................................5
3. Temporary CP system calculation and sizing..........................................................................5
3.1 Design life.............................................................................................................................. 5
3.2 TCP Selected philosophy....................................................................................................... 5
3.3 General aspects..................................................................................................................... 5
3.4 CBF and Protection current density.......................................................................................6
3.5 Current requirement calculation............................................................................................. 6
4. Secondary TCP system sizing.................................................................................................... 7
4.1 Anode quantity....................................................................................................................... 7
4.2 Anode resistance versus soil and current available...............................................................7
EX-DE 01
1. General
EX-DE 01
2. Reference documents
EX-DE 01
example, remote tie-in, isolated road crossings etc.), where impressed current
system becomes unpractical (See Ref. Doc. N. 002506TQSDSENIL012).
In our case inside well heads 75m (Safety Area ) distance from the filter requires
the use of magnesium sacrificial anode buried at both sides of pipe.
All the pipelines are made of API 5L X60 carbon steel and are coated by means
of three layer of extruded high density polyethylene (3LPE).
As per FEED resistivity measurement reports shows that Zubair area has been
divided into four ranges of values:
According to ISO 15589-1, paragraph 5.8, table 2, the CBF for the oil transfer
will be 0,001 (value assumed for 10 years of service life).
The protection current densities for bare steel surface (from ISO 15589-1,
paragraph 5.8, Table 1) are:
EX-DE 01
Where:
Ir = total required current (A);
i = protective current density (mA/m 2);
Dj = external diameter of pipeline (or FOC corrugated steel tape
reinforcement) “j” (m);
Where:
W = required anodic mass (kg);
Y = design life (year);
U = utilization factor (%);
C = consumption rate (kg/Ayear);
I = DC feeder actual current output (A).
the weight of anodic material to be installed for the temporary CP system is:
kg
EX-DE 01
Calculation has been carried out considering each pipeline nominal diameter and
a single pipeline span of 75 m.
As for primary TCP, resistivity values taken into account are the following:
Using Equation:
Where:
Da = Anode diameter, including pre-packaged backfill (m).
La = Anode length, including pre-packaged backfill (m).
H = Anode laying depth, bottom of trench (m).
resistance vs. soil of a single magnesium anode, horizontally buried into the soil
at pipeline laying depth (1.5 m), is calculated:
= 2.7
Where:
Ia = Current from anode (V).
k = Correction factor accounting for other resistances in the circuit i.e. cables
resistance, pipeline to earth resistance, soil resistance, usually 0.85.
V = Driving voltage (V).
Pa = Closed circuit potential of anode (V).
P = Protective potential (V).
= 0.205 A
Hence,
EX-DE 01
Summary:
EX-DE 01
Note: Each sacrificial anodes cathodic protection system minimum installation consists of
nos. 2 magnesium anodes, each buried at one side of the pipeline.