You are on page 1of 10

ENI – IRAQ

ZUBAIR OIL FIELD DEVELOPMENT PROJECT

Temporary CP system calculation and sizing


methodology

EX-DE 01 17/01/17 Issue for Approval M.HIJAZI H.HAMMAMI C. IALENTI M.SHAKER R. Dellacecca
EX-DE 00 19/11/16 Issue for Approval M.HIJAZI H.HAMMAMI C. IALENTI M.SHAKER R. Dellacecca
Validity Rev.
Status number Prepared Checked Approved Contractor Company
Date Description
by by by Approval Approval
Revision Index
Company logo and business name Project name Company Identification

ZUBAIR OIL FIELD 250600DECID0197


DEVELOPMENT
eni iraq b.v. Job N.
Contractor logo and business name Contractor Identification

OGI002-EL-0197-00
Drake & Scull International PJSC
Contract N.
Vendor logo and business name Vendor Identification

Order N.
Facility Name Location Scale Sheet of Sheets
ZUBAIR OIL FIELD - WATER INJECTION ONSHORE n.a. 1 of 10
NETWORK INSTALLATION
Document Title Supersedes N.

Temporary CP system calculation and sizing methodology Superseded by N.


Plant Area Plant Unit

Software: Microsoft Word 97-2003 File N° 653411204.doc

This document is property of eni Iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Owner Logo and business name of Company Identification Owner Identification Revision Index Sheet of Sheets
document Owner
Validity Rev.
250600DECID0197 OGI002-EL-0197-00 Status N. 2 / 10

EX-DE 01

REVISION HISTORY

Rev. Date Nr. of sheets Description

EXDE-00 19/11/2016 9 Issue for Approval

EXDE-01 17/01/2017 9 Issue for Approval

This document is property of eni Iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Owner Logo and business name of Company Identification Owner Identification Revision Index Sheet of Sheets
document Owner
Validity Rev.
250600DECID0197 OGI002-EL-0197-00 Status N. 3 / 10

EX-DE 01

INDEX

1. General.......................................................................................................................................... 4
1.1 Scope of work........................................................................................................................ 4
1.2 Acronyms and abbreviations.................................................................................................. 4
2. Reference documents................................................................................................................. 5
2.1 Project documents................................................................................................................. 5
2.2 Company Standards.............................................................................................................. 5
2.3 International rules, codes and standards...............................................................................5
3. Temporary CP system calculation and sizing..........................................................................5
3.1 Design life.............................................................................................................................. 5
3.2 TCP Selected philosophy....................................................................................................... 5
3.3 General aspects..................................................................................................................... 5
3.4 CBF and Protection current density.......................................................................................6
3.5 Current requirement calculation............................................................................................. 6
4. Secondary TCP system sizing.................................................................................................... 7
4.1 Anode quantity....................................................................................................................... 7
4.2 Anode resistance versus soil and current available...............................................................7

This document is property of eni Iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Owner Logo and business name of Company Identification Owner Identification Revision Index Sheet of Sheets
document Owner
Validity Rev.
250600DECID0197 OGI002-EL-0197-00 Status N. 4 / 10

EX-DE 01

1. General

1.1 Scope of work

This document, in conjunction with its Schema, reports the calculations


performed in order to design the Temporary Cathodic Protection system for
the water injection flowlines inside well head.

1.2 Acronyms and abbreviations

3LPE: 3-layer Extruded High Density Polyethylene


CP: Cathodic Protection
CPS: Cathodic Protection Station
DC: Direct Current
DGS: Degassing Station
FEED: Front End Engineering and Design
FL: Flowline
GB: GroundBed
IC: Impressed Current
IJ: Insulating Joint/Device
OTL: Oil Transfer Line
PJB: Positive Junction Box
RP: To be RePlaced
RWP: River Water Pipeline
TCP: Temporary Cathodic Protection
TGB: Temporary GroundBed
Ti/MMO: Activated Titanium / Mixed Metal Oxides
TP: Test Point
T/R: Transformer / Rectifier
UMCS: Upper Medial Complex Satellite
WIT: Water Injection Trunkline.

This document is property of eni Iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Owner Logo and business name of Company Identification Owner Identification Revision Index Sheet of Sheets
document Owner
Validity Rev.
250600DECID0197 OGI002-EL-0197-00 Status N. 5 / 10

EX-DE 01

2. Reference documents

2.1 Project documents

250600DEDQD0133 Water Injection CP Test Points installation drawing


250600DECID0134 Flowlines and Water Injection Trunk lines - CP Calculation
Report – CPS 7,8,9
250600DERBD0135 CPS 8 Single line diagram
250600DERBD0136 CPS 9 Single line diagram
250600DERBD0137 CPS 10&11 Single line diagram
250600DESTD0139 Water Injection Flowlines CP system installation specification
250600DEGAD0195 CP CABLE DATA SHEET
250600DEDQD0196 CP Temporary Installation Drawings Water Injection flowlines
250600DECID0197 Temporary CP system calculation and sizing methodology
250600DEQRD0198 CP Inspection Test Plan
250600DEGBD0200 CP Anodic Inspection data sheet for Water Injection flowlines
250600DLRDD0270 TECHNICAL BID EVALUATION FOR CPS MATERIAL

2.2 Company Standards

27589.VAR.COR.PRG Guidelines for design and construction of cathodic


protection systems.

2.3 International rules, codes and standards

EN 12954 Cathodic protection of buried or immersed metallic


structures – General principles and application for
pipelines.
ISO 15589-1(2001)Petroleum and natural gas industries – Cathodic
protection of pipeline transportation system – On land
pipelines.
NACE SP0169 Control of external corrosion on underground or
submerged metallic piping systems.
NACE SP0177 Mitigation of alternating current and lightning effects on
metallic structures and corrosion control systems.

3. Temporary CP system calculation and sizing

3.1 Design life


Temporary Cathodic Protection system shall be designed in order to guarantee the
minimum life of protection of 3years.

3.2 TCP Selected philosophy


Because of the great variability of soil resistivity, even inside the same DGS
area, an impressed current CP system has been chosen as primary solution in
order to guarantee the correct temporary cathodic Protection to the pipelines,
while sacrificial anodes CP system choice remains as a secondary solution only
for short, remote or isolated trunks of pipeline, with length inferior to 200 m (for

This document is property of eni Iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Owner Logo and business name of Company Identification Owner Identification Revision Index Sheet of Sheets
document Owner
Validity Rev.
250600DECID0197 OGI002-EL-0197-00 Status N. 6 / 10

EX-DE 01

example, remote tie-in, isolated road crossings etc.), where impressed current
system becomes unpractical (See Ref. Doc. N. 002506TQSDSENIL012).
In our case inside well heads 75m (Safety Area ) distance from the filter requires
the use of magnesium sacrificial anode buried at both sides of pipe.

3.3 General aspects

All the pipelines are made of API 5L X60 carbon steel and are coated by means
of three layer of extruded high density polyethylene (3LPE).

As per FEED resistivity measurement reports shows that Zubair area has been
divided into four ranges of values:

Low resistivity areas: 1 - 10 Ω∙m


Medium resistivity areas: 10 - 100 Ω∙m
High resistivity areas: 100 - 1,000 Ω∙m
Very high resistivity areas: > 1,000 Ω∙m

CPS Soil resistivity


T/R Location
Nos. range
7 South Complex Satellite Medium
8 Lower Medial Complex Satellite Medium
9 Upper Medial Complex Satellite Low
10 North Complex Satellite low

3.4 CBF and Protection current density

According to ISO 15589-1, paragraph 5.8, table 2, the CBF for the oil transfer
will be 0,001 (value assumed for 10 years of service life).
The protection current densities for bare steel surface (from ISO 15589-1,
paragraph 5.8, Table 1) are:

Low resistivity areas: 20 mA/m2


Medium resistivity areas: 10 mA/m2
High resistivity areas: 5 mA/m2
Very high resistivity areas: 1 mA/m2.

For three-layer epoxy-polypropylene coated steel surface at 30°C (from ISO


15589-1, paragraph 5.8, Table 2) are:

Low resistivity areas: 0.020 mA/m2


Medium resistivity areas: 0.010 mA/m2
High resistivity areas: 0.005 mA/m2
Very high resistivity areas: 0.001 mA/m2.

Because the maximum operating temperature is 77°C, the values reported


above change into these final protection current density values for TCP:

This document is property of eni Iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Owner Logo and business name of Company Identification Owner Identification Revision Index Sheet of Sheets
document Owner
Validity Rev.
250600DECID0197 OGI002-EL-0197-00 Status N. 7 / 10

EX-DE 01

Low resistivity areas: 0.044 mA/m2


Medium resistivity areas: 0.022 mA/m2
High resistivity areas: 0.011 mA/m2
Very high resistivity areas: 0.002 mA/m2.

3.5 Current requirement calculation

For each CPS, total required current is determined as follows:

Where:
Ir = total required current (A);
i = protective current density (mA/m 2);
Dj = external diameter of pipeline (or FOC corrugated steel tape
reinforcement) “j” (m);

Lj = length of pipeline “j” (m).

For 10’’ water injection of length 75m:

Ir=0.044*3.14*0.273*75=0.003A (current density for low resistive area has been


taken into consideration 0.044 mA/m2 )

4. Secondary TCP system sizing.

4.1 Anode quantity

Where:
W = required anodic mass (kg);
Y = design life (year);
U = utilization factor (%);
C = consumption rate (kg/Ayear);
I = DC feeder actual current output (A).

the weight of anodic material to be installed for the temporary CP system is:
kg

Number of anodes due to weight is:

This document is property of eni Iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Owner Logo and business name of Company Identification Owner Identification Revision Index Sheet of Sheets
document Owner
Validity Rev.
250600DECID0197 OGI002-EL-0197-00 Status N. 8 / 10

EX-DE 01

so one anode due weight is required

4.2 Anode resistance versus soil and current available

Calculation has been carried out considering each pipeline nominal diameter and
a single pipeline span of 75 m.

As for primary TCP, resistivity values taken into account are the following:

low resistivity case: 10 m

Using Equation:

Where:
Da = Anode diameter, including pre-packaged backfill (m).
La = Anode length, including pre-packaged backfill (m).
H = Anode laying depth, bottom of trench (m).

resistance vs. soil of a single magnesium anode, horizontally buried into the soil
at pipeline laying depth (1.5 m), is calculated:

= 2.7 

The current available from each anode is calculated by means of Equation

Where:
Ia = Current from anode (V).
k = Correction factor accounting for other resistances in the circuit i.e. cables
resistance, pipeline to earth resistance, soil resistance, usually 0.85.
V = Driving voltage (V).
Pa = Closed circuit potential of anode (V).
P = Protective potential (V).

= 0.205 A

Hence,

This document is property of eni Iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Owner Logo and business name of Company Identification Owner Identification Revision Index Sheet of Sheets
document Owner
Validity Rev.
250600DECID0197 OGI002-EL-0197-00 Status N. 9 / 10

EX-DE 01

hence one magnesium anode is required

Where N is the total number of anodes to be installed

Summary:

Pipeline nominal diameter [inch] 10

Current demand for 75 m of pipeline [A] 0.015

Anodes number due to weight requirements 1

Anodes number due to current requirement (current demand / Ia) 1

Number of anodes chosen for a single battery 1

Current available for the whole anodes installation [A]


0.410
(2Ia  I)

Total anodes number required for 75 m of pipeline (*) 2

This document is property of eni Iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Owner Logo and business name of Company Identification Owner Identification Revision Index Sheet of Sheets
document Owner
Validity Rev.
250600DECID0197 OGI002-EL-0197-00 Status N. 10 / 10

EX-DE 01

Note: Each sacrificial anodes cathodic protection system minimum installation consists of
nos. 2 magnesium anodes, each buried at one side of the pipeline.

This document is property of eni Iraq B.V.