Facility Name Location Scale Sheet of Sheets
ZUBAIR OIL FIELD - GENERAL ONSHORE 1 of 9
Document Title Supersedes N.
Superseded by N.
MATERIAL REQUISITION FOR EARTHING MATERIAL Plant area Plant unit
REVISION HISTORY
INDEX
1- GENERAL……………………………………………………………………………………………………………… 4
2- APPLICABLE DOCUMENTS…………………………………………………………………………………….. 5
3- SUPPLIER DOCUMENTS REQUIRED………………………………………………………………………………………………………………
6
4- NOTES………………………………………………………………………………………………………………. 7
5- ITEMS TO BE SUPPLIED BY SUPPLIER………………………………………………………………………………………………………………
8
6- VENDOR DOCUMENT LIST……………………………………………………………………………………………………….
9
See Sheets 5
TECHNICAL DOCUMENTS
See Sheet 6
QUALITY DOCUMENTS
QUALITY SYSTEM DEFINITION:
WHEN APPLICABLE, THE SUPPLIER SHALL ADOPT A QUALITY MANAGEMENT SYSTEM IN ACCORDANCE WITH THE FOLLOWING:
ISO 9001: 2015 / UNI-EN ISO 9001: 2015 APPLICABLE NON APPLICABLE
Q1 ISO 9001 CERTIFICATE 1D
QUALITY DOCUMENTS
See page 4
MANAGEMENT DOCUMENTS
See page 4
APPLICABLE DOCUMENTS
Item Company Doc. no. Rev Contractor Doc. no. Rev. DESCRIPTION
CONTRACTOR TECHNICAL DOCUMENTS
1 250613DEEZD0138 EXDE-00 OGI002-PI-0138-00 MTO for Earting materials ( Water Injection Wells)
2 250613DEEZD0138 EXDE-01 OGI002-PI-0138-00 MTO for Earting materials ( Water Injection Wells)
10
11
12
13
14
15
ENI STANDARD
19 06020.MAT.ELE.STD. Power and Control Cables, single core and multicore, for rated voltage Uo/U up to 0,6/1kV
16
17
18
19
NOTES
(*) A step of payment (to be agreed with procurement) shall be subject to the first issue of the document.
(**) If required apply project standard attached to this document
In case of conflict on technical requirements between different standard relevant the same subject, the most stringent criteria shall apply.
Some reference documents mentioned in the project specification, may be not included in this Material Requisition,
because considered of minor impact and not critical for the technical and commercial quotation. However is the bidder
responsability to ask for any further clarification or documentation in case of need.
2. VENDOR Scope of Supply shall be in full compliance with Project Data Sheets and Specifications (as per Page 5 of this M.R.).
REV. DATE
(1) Please indicate the Reference Item number shown in the "Vendor Document Required" Section of the MR to which the Document refers to
(1) Indicare l'item number riportato nella sezione "Vendor Document Required" della MR al quale il documento si riferisce
This document is property of eni iraq B.V.
It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.