ENI - IRAQ

ZUBAIR OIL FIELD DEVELOPMENT PROJECT

MOD Water Treatment Project - Intake System - Mechanical Data Sheet


for Pumps

Issued for A.Khattab


EX-DE 00 14-12-2021 A .Zaki M.Kalamawy M.Zeadan
Comments A. Zahran
Validity Rev.
Contractor
Status Number Date Description Prepared By Checked By Approved By Company Approval
Approval
Revision index
Company logo and business name Project name Company Document ID
ZUBAIR OIL FIELD
252100DVGA01095
Exploration & Production Division DEVELOPMENT
PROJECT Job N.
Contractor logo and business name Contractor Document ID

IGC (IRAQ General Company for Execution of Irrigation Projects)


Contract N.
Vendor logo and business name Vendor Document ID

Consolidated Consultants Group


Order N.
Facility name Location Scale Sheet of Sheets
ZUBAIR FIELD GENERAL ONSHORE N.A. 1 OF 4
Document title Supersedes N.

Superseded by N.
MOD Water Treatment Project - Intake System - Mechanical Data Sheet for
Pumps Plant Area Plant Unit
2521 N.A.
Software File No. 507153-WTS-PR-T03-0347-DT-001_B.xlsx
This document is property of eni iraq bv.
It shall neither be shown to Third Parties, nor used for purposes other than those for which it has been sent.
Owner Document Revision Index
Company Document
Identification Validity Sheet of sheets
Identification Rev. N.
Status 2 of 4
252100DVGA01095
EX-DE 00

REVISION HISTORY

Rev. Date Nr. of


Description
sheets
EX-DE 00 14/12/2021 4 Issued for Comments
Company Document Contractor Document Sheet of
Revision Index
Identification identification Sheets
Eni iraq b.v. Valid. Rev.
252100DVGA01095 3/4
EX-DE 00

MECHANICAL DATASHEET HORIZONTAL CENTRIFUGAL PUMPS


TBA GRUPPO ATURIA S.p.A.
Product Code Manufacturer
TBA
Order no. PDM 250-350
Type
1 No. STAGES: SERIAL No.:
ITEM : 01-510-XPA-001 A/F
2 TYPE: n Proposal o Purchase o As built
3 SERVICE: Raw Water Lifting Pumps n Continuous o Discontinuous
4 STANDARD AND CODES: oAPI 610ED. oDIN n ISO 9908 o Other
5 No. OF PUMPS REQUIRED: 6 Motor Driven No. Electric motor Driven No.
6 In Operation 5 Motor Item No. - Item No.
7 Spare 1 Motor Provided By Pump Vendor Provided By
8 Motor Mounted By Pump Vendor Mounted By
LIQUID (Refer Process Data Sheet OPERATING CONDITIONS (Refer Process Data SITE CONDITIONS (Refer Process Data Sheet
9
00252100DPGA00917) Sheet 00252100DPGA00917) 00252100DPGA00917)
10 PERFORMANCE (TO BE COMPLETED BY MANUFACTURER)
11 Proposal Curve No. W121418 Design Flowrate (m³/h) 1200 NPSH Available / Required (m) 5.5 / 3,93
12 Speed ( r./min ) 1450 Thermal Stable 3 % Head Drop
13 Efficiency ( % ) 85.1 Suction pressure barg 0.097 Max. Head Rated Imp. (m)
14 Rated Power (kW) 104 Differential pressure barg 2.7 Max. Power Rated Imp. (kW)
15 CONSTRUCTION (TO BE COMPLETED BY PURCHASER AND MANUFACTURER)
16 LINE: SIZE RATING NOZZLES: SIZE RATING FACING LOCATION MISC.CONN.: SIZE&RATING LOCATION
17 Suction 24" 150# Suction 12" 150# RF Side Drain Valve & Flg.
18 Discharge 16" 150# Discharge 10" 150# RF Side Vent. Valve & Flg.
19 Bal. Drum Warm Up N/A N/A
20 CASING MOUNT: IMPELLER DIAMETER: (mm) REACCELERATION: o Yes n No
21 oCenterLine n Foot Rated 380 Max. 329.6 Min. 320 AUTOMATIC START-UP: n Yes oNo
22 oNew CenterLine oBracket Imp. Type oOpen n Closed BEARING TYPE:
23 oVertical oInline Imp. Suct. oSingle n Double Radial Antifriction Thurst Antifriction
24 oVertical Barrel oSump Imp. Mount. n Btwn Brgs oOverhung LUBRICATION TYPE: o API 614
25 CASING SPLIT: Rotation (Viewed from CPLG) oCW oCCW n Grease o Ring Oil o Oil Mist
26 n Axial oRadial PACKING: oFlood o Flinger o Pressure
27 CASING TYPE: n Single Volute Manufacturer COUPLING:
28 oDiffuser oDouble Volute Type Manufacturer Metastream or equivalent
29 oStaggered oBarrel Size/No. Rings Type Flexible Model
30 WEAR RINGS: MECHANICAL SEAL CARTRIDGE DRIVER HALF-COUPLING MOUNTED BY:
31 n Inlet Only oInlet & Outlet Side API Class Code n Pump Mfr. o Driver Mfr. o Purchaser
32 n Case Only oCase & Impeller Manufacturer FLUITEN GLAND PLATE TAPS REQUIRED:
33 MAX. ALLOWABLE PRESSURE: Model oQuench o Flush o Drain oVent
34 At Norm. Pump. Temp. (bar g) Manufacturer Code Gland Type/Matl.
35 Hydro Test Pressure (bar g) 1,5 x MAWP REMARKS: VTC
36 TBA= To be advised once PO is issued
37 Vendor to confirm a performance curve continuosly raising up to the shut-off
38 The differential head is defined based on assumptions for the pipe routing. The values may change when the routing is finalized
39 Vendor to advise the MAWP
40 Vendor to confirm 5% Performance Head Increase with the same casing selected
Company Document Contractor Document Sheet of
Revision Index
Identification identification Sheets
Eni iraq b.v. Valid. Rev.
252100DVGA01095 4/4
EX-DE 00
1 MATERIALS (TO BE COMPLETED BY MANUFACTURER)
2 oTable H-1 Class n Case Wear Rings SAF 2507 BASEPLATE:
3 oBarrel oImp. Wear Rings n Material CS
4 n Case ASTM A890 Gr. 4A n Shaft UNS 32750 n Type Fabricated
5 n Impeller ASTM A890 Gr. 5A n Sleeve SAF 2507 oAPI 610 Std. No.
6 oCorrosion Allowance (mm) Parts in contact with fluids n Foundation Bolts Required/Vendor scope
7 REMARKS:
8 AUXILIARY PIPING (TO BE COMPLETED BY MANUFACTURER)
9 n SEAL FLUSH PIPING PLAN 11 oAUXILIARY FLUSH PLAN oCOOLING WATER PIPING PLAN
10 oTubing o Carbon Steel oTubing oCarbon Steel oTubing o Carbon Steel
11 oPipe oStainless Steel o Pipe oStainless Steel o Pipe o Stainless Steel
12 PIPING ASSEMBLY: oExternal Seal Flush Fluid o Copper
13 oThreaded oFlanged oSight Flow Indicators Required
14 oSeal Welded oSocket Welded oTotal Cooling Water Required (m3/h)
15 HEATING FLUID: oPacking Cooling Injection Required
16 Temperature (°C) Pressure (bar g) /
17 COOLING FLUID:
18 Temperature (°C) Pressure (bar g) / oFouling factor (m² °K/W)
19 REMARKS:
20 INSPECTION AND TEST (TO BE COMPLETED BY PURCHASER)
21 TEST: NON-WIT WIT OBSERVED Casting Repair Procedure Approval Inspection Req'd for
22 Performance o n o Req'd for Casing oMag. Particles o Dye Penetrant
23 Hydrostatic o n o Inspection Req'd for Nozzle Welds oRadiographic o Ultrasonic
24 NPSH (*) o n o oMag. Particle n Dye Penetrant REMARKS:
25 n Shop Inspection n Material Cert. Inspection Req'd for
26 n Dismantle and Inspect. after Test (7) oRadiographic oUltrasonic
27 REMARKS: (*) - NPSH Test shall be performed when NPSHa - NPSHr is < 1m
28 MOTOR DRIVER (TO BE COMPLETED BY PURCHASER AND MANUFACTURER)
29 n Rated Power (kW) 132 n Enclosure IP 55 n Insulation F
30 n Frame 315 M - Poles 4 n Temperature Rise Class B oManufacturer
31 n Volts/Phase/Hz 400/3/50 n Full Load AMPS n Bearings Antifriction
32 n Type B3 n Locked Rotor AMPS n Lube Greased for life
33 REMARKS: Tropicalization Required; DOL
34 MASSES (TO BE COMPLETED BY MANUFACTURER)
35 Mass of Pump (kg) VTC Mass of Pump (kg) REMARKS:
36 Mass of Baseplate (kg) VTC Mass of Baseplate (kg)
37 Mass of Motor (kg) VTC Mass of (kg)
38 Mass of Gear (kg) Mass of (kg)
39 Total Mass (kg) 1740 Total Mass (kg)
40 REMARKS:
41 REFERENCE DOCUMENTS
42 PROCESS DATASHEET - RAW WATER PUMPS PROCESS DATA SHEET 252100DPGA02808
43 I.T.P. - CENTRIFUGAL PUMPS (ALL TAGS) 00252100DBQR01469
44 INSPECTION & TEST PHILOSOPHY 00252100DBQC01466
45 P.&I.D. - CLARIFIED
RAW WATER
WATER
LIFTING
TRANSFER
SYSTEM
00252100DPFQ00834
PID 252100DPFQ00915
41 ADDITIONAL INFORMATION
42 1) Pump casing shall be designed as per Cl. 5.5 of specification 01205.MAC.MEC.FUN
43 2) NPSH available is calculated with the following assumptions:
44 pump discharge nozzle centerline elevation from the grade equal to 0,7 m (including baseplate). Pumps shall be selected
45 such that the difference between NPSHA and NPSHR shall not be lower than 0.5 m
46 3) Pumped fluid may contain traces of solids. Vendor shall consider the same in pump design and in the seal system selection.
47 4) Electric Motor shall be selected and sized for open valve discharge @ start-up
48 5) DELETED
49 6) To be confirmed during detail engineering phase.
50 7) Only in case Test Failure may happen
51 8) VTC = Vendor to Confirm
52 9) Maximum Sound Pressure Level: 85 dBa @ 1 mt
53 10) Hydrostatic Test Pressure to be 1,5 x Maximum Allowable Working Pressure
54 11) The rating of flanges with diameter smaller than 2" shall be at least 600#.