General Requirments 614,257
Electrical - Power 104,746,641
Electrical - Communication 5,876,538
Mechanical - Utilites 27,841,290
Total 139,078,726
REV-0 Page1 of
6TH OCTOBER DRY PORT PROJECT
at
October, Egypt
InfraStructure
BILL OF QUANTITIES
E2032
REV-0
REV-1 Page2 of
October Dry Port ( ODP )
October Dry Port-Execution of Infrastructure Networks.
DP6-P03
General Requirements
Package
Included
Item INFRA TOTAL
Description Unit P03
ODP-contractor Notes
no. Qty.
U/P Total
GENERAL REQUIREMENTS
The Contractor is required to insert prices in the General
Requirements section of the BOQ, which are deemed to include
the Engineer’s facilities (site accommodation, transportation,
offices, etc.) and all such facilities are to be dismantled by the
Contractor and carted away at project completion.
EMPLOYER'S FACILITIES
Site Offices
Rooms to be sized, furnished, equipped and airconditioned to fit for
A purpose adequate
Provide in addition3m
to toilets, buffet/pantry and
X 9m pre-fabricated site all other facilities
Caravans to as
Including :
approved by the Employer / Consultants
accommodate: Caravan (4 Care) , 2 Acs , 2 Desks , 2 Cubboards , 2
- 2 Employer Representative office nr 1 1 121,286 121,286 Movable Chairs,4 Waiting Chairs(Not Including
Computers Or Printers Or Water Dispanser)
REV-0 Page3 of
TOTAL Rate Amount
Description Unit
Qty (EGP) (EGP)
DIVISION 26 - ELECTRICAL
Supplying, installing, connecting and testing of Package Substation (500 KVA, 11/0.4 KV ) complete with RMU,
A01 Dry type Transformer, Low tension Panel, Busbars and all other necessary accessories and ancillary works as No 2 1,537,620 3,075,240
specified and as indicated on the drawings in comliance with the public distribution Co. rules.
Supplying, installing, connecting and testing of Package Substation (1000 KVA, 11/0.4 KV ) complete with
A02 RMU, Dry type Transformer, Low tension Panel, Busbars and all other necessary accessories and ancillary works No 5 1,696,856 8,484,280
as specified and as indicated on the drawings in comliance with the public distribution Co. rules.
Supply, install, connect and test of dry step down transformer as specified and as indicated on the drawings
A03 including all necessary accessories and ancillary works and materials required for complete installation No 2 4,428,743 8,857,486
Supply , Installing, connecting and testing of a 500 KVA. (at 45°C ambient) 0.8 p.f., 380 V Diesel outdoor
generator set all in accordance with detailed technical specifications complete with all necessary accessories and
C01 ancillary works such as, but not limited to the following : Silencer, flexible joints, exhaust pipes, daily fuel tank No 2 1,520,701 3,041,402
for 24 hours continuous operation at rated load, fuel tank lines, foun-'dation accessories, monitoring and
protection equipment. Also including a set of complete erection material and special tools
Supply , Installing, connecting and testing of a 1000 KVA. (at 45°C ambient) 0.8 p.f., 380 V Diesel outdoor
generator set all in accordance with detailed technical specifications complete with all necessary accessories and
C02 ancillary works such as, but not limited to the following : Silencer, flexible joints, exhaust pipes, daily fuel tank No 5 3,619,626 18,098,130
for 24 hours continuous operation at rated load, fuel tank lines, foun-'dation accessories, monitoring and
protection equipment. Also including a set of complete erection material and special tools
D 26 36 00 - TRANSFER SWITCHES
Supply, install, connect and test of the automatic transfer switch complete with all control, monitoring and
protection equipment including control cabling and all necessary auxiliary components and ancillary works
required for complete operative system.
D01 ATS (1250A) Nr 2 462,779 925,558
Supplying, installing, connecting and testing 11 K.V. Cables (3x240) mm² AL/XLPE/STA/PVC
between the medium voltage switchgear and transformes including handing over to electricity authority,
m 2500 1,344 3,360,000
terminations, cable ladder, all necessary accessories, ancillary works and materials required for complete
installation as specified and as indicated on the drawings.
REV-0 Page4 of 10
TOTAL Rate Amount
Description Unit
Qty (EGP) (EGP)
Supply, install, connect and test light fixtures including all lamps, mounting 10m steel poles, mounting
devices and brackets as shown on the drawings, specification and as scheduled. The item shall include all
necessary wiring, earthing, conduits & termination of the luminaires to their respective circuits. The
works include the necessary pole concrete base, excavation, backfilling & removal of the excess soil
outside the site. All light fixtures will be supplied and installed by Contractor . The light fixtures models
are included in the tender drawings.
Supply, Install, tet & hand-over in compliance with the tender specifications & drawings Lighting Mast (H01)
G04 including Lighting Control Panels and lighting fixtures as Indicated in the Design Drawing No.S 25 1,200,239 30,005,975
Supply, Install, tet & hand-over in compliance with the tender specifications & drawings Lighting Mast (H02)
G05 including Lighting Control Panels and lighting fixtures as Indicated in the Design Drawing No.S 4 898,687 3,594,748
REV-0 Page5 of 10
TOTAL Rate Amount
Description Unit
Qty (EGP) (EGP)
I-1 The Switch gear shall be (17 Cell) with [2 incoming + 1 couplers + 1 Riser + 8 Outgoing + 1 Spares) No.S 1 4,246,617 4,246,617
I-2 The Switch gear shall be (17 Cell) with [2 incoming + 1 couplers + 1 Riser + 2 Outgoing ) No.S 1 2,436,306 2,436,306
J Furnishing,
GROUNDING supplying, installing and
AND BONDING testing
FOR a complete protective
ELECTRICAL SYSTEMS earthing (PE) system complete with
earthing pits, earthing electrodes, equalizer bars, earth continuity conductor, and earthing conductor to
RMU, switchboards, diesel generator set and transformers in each package substation complete with all
No.S 7 47,274 330,918
accessories, fixing brackets, test links, complete with all accessories, fixing brackets, test links
Earthing impedance
suspensions, drillingmust be <= 5for
and cutting ohm
complete installation all in accordance with technical specifications
and drawings
DIVISION 26 - ELECTRICAL
TOTAL 104,746,641
To Summary Exclude Unit Rates
REV-0 Page6 of 10
TOTAL Rate Amount
Description Unit
Qty (EGP) (EGP)
DIVISION 27 - COMMUNICATIONS
A TELECOMMUNICATION SYSTEM
Design Supply, install, connect and test telecommunication system including all ancillary work required for
complete the work as duct bank , cables , …. ,
Supply install, connect and test of Light Current Duct Back including (3No. of 80 mm DIA) to connect
A01 Telecommunication system as specified and indicated in the drawings with all necessary m 2800 565.00 1,582,000.00
termination, and all necessary accessories required to complete operative system
Supply install, connect and test of Light Current Manhole to connect Telecommunication system as specified
A02 and indicated in the drawings with all necessary termination, and all necessary accessories required to complete No 46 16,919.00 778,274.00
operative system
Supply install, connect and test of Light Current Handhole to connect Telecommunication system as specified
A03 and indicated in the drawings with all necessary termination, and all necessary accessories required to complete No 36 13,934.00 501,624.00
operative system
Supply, install, connect and test 6 core M.M fiber cable The item shall include raceways, splicing , splicing
A04 closures ,,media converter, pig tails fiber SC connectors ,fiber cable pulling & all necessary sleeves. The works Mt 1100 906.00 996,600.00
shall be complete as per the project specifications
Supply, install, connect and test 4 core M.M fiber cable The item shall include raceways, splicing , splicing
A05 closures ,,media converter, pig tails fiber SC connectors ,fiber cable pulling & all necessary sleeves. The works Mt 1020 667.00 680,340.00
shall be complete as per the project specifications
Supply, install, connect and test 2 core M.M fiber cable between outdoor racks The item shall include raceways,
A06 splicing , splicing closures ,,media converter, pig tails fiber SC connectors ,fiber cable pulling & all necessary Mt 2100 637.00 1,337,700.00
sleeves. The works shall be complete as per the project specifications
DIVISION 27 - COMMUNICATIONS
To Summary Exclude Unit Rates
TOTAL 5,876,538.00
REV-0 Page7 of
Item Description QTY Unit Rate Amount
MECHANICAL
1ST DIVISION 33 - UTILITIES
A HDPE piping(33
SECTIONS of 25
PN1030) for underground
SEWER DRAINAGEsewer drainage network. The item shall
PIPE NETWORK:
be include with pipe supports, testing & Handing over. The works include
A-1 Supply ,install,
excavation & backtest filling
& handto. the
Over :-
pre-excavation FFL as per the contract
documents and site supervision instructions. The item shall be complete with
A-1-1 removal
- HDPE of excess
pipe soil of
dia 1000 mm.the backfilling process to their approved destinations 115 MT 11,868 1,364,820
A-1-2 outside
- HDPEthe site.
pipe diaThe
900item
mm.shall be complete & adequate as per tender drawings & 75 MT 9,651 723,825
specification .
A-1-3 - HDPE pipe dia 800 mm. 130 MT 7,825 1,017,250
A-1-4 - HDPE pipe dia 700 mm. 350 MT 6,652 2,328,200
UPVC piping of PN6 for underground sewer drainage network. The item shall be
A-1-5 include
- HDPEwith
pipepipe
dia 650 mm. testing & Handing over. The works include
supports, 90 MT 5,347 481,230
excavation & back filling to the pre-excavation FFL as per the contract
documents and site supervision instructions. The item shall be complete with
A-1-6 removal
- UPVC of excess
pipe soilmm.
dia 600 of the backfilling process to their approved destinations 280 MT 3,587 1,004,360
A-1-7 outside
- UPVCthe site.
pipe diaThe
550item
mm.shall be complete & adequate as per tender drawings & 130 MT 2,935 381,550
specification .
A-1-8 - UPVC pipe dia 500 mm. 190 MT 2,544 483,360
A-1-9 - UPVC pipe dia 450 mm. 250 MT 2,152 538,000
A-1-10 - UPVC pipe dia 400 mm. 280 MT 1,761 493,080
A-1-11 - UPVC pipe dia 350 mm. 776 MT 1,305 1,012,680
A-1-12 - UPVC pipe dia 300 mm. 1034 MT 979 1,012,286
A-1-13 - UPVC pipe dia 250 mm. 850 MT 718 610,300
A-1-14 - UPVC pipe dia 200 mm. 1410 MT 522 736,020
A-1-15 - UPVC pipe dia 150 mm. 1200 MT 424 508,800
A-1-16 Excavation of rocky soil as per specifications. 1 M3 261 261
Supply ,install, test & hand-over Sewer manhole constructed of concrete cast-in
manhole base & manhole riser. The item includes manhole steps & benching.
Excavation, back filling & excess soil removal to it's approved destinations are
included in the item works. The Sewer manhole structure shall be treated againest
water leakage. The item cast iron cover shall be approved by the state authority of
jurisdiction. The sewer construction shall comply with the tender attached design
drawings & specifications. The works shall be complete with all accessories as
specified & shown in the tender drawings The sewer manhole cover shall
Complete with 40ton bearing capacity. If under roadways 600x600mm.
A-2-1 '-Sewer manhole with depth higher than 1.51m & less or equal to 2,5m 66 NO 26,083 1,721,478
A-2-2 '-Sewer manhole with depth higher than 2.51m & less than 4m 19 NO 45,645 867,255
REV-0 Page8 of
Item Description QTY Unit Rate Amount
Supply, construct & hand over: 2000x2000mm valve chamber to include main
B-3 water
Valve supply
Chamber pipe network isolating valves. The chamber shall be constructed of
brickwork
3000x2000mm shall Water
be constructed of brickwork
valve chamber complete
to include with rein
main water forced
supply concrete
isolating
B-3-1 4 NO 52,166 208,664
ceiling slab. Excavation, backfilling & excess soil removal to approved
valves & accessories. The chamber shall be constructed of brickwork complete
destinations are include
with rein forced concretewithin
ceilingtheslab.
itemExcavation,
works.The backfilling
item shall be
& complete with
excess soil
B-3-2 40ton bearing capacity.ductile cast iron double seal cover and frame.
removal to approved destinations are include within the item works. The item
- Main
shall beproject
completeWater
withmeter
40tonvalve
bearingchamber as per detail
capacity.ductile drawings
cast iron double seal cover 1 NO 71,728 71,728
and frame.
B-4 Air release valve manhole.
Supply, erect, test & hand-over the item including-
Supply, install, test & hand-over siamese connection with 4 outlets dia 2.5"
complete with isolating, check valves, pipe connections to the pipe network and
2 NO 11,412 22,824
controls. The units shall be in compliance with NFPA rules & UL listed & as
shown in the tender documents.
Supply, install, test & hand-over: 150mm Fire hydrant with two hose nozzles.
The hydrant Interior shall be removable without digging up hydrant. The hydrant
C-2 shall be complete with 150 mm bell connection;with nozzle caps securely chained
Fire hydrant
to barrel. The item includes excavation, back filling & soil removal to approved
54 NO 50,210 2,711,340
destinations outside the site. Concrete thrust block under the valve shall be
employed as per the respective specification detail. The item components shall be
rated for fire protection duties as per NFPA & Egyptian fire codes. The item shall
include all necessary accessories for the piping connection.
REV-0 Page9 of
Item Description QTY Unit Rate Amount
Supply, install, test & hand-over 2000x2000mm valve chamber to include main
water supply pipe network isolating valves. The chamber shall be constructed of
brickwork shall be constructed of brickwork complete with rein forced concrete
6 NO 52,166 312,996
ceiling slab. Excavation, backfilling & excess soil removal to approved
destinations are include within the item works. The item shall be complete with
40 Ton bearing capacity, ductile cast iron double seal cover and frame.
Summary
MECHANICAL
To Summary 27,841,290
REV-0 Page10 of