PROJECT: 2x660 MW Buxar Thermal Power Project

Price Schedule for HVAC Cooling Towers Units Date:

Sr No. Description Qty UOM Unit Price(INR) Total Price (INR)


for 2 Units
A BASE OFFER

Induced Draft Cooling tower of Flow rate 520 M3/HR at roof of TG main control Building with Standard
Accessories as per the contractual specification and as agreed during preorder meetings, as
required/applicable within terminal points to make system complete, as derived during detail
1 engineering, design & engineering and engineering inputs for interface, as per specification and our 2 Nos - -
techno-commercial bid/ subsequent TQ clarifications/ MOM/ various correspondences had with you till
date and taking into consideration the clarification/ resolutions/ MOM’s/Amendments had with you till
date in regard to technical and commercial points

Induced Draft Cooling tower of Flow rate 325 M3/HR at roof of Service Building with Standard
Accessories as per the contractual specification and as agreed during preorder meetings, as
required/applicable within terminal points to make system complete, as derived during detail
2 engineering, design & engineering and engineering inputs for interface, as per specification and our 2 Nos
techno-commercial bid/ subsequent TQ clarifications/ MOM/ various correspondences had with you till
date and taking into consideration the clarification/ resolutions/ MOM’s/Amendments had with you till
date in regard to technical and commercial points

Induced Draft Cooling tower of Flow rate 54 M3/HR at roof of Canteen Building with Standard
Accessories as per the contractual specification and as agreed during preorder meetings, as
required/applicable within terminal points to make system complete, as derived during detail
3 engineering, design & engineering and engineering inputs for interface, as per specification and our 2 Nos
techno-commercial bid/ subsequent TQ clarifications/ MOM/ various correspondences had with you till
date and taking into consideration the clarification/ resolutions/ MOM’s/Amendments had with you till
date in regard to technical and commercial points

Induced Draft Cooling tower of Flow rate 66M3/HR at roof of water system control Building with
Standard Accessories as per the contractual specification and as agreed during preorder meetings, as
required/applicable within terminal points to make system complete, as derived during detail
4 engineering, design & engineering and engineering inputs for interface, as per specification and our 2 Nos
techno-commercial bid/ subsequent TQ clarifications/ MOM/ various correspondences had with you till
date and taking into consideration the clarification/ resolutions/ MOM’s/Amendments had with you till
date in regard to technical and commercial points

Induced Draft Cooling tower of Flow rate 37 M3/HR at roof of Switch yard control Building with
Standard Accessories as per the contractual specification and as agreed during preorder meetings, as
required/applicable within terminal points to make system complete, as derived during detail
5 engineering, design & engineering and engineering inputs for interface, as per specification and our 2 Nos
techno-commercial bid/ subsequent TQ clarifications/ MOM/ various correspondences had with you till
date and taking into consideration the clarification/ resolutions/ MOM’s/Amendments had with you till
date in regard to technical and commercial points

6 Commissioning spares 1 Set Deemed included Deemed included

Mechanical Mandatory spares As per specification Please refer Volume II General and schedule
Chapter 9 ( 9.00 Air conditioning system) Mandatory spares sheet 51 of 106 ;
Note:
7 1)Any deviation to the list is subject to NTPC approval. 1 Lot - -
2)If any item of mandatory spares declared as not applicable/not quoted by bidder, if found to be
applicable during detail engineering stage then the same shall be supplied by Bidder without any
implication to L&T.

8 Special tools and tackles 1 Set Deemed included Deemed included


9 Packing & Forwarding the material 1 LS Deemed included Deemed included
10 QA/QC activities till obtaining MDCC from customer 1 LS Deemed included Deemed included

11 Erection (Material issuing, transportation to erection site, Assembly, commissioning and handing over to 1 LS
client) please quote for each model size and capacity separately
Basic Contract Price - Supply (Ex-works) -

B OPTIONAL PRICE [Valid till end of DLP]


1 Transportation Charges for complete Package 1 LS - -

In case erection is not in the scope of Bidder, Supervision charges for Erection, Testing &
Commissioning and PG Test at Site (Inclusive of To & Fro Travelling, lodging & boarding and Local
2 7 MD
Conveyance)and Training of Owner's Personnel as per owner's requirement ; Note: PO shall be
amended at same per-diem rate in case services are required beyond 7 MD

Mechanical Recommended spares As per OEM recommendation list (Item wise detail cost break up
3 required ) 1 Lot - -

4 Electrical Recommended spares As per OEM recommendation list (Item wise detail cost break up 1 Lot - -
required )

5 Control & Instrumentation As per OEM recommendation list (Item wise detail cost break up required) 1 Lot - -

6 Extended Warranty Charged beyond agreed DLP (CPBG Extension Charges) 1 Qtr - -

C Remark
1 GST shall be paid extra at actual
2 Custom Duty shall be inclusive in price
Note
1 Total offer Price shall remain firm and fixed basis till the end of the contract. Offer validity shall be 6 months from the date of submission.

2 Items/Quantities as specified/listed/considered above by supplier shall not limit the scope of supply/services of the supplier. Any item and/or Service, Additional Quantities
as required/applicable to satisfy the Technical Specification Requirement shall be part of scope though not explicitly specified/listed/considered and quantified.

Repair/Replacement of material/equipment including to & fro transportation from site to supplier's works shall be taken care by supplier; Note: Acceptance of repair as part
3 of trouble shooting shall be subject to Owner/NTPC approval.

Visits as required from Experts/Supplier's representative/Supplier's Sub-supplier representative for trouble shooting, commissioning of special equipment, analyzers,
4
instruments etc shall be in supplier's scope and included in above price.

5 Any other services required for completion of scope of works for total scope of work shall be deemed inclusive in contract price.

6 Supervision charges are inclusive of to & fro travelling, lodging & boarding and local conveyance. No overtime shall be paid over & above Per-diem rate.

7 All the statutory requirement including Insurance (in the State where the work is being carried out) for supplier's manpower shall be complied and borne by supplier.

8 Man day date shall be counted from date of reporting at site to the date of departure from site (travel time will not be considered for Man day calculation). Further, Holiday
and Weekly off shall not be counted in Man-day Calculation

This price offer is being submitted based on Inquiry specification and subsequent TQ closure. Supplier hereby confirms that, there is no deviation considered in this price
9 offer with respect to TQ closure.

For

Authorized Sign & Stamp


Please refer Volume II General and schedule Chapter 9 ( 9.00 Air conditioning system

If any equipment items are replaced with the alternative arrangments then ,
Sr Description

5 5. Cooling Tower (for each model capacity and size )


a Nozzles for cooling towers 20 Nos
b Float valve assembly
c Fan Bearings
d Motor bearings
e V-belt for C.T. fan (if applicable)
onditioning system) Mandatory spares sheet number 51 of 106

angments then , Alternative items spares to be considered.


Quantity Total numbers Price /Unit Total Price

20 Nos
1 No
1 set
1 Set
1 set
RECOMMENDED SPARES

C& I
A To be listed by Bidders

Electrical

B Motors
1 Terminal plates
2 Heaters
3 Motor of each type and rating

Mechanical

1 To be listed by Bidders
2
3

4
MENDED SPARES

C& I
Qty Price /Unit Total price

lectrical

echanical

You might also like