Hindalco Industries Ltd, Mahan Aluminium

Facility / Process Change Management (Annexure-I)


MOC No. :

Date : 12/09/20
Name of the initiator( Not below SH) : Sanjay Kumar
Department : CPP-Operation
Designation : Sr. Manager
Plant : Hindalco Industries Limited
Location : Mahan-CPP
Area : Boiler
Cost Centre : Rs/-
Subject (Title of Change) AC EOP –current to provide in DCS.

Present Scheme AC EOP current is not available in DCS


(Ref. Doc. No.)

Objective For Proposing The Change Current indication will increase the reliability of
AC EOP which is a very critical equipment.

Proposed Scheme AC EOP current is to be made available in


(Revised Doc. No.) DCS

Estimated Cost & & Cost Benefit Estimated cost - Rs/-


Analysis Benefit

1. It will give predication in case of pump or


motor failure.
2. It will also help in failure analysis.
3. Wrong feedback can also be analysed.
4. It will give additional information other than
operator feedback from local.

ATTACHEMENT (Drawing / sketch / Attached PPT


P&IDs) if any: Before Modification
drawing attached
MOC Owner/Initiator (SH or above) :- Remarks if any:
Name :-
Start Date :

1|Page
HOD – Operation. Remarks if any:

Approve Date:

HOD – Mechanical. Remarks if any:

Approve Date:

SH/HOD Technical Remarks if any:

Approve Date:-

HOD – E & I Dept. Remarks if any:

Approve Date:

HOD – CTS Remarks if any:

Approve Date:

HOD – EHS. Remarks if any:

Approve Date:

Maintenance Planner ( Smelter/CPP) Remarks if any:

Approve Date:

MOC Approved / Not Approved

Signature of Plant Head /Unit Head:


Approval Date :

2|Page