Brand Teroson
IDH 2122453
Technology Platform Acoustic & Structurals
Application L2 Structural / Impact - Terokal
Market BIW
Substrates & Dimensions - Reinforcement(Felt, PU foam) / 1x 150 x 185mm
- Structural Fram and Panels / 1x110x170mm
Competitors ANABOND
Cost Benefit Calculations (All data in LC) Local Currency (LC): INR
Cost Element With previous method With Henkel solution Remarks / Explanations
(per part) (per part)
Product Cost 49 64 Cost of material used per part
Labor 3.5 0.20 Cost of labor used per part
Energy 2.64 0.64 Cost of energy
Wastage 4.9 0.2 Cost of wastage
Quality Cost 2.85 0.12 Cost of scrap / rejection / rework etc.
Other Costs 0.67 0 Rework
Total Cost per part A = 63.56 B = 65.16 Saving (A-B) = -1.6
Total Annual Savings S = (A-B) * No. of parts per annum = -35200
Model