I hereby declare that the project work entitled ‘ Visionary Small and Medium Enterprises/
VSME & RFT’ is my original work carried out at EICHER TRACTORS A UNIT OF TAFE
MOTORS & TRACTORS LMITED MANDIDEEP, BHOPAL as requirement of THREE
WEEKS project in partial fulfillment for the award of degree of Bachelor of Engineering
(Mechanical engineering). TECHNOCRATS ISTITUTE OF TECHNOLOGY & SCIENCE
Bhopal under the guidance of Mr. VIKRAM PANDEY during 03rd JULY to 23th JULY
2019.
PRADYUMN MANGAL
(0902ME171038)
DATE: 23.07.2019
Certified that the above statement made by the statement made by the
student is correct to the best of our knowledge and belief.
INDEX
Chapter 1
1. RFT
Objective
Working
Defects
I. Black paint on power steering spindle
II. Scratch on Bonnet, Bumper, Mudguard and Fuel tank cover
III. Harness of wire
IV. Sticker miss
Chapter 2
2. VSME
About
Part Identification
Time Study
Chapter 3
3. Terracon Weight
Aim
Theory
Analysis
Procedure
Chapter 4
4. ACTION PLAN
Aim
Theory
Procedure
Learning
Chapter 5
Conclusion
Chapter 1
Basically the objective of this project is to ensure that all the activities occurring in assembly
shop are right and does not require any kind of re-work after the assembly of tractor. This
will decrease defects per unit tractor which in turn will increase the overall RFT.
RFT (%) = (No. of tractors direct pass through D1, D2 & D3 stage/ Total no. of tractors
inspected)*100
(D1, D2, D3 are quality check points where checking is done weather operator cause any
defect or not and if defect is found rectified by rework man)
Working-First time means correct in first go. When process input is 100 finished products
then the first time right is 100%. Any input which is not passing through first time because of
any reason will lead to some sort of rework and will reduce the first time right percentage.
My main Focus is to find defect caused by assembly or due to wrong process followed.
Defects-
Solution – In post painting during sub assembly the bonnet, mudguard & fuel tank are
bring into a single-single trolley for sub assembly so that the scratches which are
generated due to fouling is so reduced.
III. Sticker miss
Problem-There is some safety sticker to be attached on battery box which operator
miss may times.
Analysis-Process of operator is studied what operation he does and how much time it
take and cause of miss is analysed.
Solution-It was find out operator has limited time to work on tractor on his station.
He paste sticker at end of after all process. Many times due to lack of Time or in hurry
he misses that process. In solution this process moved from last to first position and
there is decrease in defect of sticker miss.
VSME
About-VSME is tool helps in development and increasing production of small and medium
scale industries. Main objective of VSME is “Make one, Sell one” means to reduce
inventory as much as possible. Other goals of VSME are to increase productivity and to
reduce work load on operator, eliminate all possible causes of defect occurring during
assembly and many more. VSME program nurtures manufacturing transformation. It aims to
create a win- win relationship between customers and suppliers. In VSME we make a plan of
whole day of production and focus is to achieve the objective. It also focus that activities are
carried out as per plan. By applying this tool it control the unwanted activities and increase
the productivity of a whole day. It is more convenience and economical for industrial purpose
therefore this plan is growing different areas now these days. Under this plan there are so
many activities are take place.
Part Identification-
Aim-My Goal was to make part identification for operator and store man easier.
Analysis-There was increase in wrong part or hardware fitment because of which
rework increasing and RFT is decreasing. Other issues are store man supplying wrong
Hardware to wrong person. Just in one area (pre-Painting) there are more than 10
racks with more than 300 types of hardware To have proper supply and identification
of every hardware A list of hardware with item code description ,supply location and
bin location is made. Then we made stickers of every part with bin location and item
code and paste it on every bin such that there is no mistake by store man in supplying
products.
REFLECTION-I learned about so many different hardware. How these are used in
assembly. How these are differentiated depending on many factors.
TIME STUDY
Aim – My Goal was to study about different models and calculating their time of assembly
in pre painting line.
Analysis- I analysis that there were so many activity are take place in main line assy.
in pre painting which are undesirable, because of that the current time was different
than actual time of main line assy. process and the extra time was taken to make a
tractor. Therefore the efficiency of main line and the rate of productivity are
decrease.By time study we have find the NVA( non-valuable activity) in main line
assy. and reduce them by another activities which are desirable. The different tools
are provided to the workers so that the time has become reduced for making a tractor.
After that we have find the rate of productivity is increases 20 to 30 per. in few
months.
a. Line Efficiency = total minutes produced *100/ total hour worked *60
c. Cycle time = Actual time required for a worker to complete one cycle of his process
TERRRACON WEIGHT
Theory-Terracon weight is used in place of bumper.it consist of 6 plates each of weight 17kg
net weight 102kg.Early it was attached in D3 by hand one by one then tighten by nut and
bolts. It took approx. 15 min per tractor.
Analysis-My aim was to introduce assembly of Terracon weight on line. Per station approx.
time allotted is 4.5 min. I did time study of each station and analyzed where assembly is
possible such that it don’t effect sub assembly of any other part near that station. A station
was selected and we started working on reducing assembly time from 15 min to 4.5 min.
Various methods were tested finally we achieved assembly time in 4.5 min.
Current procedure-Firstly weights are divided into 2 equal sets. These sets are tighten with
nut bolt. Each set lifted by tackle at RHS and LHS and assembly is made on Tractor. At last
both sets are Tighten by big nuts and bolts and tackle is removed.
Conclusion-In last there is a lot to learning and gain of experience through this process. I
applied time study concepts which I learned in college. When we were thinking of tackle
there were very complex designs coming in my mind but my mentor said make it simple and
in end simple belt is connected biggest reason for selecting belt is it won’t generate much
scratches.
CHAPTER -4
ACTION –PLAN
PROCEDURE -
Conclusion
On the whole, this internship was a useful experience. I have gained new knowledge, skills
and met many new people. I achieved several of our learning goals. I got insight into
professional practices currently advocated in the industry. I learned different the different
facets of working within a well-established industry. Related to our study I learned more
about the manufacture, assembly and testing of three phase distribution transformers.
Furthermore I have experienced that it is of importance that education is objective and that
I have to be aware of industrial aspects of the topics I study this internship program was not
one sided, but it was a way of sharing knowledge, ideas and opinions.
The internship was also good find out my strength and weakness. This helped us to define
what skills and knowledge I have to improve in coming time. I can confident assert that the
knowledge I gained through this internship is sufficient to contribute towards my future
endeavors. At last this internship has given us new insights and motivation to pursue a
career in core mechanical departments.