U#1
• Hot air duct insulation damage at several places
• ESP outlet duct insulation damage at several places.
• Mill E common duct insulation damage.
• Boiler insulation near ECO #1 insulation damage.
• APH B insulation and refractory damage.
• Soot blowing line common header insulation damage.
• Insulation near wsb 40.
• Pa Fan B housing insulation damage.
• FD fan A insulation damage.
• Mill A PA to hot duct insulation damage.
• PRDS lt and ht insulation not effective. Improvement required.
• Hph 6 vent to Deaerator line insulation damage.
• Gsc syphon 0 mtr insulation required.
• LPBP spray line insulation required.
• Hp bypass spray drain line insulation improvement required.
• Hph 6 to dearator drain line 0 mtr insulation damage.
• FD 13A insulation damage.
• Ebfp drain line insulation damage
• Id fan A outlet duct insulation damage.
• Pa Fan A body insulation damage.
Unit 2
• Saf 2A insulation damage.
• Pa duct before APH Pass A, pass B insulation damage.
• Pa 2A discharge duct insulation damage.
• CAD B/C/D insulation damage.
• HAG C/D/E insulation loose condition.
• HAG B insulation damage.
• HAG E insulation damage.
• Mill A common duct insulation damage.
• ESP inlet duct B insulation damage.
• Mill A common duct insulation damage.
• Bfp A and B recirculation line insulation required.
• Lpbp spray line 5.5 mtr insulation damage.
• Ex 13 mov insulation damage.
• Feed water inlet hph 6 insulation damage.
• MS strainer LHS 0 mtr insulation damage.
• PRDS lt and ht insulation not effective. Improvement required.
• LPBP spray line insulation required.
• I'd fan B fan bearing nde side insulation damage.
Unit 4
• DR 1 insulation damage.
• Gsc header drain near HP bypass insulation damage.
• MS line boiler RHS 40 mtr insulation damage.
• RHS gauge glass stand pipe insulation damage.
• Sampling station 16 mtr insulation damage.
• Boiler insulation damage near ECO #4 at 16 mtr.
• Mill E HAG insulation damage.
• PRDS lt and ht insulation not effective. Improvement required.
• Lp bypass spray line insulation required.
• Crh 1 bypass valve insulation damage.
• Crh drain line 0 mtr insulation required.
• Hp 5, 6 and lph 2,3 vent line insulation required.
Unit 5
• Id fan 5 B before chimney insulation damage.
• Common duct ID fan insulation damage.
• 22 mtr eco inlet line insulation damage.
• HAG mill E insulation damage.
• CBD line 13 mtr insulation damage.
• All PRDS drain line insulation damage.
• Lp flash tank to condenser line insulation damage.
• MAL drain 15 insulation damage.
• HPH5 QCNRV insulation damage.
• Lph 2 extraction mov insulation damage.
• Lph 3 extraction mov insulation damage.
• PRDS lt and ht insulation not effective. Improvement required.
• Dearator stand pipe insulation required.
Unit 6
• Drain cooler inlet and Outlet line insulation required.
• Cep discharge line to ejector insulation required.
• CD 27/19& CD 29 line not insulated.
• CD 80/78/72 cep discharge to PRDS not insulated.
• PRDS lt and ht insulation not effective. Improvement required.
• 16 MTR CR 1,3,4 CD elevation near burner
• FW eco inlet line near E2 v/v.
• Both APH flue gas outlet duct sheet missing insulation available
• 48 MTR pent house door insulation RHS not available.
• 40m ms drain line insulation not available.
• Soot bolwer line up v/v for APH insulation not available.
U#1
• Hot air duct insulation damage at several places Not started
• ESP outlet duct insulation damage at several places. Not started
• Mill E common duct insulation damage. Not started
• Boiler insulation near ECO #1 insulation damage. Not started
• APH B insulation and refractory damage. Not started
• Soot blowing line common header insulation damage. Not started
• Insulation near wsb 40. Not started
• Pa Fan B housing insulation damage. Not started
• FD fan A insulation damage. Not started
• Mill A PA to hot duct insulation damage. Not started
• PRDS lt and ht insulation not effective. Improvement required. Not started
• Hph 6 vent to Deaerator line insulation damage. Not started
• Gsc syphon 0 mtr insulation required. Not started
• LPBP spray line insulation required. Not started
• Hp bypass spray drain line insulation improvement required. Not started
• Hph 6 to dearator drain line 0 mtr insulation damage. Not started
• FD 13A insulation damage. Not started
• Ebfp drain line insulation damage Not started
• Id fan A outlet duct insulation damage. Not started
• Pa Fan A body insulation damage. Not started
FD fan B fan body insulation damage Not started
Id fan B outlet duct bellow insulation damage Not started
* PLEASE ADD ANY NEW INSULATION DEFECTS IN BLANK SPACE
Unit 2
• Saf 2A insulation damage. NOT STARTED
• Pa duct before APH Pass A, pass B insulation damage. NOT STARTED
• Pa 2A discharge duct insulation damage. NOT STARTED
• CAD B/C/D insulation damage. only B done
• HAG C/D/ insulation loose condition. Hag D/E/A work done
• HAG B insulation damage. work done
• HAG E insulation damage. work done
• Mill A common duct insulation damage. NOT STARTED
• ESP inlet duct A insulation damage. NOT STARTED
• Mill A common duct insulation damage. NOT STARTED
• Bfp A and B recirculation line insulation required. NOT STARTED
• Lpbp spray line 5.5 mtr insulation damage. NOT STARTED
• Ex 13 mov insulation damage. NOT STARTED
• Feed water inlet hph 6 insulation damage. NOT STARTED
• MS strainer LHS 0 mtr insulation damage. NOT STARTED
• PRDS lt and ht insulation not effective. Improvement required. NOT STARTED
• LPBP spray line insulation required. NOT STARTED
• Id fan B fan bearing nde side insulation damage. work done
ID fan A insulationimprovement required
• Cep discharge line to ejector insulation required. PROJECT OIC