EX-DE 00 04/03/13 Issue for Approval M. Rech U. Marinelli C.Corradetti A. Tattanelli R. Dellacecca
Validity Rev.
Prepared Cheched Approved Contractor Company
Status Number Date Description
Revision index by by by Approval Approval
Company logo and business name Project name Company Document ID
IQ00125063504EN228
Contract n.
Vendor logo and business name Vendor Document ID
Order n.
Facility Name Location Scale Sheet of Sheets
ZUBAIR OIL FIELD - GENERAL ONSHORE 1 of 6
Document Title Supersedes N.
Supersedes by N.
RIVER WATER PIPELINE, FLOWLINES AND WATER TRUNKLINES CATHODIC
Plant area Plant unit
PROTECTION ANODES IDS
File N° 00250600DEGB4195S_EXDE00_06
This document is property of Eni Iraq b.v..
It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Logo and business name of Company Document Owner Document Identification Revision Index
document Owner Identification
Validity Sheet of sheets
Rev. N. 2 of 6
Staus
REVISION HISTORY
INDEX
River water pipeline, flowlines and water trunklines cathodic protection anodes IDS 4
Description of checks and tests 5
Notes 6
River water pipeline, flowlines and water trunklines cathodic protection anodes IDS
ASSEMBLY TAG:
MANUFACTURER / MODEL: SUPPLIER / ORDER:
C P T S
COMPANY PURCHASER THIRD PARTY SUPPLIER
(Eni Iraq bv.) (Sicim/Drake & Scull JV) (Subvendor)
CERTIFYING AUTHORITIES:
TYPE OF INTERVENTION:
CODE DESCRIPTION CONCERNED COMP.
H BINDING PRESENCE. The cycle continuation is bound to the presence C and/or P
P BINDING PRESENCE FOR THE % INDICATED IN THE NOTES C and/or P
W NOT BINDING PRESENCE. In case of unwitnessed test the Supplier is authorized C and/or P
to continue the production cycle supplying the appropriate documents.
R CHECK/APPROVAL OF THE CERTIFICATES AND/OR DOCUMENTS, before commencement of shop activities C and/or P
DOCUMENTATION:
Doc. No.00250600DEST4184S "River water pipeline, flowlines and W.I. trunklines CP materials specification"
Doc. No.00250600DEGA4197S "River water pipeline, flowlines and water trunlines cathodic protection anodic groundbed material data sheet"
River water pipeline, flowlines and water trunklines cathodic protection anodes IDS
ASSEMBLY TAG:
MANUFACTURER / MODEL: SUPPLIER / ORDER:
CODE OF
no. DESCRIPTION OF CHECKS AND TESTS INTERVENTION REFERENCE
C P T S
1 TYPE TESTS
2.2 Verification of gauging and calibration of instruments used for checks and tests R TC
River water pipeline, flowlines and water trunklines cathodic protection anodes IDS
ASSEMBLY TAG:
MANUFACTURER / MODEL: SUPPLIER / ORDER:
NOTES:
3) The compliance with the prototype can be documented by similarity of the project material, subject to the
Company's approval.