VENT ( PFD )
ACTIVE CARBON HEAT EXCHANGER (TWO PASS)
SINGLE ROTARY COMPRESSOR RECOVERY BASKET FILTER
COMPLETION CENTRIFUGAL PUMP (PFD)
WELL HEAD
G
SCREW PUMP LIQUID/LIQUID DRYER G
COALESCER
MEMBRANE
BURNING PIT
COOLERS AGITATOR / MIXERS
SUBMERSIBLE PUMP CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A. OLIVIERI T.VECCIA C. MARZI R.CHIORRINI
K (SUBMESERSED MOTOR)
CD-FE 02 21/12/10 ISSUED FOR TENDER A. OLIVIERI T.VECCIA C. MARZI R.CHIORRINI
K
CD-FE 01 17/12/10 FINAL ISSUE A. OLIVIERI T.VECCIA C. MARZI R.CHIORRINI
M AIR COOLER CD-FE 00 22/09/10 ISSUED FOR APPROVAL A. OLIVIERI T.VECCIA C. MARZI R.CHIORRINI
Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
Status number Approval Approval
Revision index
AIR COOLER Company logo and business name Project name Company identification
AGITATOR/MIXER
WITH LOUVRES ZUBAIR OIL FIELD 00250600BPFM08030
DEVELOPMENT PROJECT Job. N
DIAPHRAGM PUMP
Contractor logo and business name Contractor identification
L AIR COOLER L
WITH ACTUATED 022026-2506-GD-B-08030
LOCK GATE Contract N
Vendor logo and business name Vendor identification
N.A. N.A.
PUMP DATA TABLE Order N N.A.
DESIGN FLOW RATE m3/hr 0.000 Facility Name Location Scale Sheet of Sheets
SUCTION PRESSURE barg 0.000
DIFFERENTIAL PRESSURE bar 0.000
ZUBAIR FIELD ONSHORE N.A. 2 of 10
DRIVER POWER kW 0.0
MATERIAL OF CONSTRUCTION X AGITATOR/MIXER DATA TABLE Document Title
LEGENDA & SYMBOLS Supersedes N.
M INSULATION YES/NO YES / NO DRIVER POWER kW 0.0 Superseded by N. M
TRIM No. XXX.XX.XXX.XXX.X MATERIAL OF CONSTRUCTION X
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_02_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
B B
BUTTWELDED NOZZLE
FLANGED NOZZLE
FLANGED NOZZLE
WITH BLIND
ATMOSPHERIC TANK
INTERNAL NOZZLE
INSTRUMENT CONNECTION
C C
MANWAY PIT DATA TABLE
HORIZONTAL VESSEL WITH POT DIMENSION m 0/0/0
MANWAY VOLUME m3 0
DESIGN OPERATING PRESSURE barg 0.000 / 0.000
DESIGN OPERATING TEMPERATURE C° 0.0 / 0.0
MATERIAL OF CONSTRUCTION X
HAND HOLE INSULATION YES/NO YES / NO
TRAY-GENERAL
DOME ROOF TANK
SIEVE TRAY
VALVE TRAY
VANE PACK
TOTAL DRAW-OFF TRAP WITH CONCENTRIC REDUCER TRAP WITH ECCENTRIC REDUCER
TRAY
SWIRL DECK
REDISTRIBUTION
LIQUID/LIQUID
WIRE MESH
HORIZONTAL DATA TABLE
INTERNAL DIAMETER mm 0 RECEIVING/LAUNCHING TRAP DATA TABLE
SCHOEPENTOETER LENGHT (T to T) mm 0 BARREL DIAMETERS INCH. 0.0 / 00
DESIGN OPERATING PRESSURE barg 0.000/0.000 LENGHT mm 0.0
DESIGN OPERATING TEMP. C° 0.0 / 0.0 DESIGN OPERATING PRESSURE barg 0.0 / 0.0
G MATERIAL OF CONSTRUCTION X DESIGN OPERATING TEMPERATURE C° 0.000 / 0.000 G
TANK WITH SKIMMER INSULATION YES/NO YES / NO MATERIAL OF CONSTRUCTION X
INSULATION TRIM No. XXX.XX.XXX.XXX.X INSULATION YES/NO YES / NO
TRIM No. XXX.XX.XXX.XXX.X
VERTICAL VESSEL
REDISTRIBUTION SLUG CATCHER FINGER TYPE
H GAS LIQUID INJECTION H
SEDIMENTATION TANK
VORTEX BREAKER
J J
IFINGER NUMBER AND ID n°Xinch 0X0 Company logo and business name Project name Company identification
FINGERS LENGHT m 0 ZUBAIR OIL FIELD 00250600BPFM08030
DESIGN OPERATING PRESSURE barg 0.000 / 0.000 DEVELOPMENT PROJECT Job. N
DESIGN OPERATING TEMP. C° 0.0 / 0.0
M ELECTRIC MOTOR PROPELLER MIXER MATERIAL OF CONSTRUCTION X Contractor logo and business name Contractor identification
L INSULATION YES/NO YES / NO L
022026-2506-GD-B-08030
TRIM No. XXX.XX.XXX.XXX.X
TANK DATA TABLE Contract N
NOMINAL CAPACITY m3 0 Vendor logo and business name Vendor identification
WORKING CAPACITY m3 0
N.A. N.A.
DESIGN OPERATING PRESSURE barg 0.000/0.000
DESIGN OPERATING TEMP. C° 0.000/0.000 Order N N.A.
EJECTOR INTERNAL DIAMETER mm 0 Facility Name Location Scale Sheet of Sheets
GAS TURBINE HEIGHT mm 0 ZUBAIR FIELD
MATERIAL OF CONSTRUCTION X ONSHORE N.A. 3 of 10
INSULATION YES/NO YES / NO
Document Title
TRIM No. XXX.XX.XXX.XXX.X LEGENDA & SYMBOLS Supersedes N.
M Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_03_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A NOTES: A
PRIMARY PIPING END CAPPED AND
END CAP 1. ALL VENTS AND DRAINS ARE SIZE 3/4" IF NOT OTHERWISE INDICATED.
BUTT WELDED
DRAIN
EXTERNAL HOT FLUID TRACED FLEXIBLE COUPLING RUBBER HOSE PIPING CLASS BREAK
UG AG INDICATION OF CHANGE
OF ELEVATION E.G. ABOVE
INTERNAL HOT FLUID TRACED 03 03 GROUND, UNDERGROUND
D BARRED TEE INSULATING FLANGE VENDOR CONTRACTOR D
INDICATION OF SUPPLY LIMIT CHANGE
JACKET (INTERNAL PIPING) AND PACKAGE LIMIT
TIE-IN POINT
RS
MIXING TEE REMOVABLE SPOOL
E INDICATION OF E
MIXING TEE CONSTRUCTION STATUS
03 CHANGE
PACKAGE LIMIT XX
SC
XXX
SAMPLE CONNECTION INDICATION OF
DESIGN CONDITION CHANGE
SILENCER
DEFINITION LAYOUT
F A F
BASKET SINGLE BASKET LINE TO BE ROUTED TO A POINT DESIGNATED WITH NO
STRAINER / FILTER STRAINER FREE DRAINING LIQUID POCKET AND NO VAPOUR POCKET IN THE LINE.
B
A
ELEVATION CHANGES ARE CONTINUOUSLY DOWNWARD ONLY
SLOPE
BY PACKAGE VENDOR B NO POCKETS ARE PERMITTED, SPECIFIC SLOPES REQUIRED
ARE SHOWN BY SYMBOL.
BY CONTRACTOR TEMPORARY STRAINER T STRAINER
CP
EP A
XXX CORROSION PROBE ELEVATIONS DOWNSTREAM NEVER EXCEED INLET
CORROSION PROBE
(ELECTRIC RESISTANCE) GRAVITY FLOW B ELEVATIONS. LINE MAY CONTAIN LIQUID POCKETS AND
VAPOUR POCKETS.
H H
LP
CC
CORROSION COUPON XXX CORROSION PROBE VALVES
(LINEAR POLARIZATION)
CHECK VALVE
BUTTERFLY VALVE NORMALLY CLOSED Company logo and business name Project name Company identification
ZUBAIR OIL FIELD 00250600BPFM08030
PLUG VALVE NORMALLY CLOSED DEVELOPMENT PROJECT Job. N
THERMOSTATIC THERMODYNAMIC Contractor logo and business name Contractor identification
L NEEDLE VALVE NORMALLY OPEN L
STEAM TRAP STEAM TRAP
022026-2506-GD-B-08030
EXCESS FLOW VALVE Contract N
Vendor logo and business name Vendor identification
V ANGLE GLOBE VALVE N.A.
N.A.
V 03 Order N N.A.
NOTE 1 FOOT VALVE Facility Name Location Scale Sheet of Sheets
NOTE 1
ZUBAIR FIELD ONSHORE N.A. 4 of 10
VENT DIAPHRAGM VALVE
Document Title
LEGENDA & SYMBOLS Supersedes N.
M DOUBLE BLOCK AND BLEED VALVE WITH VALVE DRAINAGE HOLE Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_04_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
SIGNAL LINES GENERAL INSTRUMENTATION FLOW ELEMENTS (NOTE 2,3) CONTROL VALVES (NOTE 2) FUNCTION SHOW IN BOX
A A
GENERAL NOTES:
I
CONNECTION PROCESS AUXILIARY LOCATION PILOT LIGHT ORIFICE P I/P TRANSDUCER A. ALL INSTRUMENT SYMBOLS ARE IN ACCORDANCE WITH ISA S5.1 AND
ISA S5.3 STANDARDS.
PNEUMATIC SIGNAL 3-WAY GATE VALVE
LOCAL
CONTROL PANEL LOCAL CONTROL PANEL POSITIVE DISPLACEMENT
P
ELECTRIC SIGNAL
XXXX I P/I TRANSDUCER NOTES:
B CHOKE VALVE (MANUAL) B
SYSTEM INTERNAL LINK (SOFTWARE OR DATA LINK) 1. ELECTROMAGNETIC PHENOMENA INCLUDE HEAT, RADIO WAVES, NUCLEAR
IA INSTRUMENT AIR SUPPLY
M MAGNETIC SUM
RADIATION AND LIGHT.
2. ALL FLOW ELEMENTS AND CONTROL VALVES HAVE MINIMUM RATING 300#.
INSTRUMENT CAPILLARY TUBING 3. ALL CONTROL VALVES SHALL BE EQUIPPED WITH CONTINUOS POSITION
TRANSMITTER. 03
DIAPHRAGM SEAL CHOKE VALVE (AUTO) 4. ALL SELF ACTUATED VALVES WITH DN>=3" SHALL BE EQUIPPED WITH LIMIT
HYDRAULIC SIGNAL ULTRASONIC d/dt
DERIVATIVE SWITCHES OPEN AND CLOSED POSITION.
MECHANICAL LINK
RELIEF DEVICES
FI n
INDICATING VARIABLE AREA METER CONTROL VALVE (PFD)
ELECTROMAGNETIC OR SONIC (GUIDED) (NOTE 1) ROOT EXTRACTION
C C
CASE:
ELECTROMAGNETIC OR SONIC (NOT GUIDED) SIZE:
P. SET:
(NOTE 1) PSV VORTEX BALL VALVE (REDUCED BORE)
PRESSURE RELIEF OR SAFETY HIGH SELECTION
VALVE
GENERAL INSTRUMENTATION
VENTURI TUBE GLOBE VALVE
LOW SELECTION
UNIT CODE
TRAIN NUMBER VACUUM RELIEF VALVE
D MEASURED VARIABLE FLOW STRAIGHTENING VANES BUTTERFLY VALVE D
AND FUNCTION DIFFERENCE
SEQUENCE NUMBER
AND SUFFIX
SOLENOID VALVES 03
DIAPHRAGM VALVE
AVG
INSTRUMENT FIELD MOUNTED PSE AVERAGE
S
PRESSURE SAFETY ELEMENT
PLUG VALVE
2-WAY VALVE
INSTRUMENT IN CONTROL ROOM
E NORMALLY ACCESIBLE BY OPERATOR S
E
25 2"
SHARED DISPLAY, CONTROL ON CONTROL
ROOM INACESSIBLE BY OPERATOR
PCV SELF ACTUATED DIFFERENTIAL PRESSURE ACTUATORS 3" 5 WELDOLET OR
REDUCING REGULATOR WITH INTERNAL TEE REDUCING
AND EXTERNAL PRESSURE TAP
G G
DIAPHRAGM
PCV CLOSED END
SHARED DISPLAY/CONTROL ON LOCAL SELF ACTUATED BACK PRESSURE
PANEL (e.g. UCP, LCP) REGULATOR SELF CONTAINED
NORMALLY ACCESIBLE BY OPERATOR
TYPICAL DETAIL "Y" WILL BE USED
DIAPHRAGM (PRESSURE BALANCED)
FOR INJECTION POINT WITH RATING LESS
TYPICAL DETAIL "Z" WILL BE USED
PCV THAN AND EQUAL TO 600#.
FOR INJECTION POINT WITH RATING HIGHER THAN 600#
SHARED DISPLAY, CONTROL ON LOCAL PANEL SELF ACTUATED PRESSURE REGULATOR
(e.g. UCP, LCP), INACESSIBLE BY OPERATOR. SELF CONTAINED
H H
DOUBLE OR IDENTIFICATION LETTERS FUNCTIONS
SINGLE ACTING CYLINDER
XXX SELF ACTUATED PRESSURE REDUCING
PCV FIRST LETTER SUCCEEDING LETTERS
CONTROL VALVE SELF CONTAINED
PROGRAMMABLE LOGIC CONTROL (XXX: ESD.....) WITH HAND WHEEL ADJUSTABLE SET POINT M
NORMALLY ACCESIBLE BY OPERATOR MEASURED OR READOUT OR OUTPUT
MOTOR OPERATED (ELECTRICAL) MODIFIER MODIFIER
INITIATING VARIABLE PASSIVE FUNCTION FUNCTION
A ANALYSIS ALARM
XXX MANUAL B BURNER, COMBUSTION
J PROGRAMMABLE LOGIC CONTROL INACESSIBLE J
C SELF ACTUATED CONTROL
BY OPERATOR (XXX: ESD .....)
D DIFFERENTIAL
SPRING
E VOLTAGE SENSORY (PRIMARY ELEMENT)
F FLOW RATE RATIO (FRACTION)
G GLASS, VIEWING DEVICE
HAND WHEEL
PLC FIELD MOUNTED H HAND HIGH
S
I CURRENT (ELECTRICAL) INDICATE
R J POWER SCAN CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K SOLENOID WITH MANUAL RESET CD-FE 02 21/12/10 ISSUED FOR TENDER A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K
K TIME, TIME SCHEDULE TIME RATE OF CHANGE CONTROL STATION
XXX
CD-FE 01 17/12/10 FINAL ISSUE A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
COMPUTERIZED FUNCTION (XXX: ESD .....) L LEVEL LIGHT LOW
CD-FE 00 22/09/10 ISSUED FOR APPROVAL A.OLIVIERI T.VECCIA U.BARBARESI R.CHIORRINI
IN CONTROL ROOM NORMALLY ACCESSIBLE D
M MOISTURE MOMENTARY MIDDLE, INTERMEDIATE Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
BY OPERATOR Status number Approval Approval
DIGITAL N Revision index
O ORIFICE, RESTRICTION Company logo and business name Project name Company identification
XXX
COMPUTERIZED FUNCTION(XXX: ESD ....) P PRESSURE, VACUUM POINT (TEST) CONNECTION ZUBAIR OIL FIELD 00250600BPFM08030
IN CONTROL ROOM INACESSIBLE BY Q QUANTITY INTEGRATE, TOTALIZE DEVELOPMENT PROJECT Job. N
OPERATOR
ACTUATORS IN POWER FAILURE R RECORD Contractor logo and business name Contractor identification
L L
S SPEED, FREQUENCY SAFETY SWITCH 022026-2506-GD-B-08030
Contract N
T TEMPERATURE TRANSMITTER
FAIL OPEN Vendor logo and business name
MULTIFUNCTION Vendor identification
UNDEFINED INTERLOCK LOGIC U MULTIVARIABLE MULTIFUNCTION MULTIFUNCTION
FO N.A. N.A.
V VIBRATION VALVE, DAMPER, LOUVRE
Order N N.A.
W WEIGHT, FORCE WELL Facility Name Location Scale Sheet of Sheets
FAIL CLOSED ZUBAIR FIELD
X DANGER X AXIS FAULT ONSHORE N.A. 5 of 10
FC
Y EVENT, STATE OR PRESENCE Y AXIS RELAY, COMPUTE, CONVERT Document Title
LEGENDA & SYMBOLS Supersedes N.
M FAIL LOCKED (ON POSITION) Z POSITION, DIMENSION Z AXIS
DRIVER, ACTUATOR, FINAL Superseded by N. M
CONTROL ELEMENT Plant Area Plant Unit
P&I DIAGRAM
FLP N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_05_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
FLOW ORIFICE WITH DB&B FLOW ORIFICE WITH SB&B LEVEL INSTRUMENTATION WITH BRIDLE LEVEL INSTRUMENTATION WITH SB&B GENERAL NOTES:
A. ALL INSTRUMENT SYMBOLS ARE IN ACCORDANCE WITH ISA S5.1 AND ISA S5.3 STANDARDS.
A B. REFER TO ISOLATIN PHILOSOPHY DOCUMENT NUMBER "00250600FFRB08023". A
FIT FIT
NOTES:
VESSEL
VESSEL
LG LIT LIT 1. ROUTING TO CLOSED OR COLD DRAIN DEPENDING ON SERVICE.
B 2. IF INSTRUMENT IS USED FOR ESD ISOLATION VALVES SHALL BE CAR-SEAL-OPEN (CSO). B
3. INSTRUMENT VENT VALVE SHALL NOT BE SHOWN ON P&ID'S.
4. FOR LIQUID CONTAINING SOLIDS IN SUSPENSION ORIFICE PLATE SHALL BE SEGMENTAL BORE TYPE.
5. LEVEL GAUGE SHALL BE MAGNETIC TYPE.
TYPICAL PROCESS CONNECTION TYPICAL PROCESS CONNECTION TYPICAL PROCESS CONNECTION TYPICAL PROCESS CONNECTION
C C
FIT FIT 3/4" V 3/4" V 3/4" V 3/4"
2"x3/4"
NOTE 3 NOTE 3 NOTE 3 NOTE 3 4"x2" NOTE 2
INSTRUMENT INSTRUMENT 3" 2"
PIPING PIPING
NOTE 2 NOTE 2 NOTE 2 NOTE 2
2"
PIPING
INSTR.
2"
INSTRUMENT
INSTRUMENT
3/4 "
D 3/4 3/4
" " 3/4 D
PIPING
VESSEL
VESSEL
PIPING
" LG LIT LIT
NOTE 5 4"
2"
2" NOTE 2
FE FE 3" 2"
(MIN. RATING 300#) (MIN. RATING 300#)
PIPING
INSTR.
4"x2"
2"x1"
INSTR. INSTR. INSTR.
E PIPING PIPING PIPING E
3/4" 1" 3/4" 3/4"
FLOW INSTRUMENT DETAIL NOTE 1 NOTE 1
2" 2"
VALVE ORIENTATION DEPENDANT ON FLUID AND PIPERUN TO CLOSED DRAIN TO CLOSED DRAIN
(MIN. RATING 300#) (MIN. RATING 300#)
F F
GAS LIQUID
(NOTE 4)
G G
LEVEL INSTRUMENTATION WITH DB&B PRESSURE INSTRUMENT WITH DB&B PRESSURE INSTRUMENT WITH SB&B TEMPERATURE INSTRUMENT
LIT
J J
TIT TW
PIT PIT
3/4"
TE
PIPING INSTR. NOTE 3 NOTE 3 CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K CD-FE 02 21/12/10 ISSUED FOR TENDER A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K
3/4" V
INSTR. INSTR.
CD-FE 01 17/12/10 FINAL ISSUE A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
2" 2" PIPING PIPING
3/4" NOTE 2 3/4" NOTE 2 INSTR. CD-FE 00 22/09/10 ISSUED FOR APPROVAL A.OLIVIERI T.VECCIA U.BARBARESI R.CHIORRINI
1-1/2"
PIPING Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
NOTE 2 NOTE 2 Status number Approval Approval
Revision index
LIT PIPING PIPING PIPING
Company logo and business name Project name Company identification
ZUBAIR OIL FIELD
VESSEL
00250600BPFM08030
PIPING INSTR. PIT PIT DEVELOPMENT PROJECT Job. N
TIT TW
Contractor logo and business name Contractor identification
L 2" 2" L
NOTE 3 NOTE 3 TE 022026-2506-GD-B-08030
NOTE 2 NOTE 2 Contract N
INSTR. INSTR.
3/4" V INSTR. Vendor logo and business name Vendor identification
PIPING PIPING
PIPING 2" NOTE 2 2" NOTE 2 N.A.
3/4"
INSTR.
N.A.
PIPING 2" Order N N.A.
2" NOTE 1 Facility Name Location Scale Sheet of Sheets
VESSEL VESSEL ZUBAIR FIELD
VESSEL
ONSHORE N.A. 6 of 10
TO CLOSED DRAIN
(MIN. RATING 300#) (MIN. RATING 300#) (MIN. RATING 300#) Document Title
(MIN. RATING 300#) LEGENDA & SYMBOLS Supersedes N.
M Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_06_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
DETAIL A - ESD VALVE WITH LOCAL PARTIAL STROKE TEST AND LOCAL RESET DETAIL B - ESD VALVE WITH LOCAL RESET DETAIL C - BDV VALVE WITH LOCAL RESET NOTES:
A 1. VALVE RESET MUST ALWAYS BE ACCOMPLISHED LOCALLY AND MANUALLY. MEANS SHALL BE PROVIDED TO ENABLE
A
THE TESTING OF THE DELUGE VALVE WITHOUT DISCHARGING FIRE WATER THROUGH THE PIPE-WORK AND
NOZZLES. ADDITIONAL BLIND FLANGE CONNECTION ON DISCHARGE PIPING SHALL BE ADDED TO PERFORM REAL
P&ID REPRESENTATION P&ID REPRESENTATION P&ID REPRESENTATION DISCHARGING TEST.
SDV
+
SDV
+
BDV
+
B B
FC FC FO
03
HS-R RESET AIR
CMD SUSTAIN
03
HS-T
START
TEST
C TEST START ESD CMD 03 03 C
HS-C I 03 03
PUSH ESD ESD
BUTTON XYSA HSL
XYSA HSH
S
I S
I
CLOSED OPEN
YA-T
03
TEST
03 FAILURE
XYSA IA ATM IA ATM
S
HS-R HS-R
RESET CMD RESET CMD
IA ATM 03 R R
HSL CLOSED 03 03
CMD
XYSB 03 XYSB 03 XYSB
R S S S
D 03 D
ATM ATM ATM
03
03
R
03 R R
XYSP
ATM 03
S
03
F ZLX
TEST L.S. F
POSITION
DETAIL P - ESD VALVE WITH TOTAL STROKE TEST AND LOCAL RESET DETAIL X - ESD VALVE WITH REMOTE PARTIAL STROKE TEST DETAIL R - PNEUMATIC VALVE DCS CONTROLLED
SDV SDV
+ UV
+ +
FC
H 03 H
HS-R RESET
03 XL-G TEST SELECTED CMD
FROM LOCAL
03
HS-T
START
TEST
XYSA ESD CMD
I
S
03
OPEN ESD START TEST
HSH I HS-T IA ATM YA-T TEST
J J
FAILURE
DETAIL D - MOTOR OPERATED VALVE DETAIL E - MOTOR OPERATED VALVE (UCP CONTROLLED) DETAIL H - MOTOR OPERATED VALVE (UCP CONTROLLED) WITH POSITION INDICATION DETAIL L - MOTOR OPERATED VALVE WITH POSITION INDICATION
A A
LOC/REM
YLR
03 LOC/REM
YLR
DISCREPANCY OPEN CLOSE AUTO/MAN CLOSED OPENED STOP POSITION FAULT LOC/REM
DISCREPANCY OPEN CLOSE AUTO/MAN OPEN CLOSED FAULT LOC/REM YA-D HSH HSL HS-A ZLL ZLH HSS ZI YA-F YLR
C HSH C
HSH HSH YA-D HSH HSL HS-A ZLH ZLL YA-F YLR OPEN
HSH
OPEN OPEN
OPEN 03 03
03 03 HSL
CLOSE
HSL
HSL HSL CLOSE
CLOSE HSS
CLOSE STOP
HSS
03 STOP
FAULT OPEN
HSS YA-F HSLR
HSH UPC OPEN
D 03 FAULT D
HSH YA-F
STOP LOC/REM
UPC CLOSE
HSL CLOSE MOV
+
HSLR
ZIT HSL
M
STOP
LOCAL/REMOTE HSS
ZSH STOP
MOV
+
ZSH HSS 03
LOC/REM
M M OPEN DISCREPANCY
HSLR LOC/REM ZSH ZLH
ZSL M YA-D
HSLR
E ZSL E
CLOSED
ZSL ZLL
OPEN 03
ZSH ZLH
MOV
DISCREPANCY +
MOV POSITION
YA-D +
ZIT ZI
ZSL ZLL
CLOSED
F F
FIRE E SAFETY DETAIL F - DELUGE VALVE WITH AIR DETAIL G - DELUGE VALVE WITH WATER
P&ID REPRESENTATION
SQV SQV
+
FIRE HYDRANT 2-WAY +
H H
FOAM CHAMBER
SPRINKLER NOZZLE ESD F&G ESD F&G
I XYS I XYS
XSH XS XSH XS
HOSE REEL
WATER SPRAY NOZZLE 03
03
S SQY
S
FIRE MONITOR
J MIXER FOR PREMIXER
IA ATM WATER ATM J
FOAM PROPORTIONER
S S
FIRE MONITOR ELEVATED SQY
ATM ATM
NOZZLE AND FOAM CHAMBER
FOR FIXED ROOF TANKS
SQY SQY
FIRE MONITOR REMOTE OPERATED PSH
PSH
NOZZLE AND FOAM SHEDDER
SQV SQV CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
FOR FLOATING ROOF TANKS +
K +
CLEAN AGENT NOZZLE Vendor logo and business name Vendor identification
N.A. N.A.
Order N N.A.
EYE WASH CO2 NOZZLE Facility Name Location Scale Sheet of Sheets
ZUBAIR FIELD
ONSHORE N.A. 8 of 10
Document Title
LEGENDA & SYMBOLS Supersedes N.
M Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_08_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
DETAIL I - MOTOR (AUTO MANUAL CONTROLLED) WITH TRIP COMING FROM ESD DETAIL M - MOTOR WITH TRIP COMING FROM ESD DETAIL N - UCP MOTOR WITH TRIP COMING FROM ESD
A A
START
HSH 03 HSH HSH
HSH
START START
START
HSL HSL
STOP HSL
03 HSL
C STOP STOP C
STOP
HSLR HSLR
HSLR
03 LOC/REM LOC/REM
LOC/REM
ESD 03 ESD
I
MCC M I
MCC M MCC M
XS XS
03 UNAVAILABLE
YAU
YAU YAU
D UNAVAILABLE UNAVAILABLE D
FAULT
YA-F
START 03 03
HSH YA-F 03 YA-F START
03 HSH 03
FAULT FAULT
03 CURRENT
YII
03 03
UPC ABSORPTION
STOP YL-R
03 HSL YL-R STOP
RUNNING/ RUNNING/ HSL
STOPPED STOPPED RUNNING/
YII YL-R STOPPED
CURRENT
AUTO/MAN INDICATION NOTE 3 03
03 HS-A YLR ENCS YLR
TRIP/
E LOC/REM LOC/REM YXA ACTIVATED
E
YXA ESD
YII TRIP/
CURRENT ACTIVATED I
INDICATION LOC/REM
XS-E YLR
ENCS
YXA
TRIP/
ACTIVATED 03
F F
DETAIL T - VARIABLE SPEED MOTOR CONTROLLED BY DCS DETAIL U - VARIABLE SPEED MOTOR CONTROLLED BY DCS THROUH UCP
HSH HSH
START START
HSL HSL
STOP STOP
J J
HSLR HSLR
LOC/REM LOC/REM
START
HSH
03 HCS HCS
SPEED SET POINT SPEED SET POINT
STOP START
03 HSL HSH
VSD M VSD M
SPEED UNAVAILABLE CF-DE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K SET POINT
YAU
STOP UNAVAILABLE CF-DE 02 21/12/10 ISSUED FOR TENDER A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K
03 SIC HSL UPC YAU
CF-DE 01 17/12/10 FINAL ISSUE A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
FAULT CF-DE 00 22/09/10 ISSUED FOR APPROVAL A.OLIVIERI T.VECCIA U.BARBARESI R.CHIORRINI
YA-F
SPEED FAULT Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
YA-F Status number Approval Approval
SIC SET POINT 03 Revision index
CURRENT ABSORPTION
YII ESD Company logo and business name Project name Company identification
I CURRENT ABSORPTION
YII ZUBAIR OIL FIELD 00250600BPFM08030
DEVELOPMENT PROJECT Job. N
RUNNING/STOPPED
YL-R
RUNNING/STOPPED Contractor logo and business name Contractor identification
L 03 YL L
03 022026-2506-GD-B-08030
LOC/REM Contract N
YLR
LOC/REM Vendor logo and business name
YLR Vendor identification
N.A. N.A.
03 SPEED
YI-S 03 Order N N.A.
INDICATION SPEED
YSI Facility Name Location Scale Sheet of Sheets
ZUBAIR FIELD ONSHORE N.A. 9 of 10
Document Title Supersedes N.
M LEGENDA & SYMBOLS Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_09_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
B B
TYPE "A" TYPE "B"
SC SC
STAINLESS STEEL
PROCESS SPEC.
NOTE 1,2,3
1" 1"x3/4"
PROCESS LINE/
C EQUIPMENT
C
FROM D 3/4"
BOTTOM
2"x3/4"
D 4"x2" D
1"x3/4"
TI
STAINLESS STEEL
PI
DRAIN SPEC.
3/4" 1"
4"x2"
2"x3/4"
PIPING 3/4" TO COLD / CLOSE DRAIN
E TUBING
3/4" E
SAMPLE BOTTLE
300mm (VERTICAL)
D
3/4"
OPEN DRAIN
F F
FOR GAS SAMPLES FOR LIQUID SAMPLES BELOW 60°C WITH ATM BOILING TEMPERATURE BELOW SAMPLE TEMPERATURE
H H
TO BURN PIT /
TO FLARE HEADER/ TO FLARE HEADER /
BURN PIT TO COLD / CLOSED DRAIN