EQUIPMENT IDENTIFICATION FLUID CODE LINE IDENTIFICATION GENERAL NOTES:


A A. EQUIPMENT ELEVATION ABOVE GRADE IS MINIMUM EXCEPT WHERE OTHERWISE INDICATED.
A
B. PROVIDE VALVE DRAINS AT THE LINE LOWEST POINTS AND VALVED VENTS AT THE LINEHIGHEST POINTS.
C. CD LINES WHICH ARE CONNECTED TO THE CLOSED DRAIN NETWORK SHALL BE SLOPED, NO POCKET LINES.
OILS DISCHARGE FLUID D. SY LINES WHICH ARE CONNECTED TO THE OPEN DRAIN NETWORK, SHALL BE SLOPED, NO POCKET LINES.
MAX OPERATING TEMPERATURE °C
E. WATER LINES, FUEL GAS LINES, NITROGEN LINE FROM HEADER TO USERS SHALL BE TAKEN FROM THE
CO= CRUDE OIL SG= SLUGE UPPER SIDEOF THE RELEVANT DISTRIBUTION HEADER.
XX-NNN-N-AA-NNN-A DO= DRY OIL DH= OPEN DRAINS 20.0 01 200 3 CO 002 10" 11A N F. SAMPLE CONNECTIONS SHALL BE TAKEN FROM THE UPPER LINES SIDE OF THE PROCESS LINES.
FO= FUEL OIL WY= DRAINAGES 12.00 G. ALL NETWORK DRAIN PIPES SHALL BE FULLY RODABLE. ISOLATION VALVES SHALL BE FULL BORE TO
REDUNDANCY INSULATING PAINTING DESIGNATION
GO= GAS OIL CY= ACID SEWAGES FACILITATE RODDING. THE LOCATION AND NUMBER OF RODDING POINTS SHALL BE DEFINED DURUNG
SEQUENTIAL NUMBER PIPING SPECIFICATION
HO= HOT OIL CD= CLOSED DRAIN DETAILED DESIGN.
EQUIPMENT CODE (NOTE 1) LINE SIZE
B LO= LUBE OIL HP= HIGH PRESSURE FLARE H. ALL VALVES AND FITTING CONNECTIONS ARE AS PER APPLICABLE LINE SPECIFICATION. B
TRAIN No. LINE SEQUENCE NUMBER
OO= OIL (GENERAL) LP= LOW PRESSURE FLARE I. ALL THE BY-PASS VALVES SHALL BE SELF DRAINING FROM BOTH SIDES OF THE BY-PASS VALVE.
FACILITY UNIT CODE (NOTE 2) FLUID CODE
TO= TREATED OIL SL= SLURRY (SAND) L. FOR INSTRUMENT ISOLATION VALVES, VENTS AND DRAINS REFER TO "ISOLATION PHILOSOPHY"
SUB FACILITY CODE TRAIN No.
WO= WET OIL AP= ATMOSPHERIC PRESSURE FLARE SPEC. n° 00250600FPRB08023.
FACILITY UNIT CODE
FC= COLD FLARE
SUB FACILITY CODE
LD= COLD CLOSED DRAIN
RD= REFRIGERANT DRAIN
DESIGN PRESSURE barg
GD= GLYCOL CLOSED DRAIN
GAS TS= TREATED SEWAGE
NOTES:
HG= HIGH PRESSURE GAS
1. FOR EQUIPMENT CODE REFER TO ENI COMPANY SPECIFICATION, ITEM NUMBERING DOCUMENT 20198.C00.GEN.SDS.
MG= MEDIUM PRESSURE GAS
2. FOR FACILITY FUNCTION UNIT CODE REFER TO ENI COMPANY SPECIFICATION, ITEM NUMBERING DOCUMENT
LG= LOW PRESSURE GAS
C AG= ATMOSPHERE GAS
20198.C00.GEN.SDS. C
IG= INSTRUMENT GAS CHEMICAL
NG= NATURAL GAS
INSULATION DESIGNATION PG= PURGE GAS CH= MISCELLANEOUS CHEMICAL ABBREVIATIONS
RG= RAW GAS GY= GLYCOL
TG= TREATED GAS ML= METHANOL
FG=FUEL GAS GM= WATER AND GLYCOL
BG= BLANKETING GAS CS=CAUSTIC SODA
AG= ABOVE GROUND
GG= GAS (GENERAL) A/S= AIR SIGNAL LEGENDA:
ME= METHANE GAS AT= GAS DETECTOR
PR= PROPANE GAS ASV= ANTISURGE VALVE
A= INTERNALLY TREATED AND EXTERNALLY COATED PY= GENERIC PROCESS GAS HC FLUID 03 MAX OPERATING TEMPERATURE °C
ATM= ATMOSPHERIC PRESSURE
D B= EXTERNAL COATING ONLY BL= BATTERY LIMIT DESIGN PRESSURE barg D
E= LINE WITH ELECTRIC TRACING BMS= BURNER MANAGEMENT SYSTEM
FOAM
F= COLD INSULATED LINE BS&W= BASIC SEDIMENT & WATER
03
I= HOT INSULATED LINE BT=FLAME DETECTOR
FF= FIRE-FIGHTING FOAM
G= ZINC PLATED LINE CO= CLEAN OUT
FL= FOAMING LIQUID
P= PERSONNEL PROTECTION CONN= CONNECTION
N= NOT PAINTED AND NOT INSULATED WATER CP= CONCRETE PIPE
S= INTERNALLY TREATED AND EXTERNALLY PAINTED CS= CARBON STEEL
T= TRACED WITH HOT EXTERNAL FLUID DW= DRINKING WATER CSC = CAR SEAL CLOSED
U= TRACED WITH HOT INTERNAL FLUID FW= FIRE-FIGHTING WATER CSO= CAR SEAL OPEN
V= EXTERNAL PAINTING ONLY HW=HOT WATER LIQUID PRODUCT DC= DRAIN CONNECTION
W= JACKET (INTERNAL PIPING) GW= IRRIGATION WATER DCS= DISTRIBUTED CONTROL SYSTEM
03
E PW=PRODUCED WATER GL=GASOLINE DES= DESIGN E
RW= RAW WATER PL= LIQUEFIED PETROLEUM GAS DIFF= DIFFERENTIAL
SW= SEA WATER NL= NATURAL LIQUID GAS DISCH= DISCHARGE
TW= TREATED WATER ELEV= ELEVATION
BW= BOILER FEED WATER ELL= ELBOW
NOTE: FOR INSULATION LINE AND SYMBOL REFER TO SHEET 4 IW= SERVICE WATER EW= EYE WASH
WW= WATER (GENERAL) ESD= EMERGENCY SHUTDOWN
CW= COOLING WATER ESP= ELECTRICAL SUBMERSIBLE PUMP
WI= INJECTION WATER FB= FULL BORE
NW= DEMINERALISED WATER FC= FAIL CLOSED
YW=SANITARY WATER FFD= FAILURE FLOW DIRECTION
FFF= FLAT FACE FLANGE
F/F= FLANGE TO FLANGE
F FLG= FLANGE F
FLC= FAIL LOCKED (DRIFT CLOSED)
EQUIPMENT CODE REFRIGERATING MEDIUM
FLO= FAIL LOCKED (DRIFT OPEN)
FLP= FAIL LAST POSITION
FO= FAIL OPEN
GR= REFRIGERATING GAS FV= FULL VACUUM
LR= REFRIGERATING LIQUID GDU= GAS DEHYDRATION UNIT
OW= OILY WATER GWR= GUIDE WAVE RADAR
NW= DEMINERALIZED WATER 03
HD= HUB DRAIN
HH= HANDHOLE
HIL= HIGH INTERFACE LEVEL
HLL= HIGH LIQUID LEVEL
G CA= REGENERATIVE FILTER HHLL= HIGH HIGH LIQUID LEVEL G
CL=CARTRIDGE FILTER UTILITIES FLUID HOA= HAND OFF AUTOMATIC
CM= SAND FILTER "DUAL MEDIA FILTER" HOR= HORIZONTAL
CQ= COALESCENCE FILTER AND SEPARATOR AA=AIR (GENERAL) HP= HIGH POINT
CZ= MISCELLANEOUS MECHANICAL EQUIPMENT CA=COMPRESSOR AIR HPP=HIGH POINT OF PAVING
FA= DIRECT FIRED HEATER IA= INSTRUMENT AIR HPV= HIGH POINT VENT
FK= STACK/VENT UA= UTILITIES AIR ILV= INTERLOCKED VALVE
HA= EXCHANGER SHELL & TUBE UN= UTILITIES NITROGEN INSUL= INSULATION
HB= PLATE EXCHANGER SHELL UW= UTILITY WATER LC= LOCK CLOSED
HC= AIR COOLER EXCHANGER LIL= LOW INTERFACE LEVEL
HM= ELECTRC EXCHANGER (NOT SANITARY) LIP= LOCKED IN POSITION
03 HN= ELECTRIC HEATER LLL= LOW LIQUID LEVEL
HW= WASTE HEAT RECOVERY UNIT LLLL= LOW LOW LIQUID LEVEL
H JM= METERING AND PROVING EQUIPMENT H
LO= LOCK OPEN
KA= CENTRIFUGAL COMPRESSOR LP= LOW PRESSURE
KB= RECIPROCATING COMPRESSOR LPD= LOW POINT DRAIN
KE= FAN LRE= LONG RADIUS ELBOW
MT= GAS TURBINE MAX= MAXIMUM
PA= CANTRIFUGAL PUMP MCC= MOTOR CONTROL CENTER
PB= RECIPROCATING PUMP MH= MANHOLE
PD= METERING PUMP MIN= MINIMUM
PH= SUBMERSIBLE PUMP WITH EXTERNAL DRIVER MW= MANWAY
TA= ATMOSPHERIC STORAGE TANK (FIXED ROOF) NB= NOMINAL BORE
TB= ATMOSPHERIC STORAGE TANK (FLOATING ROOF) NC= NORMALLY CLOSED
TD= SPHERICAL OR SPHEROID TANK NIL=NORMAL INTERFACE LEVEL
J VA= HORIZONTAL/VERTICAL PRESSURE VESSEL NLL= NORMAL LIQUID LEVEL J
VB= EXPANSION TANK, EXPANSION VESSEL, DAMPER NNF= NORMALLY NO FLOW
VD= GAS BOOT NO= NORMALLY OPEN
VE= COLUMN ODB= OPEN DRAIN BASIN
VL= LAUNCHING TRAP OP= OPERATING
VN= KNOCK OUT DRUM, SCRUBBER PC= PURGE CONNECTION
03 VP= TEST SEPARATOR PLC= PROGRAMMABLE LOGIC CONTROL
VQ= SLUG CATCHER PSD= PROCESS SHUTDOWN
VR= RECEIVING TRAP PSE= PRESSURE SAFETY ELEMENT
VS= PRODUCTION SEPARATOR RFF= RAISED FACE FLANGE
VU= DESALTED, ELECTROSTATIC SEPARATOR RO= RESTRICTION ORIFICE
XX= PACKAGE (INCLUDING INDENTIFIED ITEMS) RS= REMOVABLE SPOOL CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K SC= SAMPLE CONNECTION
CD-FE 02 T.VECCIA
K
SDV= SHUT-DOWN VALVE 21/12/10 ISSUED FOR TENDER A.OLIVIERI C.MARZI R.CHIORRINI
SG= SPECIFIC GRAVITY CD-FE 01 17/12/10 FINAL ISSUE A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
SP= SET POINT CD-FE 00 22/09/10 ISSUED FOR APPROVAL A.OLIVIERI T.VECCIA U.BARBARESI R.CHIORRINI
SS= STAINLESS STEEL Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
STD= STANDARD Status number Approval Approval
T= TEMPORARY Revision index
TL= TANGENT LINE
Company logo and business name Project name Company identification
TSO= TIGHT SHUT OFF
T/T= TANGENT TO TANGENT ZUBAIR OIL FIELD 00250600BPFM08030
TYP= TYPICAL DEVELOPMENT PROJECT Job. N
UC= UTILITY CONNECTION
UCP= UNIT CONTROL PANEL (PACKAGE EQUIPMENT) Contractor logo and business name Contractor identification
L UG= UNDERGROUND
L
022026-2506-GD-B-08030
US= UTILITY STATION Contract N
V= VENDOR SUPPLIED
VAC= VACUUM Vendor logo and business name Vendor identification
VC= VENT CONNECTION N.A.
VSD= VARIABLE SPEED DRIVER N.A.
WF= WELL FLUID Order N N.A.
WO= WASHOUT CONNECTION Facility Name Location Scale Sheet of Sheets
ZUBAIR FIELD ONSHORE N.A. 1 of 10
Document Title
LEGENDA & SYMBOLS Supersedes N.
M Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_01_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

PROCESS FLOW DIAGRAM AND PIPING AND INSTRUMENTATION DIAGRAMS


A A

WELLS PUMPS COMPRESSOR AND FAN FILTERS EXCHANGERS FLARE SYSTEM

HEAT EXCHANGER (ONE PASS)


F FILTER
CENTRIFUGAL PUMP (P&ID) CENTRIFUGAL COMPRESSOR
(GENERAL SYMBOL PFD)
B B

VENT ( PFD )
ACTIVE CARBON HEAT EXCHANGER (TWO PASS)
SINGLE ROTARY COMPRESSOR RECOVERY BASKET FILTER
COMPLETION CENTRIFUGAL PUMP (PFD)
WELL HEAD

C REBOILER KETTLE TYPE C


AXIAL COMPRESSOR
METERING PUMP VERTICAL CARTRIDGE FILTER

RECIPROCATING COMPRESSOR PLATE HEAT EXCHANGER

HEATERS A RECIPROCATING PUMP


D VENT D
HORIZONTAL
CARTRIDGE FILTER

SHELL AND TUBE


SCREW COMPRESSOR HEAT EXCHANGER
FURNACE PISTON PUMP

E DUPLEX FILTER ELECTRIC HEATER E


FAN (GENERAL)

ROTARY/GEAR PUMP TYPE 1

HIGH EFFICIENCY AIR FILTER


EXCHANGER DATA TABLE FLARE
F DESIGN DUTY kW 0.0 F
DESIGN/OPERATING PRES. SHELL SIDE barg 0.000 / 0.000
ROTARY/GEAR PUMP TYPE 2 DESIGN/OPERATING TEMP. SHELL SIDE C° 0.0 / 0.0
DESIGN/OPERATING PRES. TUBE SIDE barg 0.000 / 0.000
WASTE HEAT RECOVERY UNIT DESIGN/OPERATING TEMP. TUBE SIDE C° 0.0 / 0.0
GRAVEL BOX (PFD) MATERIAL OF CONSTRUCTION X
INSULATION YES/NO YES / NO
TRIM No. XXX.XX.XXX.XXX.X

G
SCREW PUMP LIQUID/LIQUID DRYER G
COALESCER

HEATER DATA TABLE


DESIGN DUTY kW 0.0
DESIGN/OPERATING PRES. barg 0.000 / 0.000 FLARE (PFD)
DESIGN/OPERATING TEMP. C° 0.0 / 0.0
MATERIAL OF CONSTRUCTION X ADSORBER DRYER
INSULATION YES/NO YES / NO
TRIM No. XXX.XX.XXX.XXX.X M GAS/LIQUID COALESCER
VERTICAL SUBMERSIBLE
CENTRIFUGAL PUMP
H (EXTERNAL MOTOR) H

MEMBRANE

GROUND FLARE (PFD)


M BARREL PUMP COMPRESSOR DATA TABLE DRYER DATA TABLE
DESIGN FLOW RATE m3/hr 0.000 FILTER DATA TABLE DESIGN AIR FLOW Nm/hr 0.000
SUCTION PRESSURE barg 0.000 DESIGN FLOW RATE m3/hr 0.0 DEW POINT C° 0.0
J DIFFERENTIAL PRESSURE bar 0.000 DESIGN/OPERATING PRES. barg 0.000 / 0.000 DESIGN/OPERATING PRES. barg 0.000 / 0.000
J
DRIVER POWER kW 0.0 DESIGN/OPERATING TEMP. C° 0.0 / 0.0 DESIGN/OPERATING TEMP. C° 0.0 / 0.0
MATERIAL OF CONSTRUCTION X MATERIAL OF CONSTRUCTION X MATERIAL OF CONSTRUCTION X
INSULATION YES/NO YES / NO INSULATION YES/NO YES / NO INSULATION YES/NO YES / NO
TRIM No. XXX.XX.XXX.XXX.X TRIM No. XXX.XX.XXX.XXX.X TRIM No. XXX.XX.XXX.XXX.X

BURNING PIT
COOLERS AGITATOR / MIXERS
SUBMERSIBLE PUMP CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A. OLIVIERI T.VECCIA C. MARZI R.CHIORRINI
K (SUBMESERSED MOTOR)
CD-FE 02 21/12/10 ISSUED FOR TENDER A. OLIVIERI T.VECCIA C. MARZI R.CHIORRINI
K
CD-FE 01 17/12/10 FINAL ISSUE A. OLIVIERI T.VECCIA C. MARZI R.CHIORRINI
M AIR COOLER CD-FE 00 22/09/10 ISSUED FOR APPROVAL A. OLIVIERI T.VECCIA C. MARZI R.CHIORRINI
Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
Status number Approval Approval
Revision index

AIR COOLER Company logo and business name Project name Company identification
AGITATOR/MIXER
WITH LOUVRES ZUBAIR OIL FIELD 00250600BPFM08030
DEVELOPMENT PROJECT Job. N
DIAPHRAGM PUMP
Contractor logo and business name Contractor identification
L AIR COOLER L
WITH ACTUATED 022026-2506-GD-B-08030
LOCK GATE Contract N
Vendor logo and business name Vendor identification
N.A. N.A.
PUMP DATA TABLE Order N N.A.
DESIGN FLOW RATE m3/hr 0.000 Facility Name Location Scale Sheet of Sheets
SUCTION PRESSURE barg 0.000
DIFFERENTIAL PRESSURE bar 0.000
ZUBAIR FIELD ONSHORE N.A. 2 of 10
DRIVER POWER kW 0.0
MATERIAL OF CONSTRUCTION X AGITATOR/MIXER DATA TABLE Document Title
LEGENDA & SYMBOLS Supersedes N.
M INSULATION YES/NO YES / NO DRIVER POWER kW 0.0 Superseded by N. M
TRIM No. XXX.XX.XXX.XXX.X MATERIAL OF CONSTRUCTION X
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_02_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

EQUIPMENT COMPONENTS TANKS VESSELS MISCELLANEOUS


A A

CONED ROOF TANK

OPEN DRAIN SUMP


PIT / EVAPORATION POND (PFD)
HORIZONTAL VESSEL

B B

BUTTWELDED NOZZLE
FLANGED NOZZLE
FLANGED NOZZLE
WITH BLIND
ATMOSPHERIC TANK
INTERNAL NOZZLE
INSTRUMENT CONNECTION
C C
MANWAY PIT DATA TABLE
HORIZONTAL VESSEL WITH POT DIMENSION m 0/0/0
MANWAY VOLUME m3 0
DESIGN OPERATING PRESSURE barg 0.000 / 0.000
DESIGN OPERATING TEMPERATURE C° 0.0 / 0.0
MATERIAL OF CONSTRUCTION X
HAND HOLE INSULATION YES/NO YES / NO

TRAY-GENERAL
DOME ROOF TANK

D BUBBLE CAP TRAY D


CENTRAL SEAL PAN OIL SKIMMER

SIEVE TRAY

VALVE TRAY

VANE PACK

LIQUID SPRAY FLOATING ROOF TANK HORIZONTAL VESSEL WITH WEIR


E E
HALF OPEN PIPE

TOTAL DRAW-OFF TRAP WITH CONCENTRIC REDUCER TRAP WITH ECCENTRIC REDUCER
TRAY
SWIRL DECK

REDISTRIBUTION
LIQUID/LIQUID

F OPEN TOP TANK F


REDISTRIBUTION
GAS LIQUID INJECTION

WIRE MESH
HORIZONTAL DATA TABLE
INTERNAL DIAMETER mm 0 RECEIVING/LAUNCHING TRAP DATA TABLE
SCHOEPENTOETER LENGHT (T to T) mm 0 BARREL DIAMETERS INCH. 0.0 / 00
DESIGN OPERATING PRESSURE barg 0.000/0.000 LENGHT mm 0.0
DESIGN OPERATING TEMP. C° 0.0 / 0.0 DESIGN OPERATING PRESSURE barg 0.0 / 0.0
G MATERIAL OF CONSTRUCTION X DESIGN OPERATING TEMPERATURE C° 0.000 / 0.000 G
TANK WITH SKIMMER INSULATION YES/NO YES / NO MATERIAL OF CONSTRUCTION X
INSULATION TRIM No. XXX.XX.XXX.XXX.X INSULATION YES/NO YES / NO
TRIM No. XXX.XX.XXX.XXX.X

VERTICAL VESSEL
REDISTRIBUTION SLUG CATCHER FINGER TYPE
H GAS LIQUID INJECTION H

SEDIMENTATION TANK
VORTEX BREAKER

J J

SPHERICAL PRESSURE STORAGE TANK VERTICAL VESSEL DATA TABLE


DRIVERS MIXER, EJECTOR INTERNAL DIAMETER mm 0
LENGTH (T to T) mm 0
DESIGN OPERATING PRESSURE barg 0.000 / 0.000 CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K CD-FE 02 T.VECCIA
K
DESIGN OPERATING TEMP. C° 0.0 / 0.0 21/12/10 ISSUED FOR TENDER A.OLIVIERI C.MARZI R.CHIORRINI
MATERIAL OF CONSTRUCTION X CD-FE 01 17/12/10 FINAL ISSUE A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
A AIR MOTOR INSULATION YES/NO YES / NO CD-FE 00 22/09/10 ISSUED FOR APPROVAL A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
GENERIC MIXER TRIM No. XXX.XX.XXX.XXX.X
Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
Status number Approval Approval
SLUG CATCHER FINGER TYPE DATA TABLE Revision index

IFINGER NUMBER AND ID n°Xinch 0X0 Company logo and business name Project name Company identification
FINGERS LENGHT m 0 ZUBAIR OIL FIELD 00250600BPFM08030
DESIGN OPERATING PRESSURE barg 0.000 / 0.000 DEVELOPMENT PROJECT Job. N
DESIGN OPERATING TEMP. C° 0.0 / 0.0
M ELECTRIC MOTOR PROPELLER MIXER MATERIAL OF CONSTRUCTION X Contractor logo and business name Contractor identification
L INSULATION YES/NO YES / NO L
022026-2506-GD-B-08030
TRIM No. XXX.XX.XXX.XXX.X
TANK DATA TABLE Contract N
NOMINAL CAPACITY m3 0 Vendor logo and business name Vendor identification
WORKING CAPACITY m3 0
N.A. N.A.
DESIGN OPERATING PRESSURE barg 0.000/0.000
DESIGN OPERATING TEMP. C° 0.000/0.000 Order N N.A.
EJECTOR INTERNAL DIAMETER mm 0 Facility Name Location Scale Sheet of Sheets
GAS TURBINE HEIGHT mm 0 ZUBAIR FIELD
MATERIAL OF CONSTRUCTION X ONSHORE N.A. 3 of 10
INSULATION YES/NO YES / NO
Document Title
TRIM No. XXX.XX.XXX.XXX.X LEGENDA & SYMBOLS Supersedes N.
M Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_03_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

LINE TYPES PIPING COMPONENTS OFF DRAWING CONTINUATION

A NOTES: A
PRIMARY PIPING END CAPPED AND
END CAP 1. ALL VENTS AND DRAINS ARE SIZE 3/4" IF NOT OTHERWISE INDICATED.
BUTT WELDED
DRAIN

SECONDARY PIPING NOTE 1 NOTE 1


END FLANGED AND BOLTED HOSE CONNECTION
D XXXXXXX
VENDOR PACKAGE LINE 3"x2" 3"x2" D CONTINUATION FLAG (GENERAL FROM/TO)
XXXXXXX
B CONCENTRIC REDUCER ECCENTRIC REDUCER B
CHEMICAL INJECTION POINT
(SEE TYPICAL DETAIL PRODUCT INLET
ELECTRICALLY TRACED 1910-02-BPFM-01401)
SPECTACLE BLIND SPECTACLE BLIND
(CLOSED) (OPEN)
COLD INSULATED LINE PRODUCT OUTLET
T GAS TRAP
(TEMP <60°C)

SPADE BLIND RING SPACER


HOT INSULATED LINE
(TEMP >60°C)
C PIPING LABELS C
EXPANSION JOINT FLAME ARRESTOR
INTERNALLY TREATED AND
EXTERNALLY PAINTED
INDICATION OF LINE BREAK
A2AL A4AL

EXTERNAL HOT FLUID TRACED FLEXIBLE COUPLING RUBBER HOSE PIPING CLASS BREAK

UG AG INDICATION OF CHANGE
OF ELEVATION E.G. ABOVE
INTERNAL HOT FLUID TRACED 03 03 GROUND, UNDERGROUND
D BARRED TEE INSULATING FLANGE VENDOR CONTRACTOR D
INDICATION OF SUPPLY LIMIT CHANGE
JACKET (INTERNAL PIPING) AND PACKAGE LIMIT

SP SPECIAL PIPING ITEM


HOSE INSULATING JOINT FOR SEQUENCE NUMBER
REFER TO PIPING ITEM LIST
BATTERY LIMITS
TP

TIE-IN POINT
RS
MIXING TEE REMOVABLE SPOOL
E INDICATION OF E
MIXING TEE CONSTRUCTION STATUS
03 CHANGE
PACKAGE LIMIT XX
SC
XXX
SAMPLE CONNECTION INDICATION OF
DESIGN CONDITION CHANGE
SILENCER

DEFINITION LAYOUT
F A F
BASKET SINGLE BASKET LINE TO BE ROUTED TO A POINT DESIGNATED WITH NO
STRAINER / FILTER STRAINER FREE DRAINING LIQUID POCKET AND NO VAPOUR POCKET IN THE LINE.
B
A
ELEVATION CHANGES ARE CONTINUOUSLY DOWNWARD ONLY
SLOPE
BY PACKAGE VENDOR B NO POCKETS ARE PERMITTED, SPECIFIC SLOPES REQUIRED
ARE SHOWN BY SYMBOL.
BY CONTRACTOR TEMPORARY STRAINER T STRAINER

BL PLANT BATTERY A NO LIQUID POCKET IN THE LINE.


G LIMIT NO LIQUID POCKET B G
B
SKID LIMIT FG
Y STRAINER XXX SIGHT GLASS NO VAPOUR POCKET IN THE LINE.
03 NO VAPOUR POCKET A
FENCE

CP
EP A
XXX CORROSION PROBE ELEVATIONS DOWNSTREAM NEVER EXCEED INLET
CORROSION PROBE
(ELECTRIC RESISTANCE) GRAVITY FLOW B ELEVATIONS. LINE MAY CONTAIN LIQUID POCKETS AND
VAPOUR POCKETS.

H H
LP
CC
CORROSION COUPON XXX CORROSION PROBE VALVES
(LINEAR POLARIZATION)

GATE VALVE NORMALLY OPEN

CHECK VALVE

BALL VALVE (REDUCED BORE) NORMALLY OPEN


FUNNEL
J PULSATION DAMPER J
BALL VALVE (FULL BORE) NORMALLY OPEN

BUTTERFLY VALVE NORMALLY OPEN

GLOBE VALVE NORMALLY OPEN

PLUG VALVE NORMALLY OPEN


ATM
OPEN VENT VENT WITH SCREEN
GATE VALVE NORMALLY CLOSED

CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A. OLIVIERI T.VECCIA C.MARZI R.CHIORRINI


K BALL VALVE (REDUCED BORE) NORMALLY CLOSED K
CD-FE 02 21/12/10 ISSUED FOR TENDER A. OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
CD-FE 01 17/12/10 FINAL ISSUE A. OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
BALL VALVE (FULL BORE) NORMALLY CLOSED
CD-FE 00 22/09/10 ISSUED FOR APPROVAL A. OLIVIERI T.VECCIA U.BARBARESI R.CHIORRINI
ELECTRIC HEATING Validity Rev. Date Description
CONDENSATE TRAP WITH FLOAT OR Prepared by Checked by Approved by Contractor Company
TUBE APPLIED TO GLOBE VALVE NORMALLY CLOSED Status number Approval Approval
GENERAL SYMBOL EQUIPMENT Revision index

BUTTERFLY VALVE NORMALLY CLOSED Company logo and business name Project name Company identification
ZUBAIR OIL FIELD 00250600BPFM08030
PLUG VALVE NORMALLY CLOSED DEVELOPMENT PROJECT Job. N
THERMOSTATIC THERMODYNAMIC Contractor logo and business name Contractor identification
L NEEDLE VALVE NORMALLY OPEN L
STEAM TRAP STEAM TRAP
022026-2506-GD-B-08030
EXCESS FLOW VALVE Contract N
Vendor logo and business name Vendor identification
V ANGLE GLOBE VALVE N.A.
N.A.
V 03 Order N N.A.
NOTE 1 FOOT VALVE Facility Name Location Scale Sheet of Sheets
NOTE 1
ZUBAIR FIELD ONSHORE N.A. 4 of 10
VENT DIAPHRAGM VALVE
Document Title
LEGENDA & SYMBOLS Supersedes N.
M DOUBLE BLOCK AND BLEED VALVE WITH VALVE DRAINAGE HOLE Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_04_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

SIGNAL LINES GENERAL INSTRUMENTATION FLOW ELEMENTS (NOTE 2,3) CONTROL VALVES (NOTE 2) FUNCTION SHOW IN BOX
A A
GENERAL NOTES:
I
CONNECTION PROCESS AUXILIARY LOCATION PILOT LIGHT ORIFICE P I/P TRANSDUCER A. ALL INSTRUMENT SYMBOLS ARE IN ACCORDANCE WITH ISA S5.1 AND
ISA S5.3 STANDARDS.
PNEUMATIC SIGNAL 3-WAY GATE VALVE
LOCAL
CONTROL PANEL LOCAL CONTROL PANEL POSITIVE DISPLACEMENT
P

ELECTRIC SIGNAL
XXXX I P/I TRANSDUCER NOTES:
B CHOKE VALVE (MANUAL) B
SYSTEM INTERNAL LINK (SOFTWARE OR DATA LINK) 1. ELECTROMAGNETIC PHENOMENA INCLUDE HEAT, RADIO WAVES, NUCLEAR
IA INSTRUMENT AIR SUPPLY
M MAGNETIC SUM
RADIATION AND LIGHT.
2. ALL FLOW ELEMENTS AND CONTROL VALVES HAVE MINIMUM RATING 300#.
INSTRUMENT CAPILLARY TUBING 3. ALL CONTROL VALVES SHALL BE EQUIPPED WITH CONTINUOS POSITION
TRANSMITTER. 03
DIAPHRAGM SEAL CHOKE VALVE (AUTO) 4. ALL SELF ACTUATED VALVES WITH DN>=3" SHALL BE EQUIPPED WITH LIMIT
HYDRAULIC SIGNAL ULTRASONIC d/dt
DERIVATIVE SWITCHES OPEN AND CLOSED POSITION.

MECHANICAL LINK
RELIEF DEVICES
FI n
INDICATING VARIABLE AREA METER CONTROL VALVE (PFD)
ELECTROMAGNETIC OR SONIC (GUIDED) (NOTE 1) ROOT EXTRACTION
C C
CASE:
ELECTROMAGNETIC OR SONIC (NOT GUIDED) SIZE:
P. SET:
(NOTE 1) PSV VORTEX BALL VALVE (REDUCED BORE)
PRESSURE RELIEF OR SAFETY HIGH SELECTION
VALVE
GENERAL INSTRUMENTATION
VENTURI TUBE GLOBE VALVE
LOW SELECTION

UNIT CODE
TRAIN NUMBER VACUUM RELIEF VALVE
D MEASURED VARIABLE FLOW STRAIGHTENING VANES BUTTERFLY VALVE D
AND FUNCTION DIFFERENCE
SEQUENCE NUMBER
AND SUFFIX
SOLENOID VALVES 03
DIAPHRAGM VALVE
AVG
INSTRUMENT FIELD MOUNTED PSE AVERAGE
S
PRESSURE SAFETY ELEMENT
PLUG VALVE
2-WAY VALVE
INSTRUMENT IN CONTROL ROOM
E NORMALLY ACCESIBLE BY OPERATOR S
E

PRESSURE AND VACUUM ANGLE VALVE


RELIEF VALVE SPRING LOADED
INSTRUMENT ON LOCAL PANEL VACUUM PRESSURE
TYPICAL DETAILS
(e.g. UCP, LCP)
NORMALLY ACCESIBLE BY OPERATOR S CHEMICAL INJECTION POINT

PRESSURE REGULATORS (NOTE 4) 3-WAY VALVE


DETAIL "Y" 1"
DETAIL "Z"
SHARED DISPLAY, CONTROL ON CONTROL
F ROOM F
NORMALLY ACCESIBLE BY OPERATOR 1/2"
2" BLIND FLANGE
S
BLIND FLANGE HOLED DRILLED
1" - 3"
PCV 4-WAY VALVE
SELF ACTUATED PRESSURE REDUCING SP
A20
REGULATOR WITH EXTERNAL TAP A02

25 2"
SHARED DISPLAY, CONTROL ON CONTROL
ROOM INACESSIBLE BY OPERATOR
PCV SELF ACTUATED DIFFERENTIAL PRESSURE ACTUATORS 3" 5 WELDOLET OR
REDUCING REGULATOR WITH INTERNAL TEE REDUCING
AND EXTERNAL PRESSURE TAP
G G

DIAPHRAGM
PCV CLOSED END
SHARED DISPLAY/CONTROL ON LOCAL SELF ACTUATED BACK PRESSURE
PANEL (e.g. UCP, LCP) REGULATOR SELF CONTAINED
NORMALLY ACCESIBLE BY OPERATOR
TYPICAL DETAIL "Y" WILL BE USED
DIAPHRAGM (PRESSURE BALANCED)
FOR INJECTION POINT WITH RATING LESS
TYPICAL DETAIL "Z" WILL BE USED
PCV THAN AND EQUAL TO 600#.
FOR INJECTION POINT WITH RATING HIGHER THAN 600#
SHARED DISPLAY, CONTROL ON LOCAL PANEL SELF ACTUATED PRESSURE REGULATOR
(e.g. UCP, LCP), INACESSIBLE BY OPERATOR. SELF CONTAINED
H H
DOUBLE OR IDENTIFICATION LETTERS FUNCTIONS
SINGLE ACTING CYLINDER
XXX SELF ACTUATED PRESSURE REDUCING
PCV FIRST LETTER SUCCEEDING LETTERS
CONTROL VALVE SELF CONTAINED
PROGRAMMABLE LOGIC CONTROL (XXX: ESD.....) WITH HAND WHEEL ADJUSTABLE SET POINT M
NORMALLY ACCESIBLE BY OPERATOR MEASURED OR READOUT OR OUTPUT
MOTOR OPERATED (ELECTRICAL) MODIFIER MODIFIER
INITIATING VARIABLE PASSIVE FUNCTION FUNCTION

A ANALYSIS ALARM
XXX MANUAL B BURNER, COMBUSTION
J PROGRAMMABLE LOGIC CONTROL INACESSIBLE J
C SELF ACTUATED CONTROL
BY OPERATOR (XXX: ESD .....)
D DIFFERENTIAL
SPRING
E VOLTAGE SENSORY (PRIMARY ELEMENT)
F FLOW RATE RATIO (FRACTION)
G GLASS, VIEWING DEVICE
HAND WHEEL
PLC FIELD MOUNTED H HAND HIGH

S
I CURRENT (ELECTRICAL) INDICATE
R J POWER SCAN CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K SOLENOID WITH MANUAL RESET CD-FE 02 21/12/10 ISSUED FOR TENDER A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K
K TIME, TIME SCHEDULE TIME RATE OF CHANGE CONTROL STATION
XXX
CD-FE 01 17/12/10 FINAL ISSUE A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
COMPUTERIZED FUNCTION (XXX: ESD .....) L LEVEL LIGHT LOW
CD-FE 00 22/09/10 ISSUED FOR APPROVAL A.OLIVIERI T.VECCIA U.BARBARESI R.CHIORRINI
IN CONTROL ROOM NORMALLY ACCESSIBLE D
M MOISTURE MOMENTARY MIDDLE, INTERMEDIATE Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
BY OPERATOR Status number Approval Approval
DIGITAL N Revision index

O ORIFICE, RESTRICTION Company logo and business name Project name Company identification
XXX
COMPUTERIZED FUNCTION(XXX: ESD ....) P PRESSURE, VACUUM POINT (TEST) CONNECTION ZUBAIR OIL FIELD 00250600BPFM08030
IN CONTROL ROOM INACESSIBLE BY Q QUANTITY INTEGRATE, TOTALIZE DEVELOPMENT PROJECT Job. N
OPERATOR
ACTUATORS IN POWER FAILURE R RECORD Contractor logo and business name Contractor identification
L L
S SPEED, FREQUENCY SAFETY SWITCH 022026-2506-GD-B-08030
Contract N
T TEMPERATURE TRANSMITTER
FAIL OPEN Vendor logo and business name
MULTIFUNCTION Vendor identification
UNDEFINED INTERLOCK LOGIC U MULTIVARIABLE MULTIFUNCTION MULTIFUNCTION
FO N.A. N.A.
V VIBRATION VALVE, DAMPER, LOUVRE
Order N N.A.
W WEIGHT, FORCE WELL Facility Name Location Scale Sheet of Sheets
FAIL CLOSED ZUBAIR FIELD
X DANGER X AXIS FAULT ONSHORE N.A. 5 of 10
FC
Y EVENT, STATE OR PRESENCE Y AXIS RELAY, COMPUTE, CONVERT Document Title
LEGENDA & SYMBOLS Supersedes N.
M FAIL LOCKED (ON POSITION) Z POSITION, DIMENSION Z AXIS
DRIVER, ACTUATOR, FINAL Superseded by N. M
CONTROL ELEMENT Plant Area Plant Unit
P&I DIAGRAM
FLP N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_05_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

FLOW ORIFICE WITH DB&B FLOW ORIFICE WITH SB&B LEVEL INSTRUMENTATION WITH BRIDLE LEVEL INSTRUMENTATION WITH SB&B GENERAL NOTES:
A. ALL INSTRUMENT SYMBOLS ARE IN ACCORDANCE WITH ISA S5.1 AND ISA S5.3 STANDARDS.
A B. REFER TO ISOLATIN PHILOSOPHY DOCUMENT NUMBER "00250600FFRB08023". A

P&ID REPRESENTATION P&ID REPRESENTATION P&ID REPRESENTATION P&ID REPRESENTATION

FIT FIT

NOTES:

VESSEL

VESSEL
LG LIT LIT 1. ROUTING TO CLOSED OR COLD DRAIN DEPENDING ON SERVICE.
B 2. IF INSTRUMENT IS USED FOR ESD ISOLATION VALVES SHALL BE CAR-SEAL-OPEN (CSO). B
3. INSTRUMENT VENT VALVE SHALL NOT BE SHOWN ON P&ID'S.
4. FOR LIQUID CONTAINING SOLIDS IN SUSPENSION ORIFICE PLATE SHALL BE SEGMENTAL BORE TYPE.
5. LEVEL GAUGE SHALL BE MAGNETIC TYPE.

TYPICAL PROCESS CONNECTION TYPICAL PROCESS CONNECTION TYPICAL PROCESS CONNECTION TYPICAL PROCESS CONNECTION

C C
FIT FIT 3/4" V 3/4" V 3/4" V 3/4"

2"x3/4"
NOTE 3 NOTE 3 NOTE 3 NOTE 3 4"x2" NOTE 2
INSTRUMENT INSTRUMENT 3" 2"
PIPING PIPING
NOTE 2 NOTE 2 NOTE 2 NOTE 2
2"

PIPING
INSTR.
2"

INSTRUMENT

INSTRUMENT
3/4 "
D 3/4 3/4
" " 3/4 D

PIPING
VESSEL

VESSEL
PIPING
" LG LIT LIT
NOTE 5 4"
2"
2" NOTE 2
FE FE 3" 2"
(MIN. RATING 300#) (MIN. RATING 300#)

PIPING
INSTR.
4"x2"
2"x1"
INSTR. INSTR. INSTR.
E PIPING PIPING PIPING E
3/4" 1" 3/4" 3/4"
FLOW INSTRUMENT DETAIL NOTE 1 NOTE 1
2" 2"

VALVE ORIENTATION DEPENDANT ON FLUID AND PIPERUN TO CLOSED DRAIN TO CLOSED DRAIN
(MIN. RATING 300#) (MIN. RATING 300#)

F F

GAS LIQUID
(NOTE 4)

G G
LEVEL INSTRUMENTATION WITH DB&B PRESSURE INSTRUMENT WITH DB&B PRESSURE INSTRUMENT WITH SB&B TEMPERATURE INSTRUMENT

P&ID REPRESENTATION P&ID REPRESENTATION P&ID REPRESENTATION P&ID REPRESENTATION

H PIT PIT TIT H


VESSEL

LIT

J J

TYPICAL PROCESS CONNECTION TYPICAL PROCESS CONNECTION TYPICAL PROCESS CONNECTION

TIT TW
PIT PIT
3/4"
TE
PIPING INSTR. NOTE 3 NOTE 3 CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K CD-FE 02 21/12/10 ISSUED FOR TENDER A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K
3/4" V
INSTR. INSTR.
CD-FE 01 17/12/10 FINAL ISSUE A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
2" 2" PIPING PIPING
3/4" NOTE 2 3/4" NOTE 2 INSTR. CD-FE 00 22/09/10 ISSUED FOR APPROVAL A.OLIVIERI T.VECCIA U.BARBARESI R.CHIORRINI
1-1/2"
PIPING Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
NOTE 2 NOTE 2 Status number Approval Approval
Revision index
LIT PIPING PIPING PIPING
Company logo and business name Project name Company identification
ZUBAIR OIL FIELD
VESSEL

00250600BPFM08030
PIPING INSTR. PIT PIT DEVELOPMENT PROJECT Job. N
TIT TW
Contractor logo and business name Contractor identification
L 2" 2" L
NOTE 3 NOTE 3 TE 022026-2506-GD-B-08030
NOTE 2 NOTE 2 Contract N
INSTR. INSTR.
3/4" V INSTR. Vendor logo and business name Vendor identification
PIPING PIPING
PIPING 2" NOTE 2 2" NOTE 2 N.A.
3/4"
INSTR.
N.A.
PIPING 2" Order N N.A.
2" NOTE 1 Facility Name Location Scale Sheet of Sheets
VESSEL VESSEL ZUBAIR FIELD
VESSEL
ONSHORE N.A. 6 of 10
TO CLOSED DRAIN
(MIN. RATING 300#) (MIN. RATING 300#) (MIN. RATING 300#) Document Title
(MIN. RATING 300#) LEGENDA & SYMBOLS Supersedes N.
M Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_06_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

DETAIL A - ESD VALVE WITH LOCAL PARTIAL STROKE TEST AND LOCAL RESET DETAIL B - ESD VALVE WITH LOCAL RESET DETAIL C - BDV VALVE WITH LOCAL RESET NOTES:
A 1. VALVE RESET MUST ALWAYS BE ACCOMPLISHED LOCALLY AND MANUALLY. MEANS SHALL BE PROVIDED TO ENABLE
A
THE TESTING OF THE DELUGE VALVE WITHOUT DISCHARGING FIRE WATER THROUGH THE PIPE-WORK AND
NOZZLES. ADDITIONAL BLIND FLANGE CONNECTION ON DISCHARGE PIPING SHALL BE ADDED TO PERFORM REAL
P&ID REPRESENTATION P&ID REPRESENTATION P&ID REPRESENTATION DISCHARGING TEST.

DET "A" DET "B" DET "C"

SDV
+
SDV
+
BDV
+

B B
FC FC FO

03
HS-R RESET AIR
CMD SUSTAIN

03
HS-T
START
TEST
C TEST START ESD CMD 03 03 C
HS-C I 03 03
PUSH ESD ESD
BUTTON XYSA HSL
XYSA HSH
S
I S
I
CLOSED OPEN
YA-T
03
TEST
03 FAILURE
XYSA IA ATM IA ATM
S
HS-R HS-R
RESET CMD RESET CMD
IA ATM 03 R R
HSL CLOSED 03 03
CMD
XYSB 03 XYSB 03 XYSB
R S S S

D 03 D
ATM ATM ATM
03
03
R
03 R R
XYSP
ATM 03
S

ATM MANUAL VALVE ATM MANUAL VALVE

ATM MANUAL VALVE


ZSH ZSH
ZSH
E E
SDV ESD BDV ESD OPEN
SDV + OPEN +
+ ESD OPEN ZSL I ZLH ZSL I ZLH
ZSL I ZLH DISCREPANCY DISCREPANCY
DISCREPANCY
YA-D 03 YA-D 03
YA-D FC FO
FC 03
ZSX ZLL ZLL
ZLL
CLOSED CLOSED
CLOSED

03
F ZLX
TEST L.S. F
POSITION

DETAIL P - ESD VALVE WITH TOTAL STROKE TEST AND LOCAL RESET DETAIL X - ESD VALVE WITH REMOTE PARTIAL STROKE TEST DETAIL R - PNEUMATIC VALVE DCS CONTROLLED

P&ID REPRESENTATION P&ID REPRESENTATION P&ID REPRESENTATION


G G
DET "P" DET "X" DET "R"

SDV SDV
+ UV
+ +

FC

H 03 H
HS-R RESET
03 XL-G TEST SELECTED CMD
FROM LOCAL
03

HS-T
START
TEST
XYSA ESD CMD
I
S
03
OPEN ESD START TEST
HSH I HS-T IA ATM YA-T TEST
J J
FAILURE

XYSA HSL CLOSED


S 03 XYSB
S CMD 03 OPEN/CLOSE
HSHL
03
IA ATM 03 ATM
03 03
HS-C XL-H XL-I XA
YLA SOV UNAVAILABLE
R
CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K XYSB
TEST TEST TEST TEST S
CD-FE 02 21/12/10 ISSUED FOR TENDER A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K
S SELECTED CONFIRMED RUNNING FAILURE
CD-FE 01 17/12/10 FINAL ISSUE A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
ATM MANUAL VALVE IA ATM
CD-FE 00 22/09/10 ISSUED FOR APPROVAL A.OLIVIERI T.VECCIA U.BARBARESI R.CHIORRINI
ATM
Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
OPEN Status number Approval Approval
03 ZSH ZSH ZLH Revision index
R
YA-D Company logo and business name Project name Company identification
SDV DISCREPANCY ZUBAIR OIL FIELD 00250600BPFM08030
+ ESD ZSL ZLL
ATM ZLH
ZSL I ZLH DEVELOPMENT PROJECT Job. N
MANUAL VALVE DISCREPANCY
CLOSED Contractor logo and business name
03 Contractor identification
L ZSH ESD
YA-D L
022026-2506-GD-B-08030
ZSX
I YA-D ZLL Contract N
SDV DISCREPANCY Vendor logo and business name
+
ZSL Vendor identification
N.A. N.A.
ZLL
TEST L.S. Order N N.A.
ZLX
FC Facility Name Location Scale Sheet of Sheets
PARTIAL ZUBAIR FIELD
03 STROKE ONSHORE N.A. 7 of 10
Document Title
LEGENDA & SYMBOLS Supersedes N.
M Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_07_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

DETAIL D - MOTOR OPERATED VALVE DETAIL E - MOTOR OPERATED VALVE (UCP CONTROLLED) DETAIL H - MOTOR OPERATED VALVE (UCP CONTROLLED) WITH POSITION INDICATION DETAIL L - MOTOR OPERATED VALVE WITH POSITION INDICATION
A A

P&ID REPRESENTATION P&ID REPRESENTATION P&ID REPRESENTATION

DET "D" DET "E" DET "H" DET "L"


MOV MOV
B M +
M + M MOV
+ M MOV
+ B

LOC/REM
YLR

03 LOC/REM
YLR
DISCREPANCY OPEN CLOSE AUTO/MAN CLOSED OPENED STOP POSITION FAULT LOC/REM
DISCREPANCY OPEN CLOSE AUTO/MAN OPEN CLOSED FAULT LOC/REM YA-D HSH HSL HS-A ZLL ZLH HSS ZI YA-F YLR
C HSH C
HSH HSH YA-D HSH HSL HS-A ZLH ZLL YA-F YLR OPEN
HSH
OPEN OPEN
OPEN 03 03
03 03 HSL
CLOSE
HSL
HSL HSL CLOSE
CLOSE HSS
CLOSE STOP
HSS
03 STOP
FAULT OPEN
HSS YA-F HSLR
HSH UPC OPEN
D 03 FAULT D
HSH YA-F
STOP LOC/REM
UPC CLOSE
HSL CLOSE MOV
+
HSLR
ZIT HSL
M
STOP
LOCAL/REMOTE HSS
ZSH STOP
MOV
+
ZSH HSS 03
LOC/REM
M M OPEN DISCREPANCY
HSLR LOC/REM ZSH ZLH
ZSL M YA-D
HSLR
E ZSL E
CLOSED
ZSL ZLL
OPEN 03
ZSH ZLH
MOV
DISCREPANCY +

MOV POSITION
YA-D +
ZIT ZI

ZSL ZLL
CLOSED

F F

FIRE E SAFETY DETAIL F - DELUGE VALVE WITH AIR DETAIL G - DELUGE VALVE WITH WATER

P&ID REPRESENTATION

G FIRE HYDRANT WITH MONITOR NOZZLE G


SAFETY SHOWER
DET "F" DET "G"

SQV SQV
+
FIRE HYDRANT 2-WAY +

FIRE HYDRANT 3-WAY (PUMPER CONNECTION) SAFETY SHOWER WITH EYEWASH

H H

FOAM CHAMBER
SPRINKLER NOZZLE ESD F&G ESD F&G

I XYS I XYS
XSH XS XSH XS
HOSE REEL
WATER SPRAY NOZZLE 03
03
S SQY
S
FIRE MONITOR
J MIXER FOR PREMIXER
IA ATM WATER ATM J
FOAM PROPORTIONER
S S
FIRE MONITOR ELEVATED SQY
ATM ATM
NOZZLE AND FOAM CHAMBER
FOR FIXED ROOF TANKS
SQY SQY
FIRE MONITOR REMOTE OPERATED PSH
PSH
NOZZLE AND FOAM SHEDDER
SQV SQV CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
FOR FLOATING ROOF TANKS +

K +

CD-FE 02 21/12/10 ISSUED FOR TENDER A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI


K
CD-FE 01 17/12/10 FINAL ISSUE A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
FOAM MONITOR CD-FE 00 22/09/10 ISSUED FOR APPROVAL A.OLIVIERI T.VECCIA U.BARBARESI R.CHIORRINI
(NOTE 1)
HYDRANT HOSE BOX Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
Status number Approval Approval
Revision index
FOAM MONITOR ELEVATED Company logo and business name Project name Company identification
SPRINKLER VALVE ZUBAIR OIL FIELD 00250600BPFM08030
DEVELOPMENT PROJECT Job. N
Contractor logo and business name Contractor identification
L DELUGE VALVE L
022026-2506-GD-B-08030
FOAM MONITOR REMOTE OPERATED
Contract N

CLEAN AGENT NOZZLE Vendor logo and business name Vendor identification
N.A. N.A.
Order N N.A.
EYE WASH CO2 NOZZLE Facility Name Location Scale Sheet of Sheets
ZUBAIR FIELD
ONSHORE N.A. 8 of 10
Document Title
LEGENDA & SYMBOLS Supersedes N.
M Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_08_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

DETAIL I - MOTOR (AUTO MANUAL CONTROLLED) WITH TRIP COMING FROM ESD DETAIL M - MOTOR WITH TRIP COMING FROM ESD DETAIL N - UCP MOTOR WITH TRIP COMING FROM ESD
A A

P&ID REPRESENTATION P&ID REPRESENTATION P&ID REPRESENTATION

ESD DET "I" ESD DET "M"

I I ESD UCP DET "N"


MCC M MCC M
I
B MCC M B

START
HSH 03 HSH HSH
HSH
START START
START
HSL HSL
STOP HSL
03 HSL

C STOP STOP C
STOP
HSLR HSLR
HSLR
03 LOC/REM LOC/REM
LOC/REM
ESD 03 ESD

I
MCC M I
MCC M MCC M
XS XS

03 UNAVAILABLE
YAU
YAU YAU

D UNAVAILABLE UNAVAILABLE D
FAULT
YA-F
START 03 03
HSH YA-F 03 YA-F START
03 HSH 03
FAULT FAULT
03 CURRENT
YII
03 03
UPC ABSORPTION
STOP YL-R
03 HSL YL-R STOP
RUNNING/ RUNNING/ HSL
STOPPED STOPPED RUNNING/
YII YL-R STOPPED
CURRENT
AUTO/MAN INDICATION NOTE 3 03
03 HS-A YLR ENCS YLR
TRIP/
E LOC/REM LOC/REM YXA ACTIVATED
E
YXA ESD
YII TRIP/
CURRENT ACTIVATED I
INDICATION LOC/REM
XS-E YLR
ENCS
YXA
TRIP/
ACTIVATED 03

F F

DETAIL T - VARIABLE SPEED MOTOR CONTROLLED BY DCS DETAIL U - VARIABLE SPEED MOTOR CONTROLLED BY DCS THROUH UCP

G P&ID REPRESENTATION P&ID REPRESENTATION G

DET "T" 03 DET "U"

VSD M UCP VSD M


H H

HSH HSH
START START

HSL HSL
STOP STOP

J J
HSLR HSLR
LOC/REM LOC/REM

START
HSH
03 HCS HCS
SPEED SET POINT SPEED SET POINT

STOP START
03 HSL HSH
VSD M VSD M

SPEED UNAVAILABLE CF-DE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K SET POINT
YAU
STOP UNAVAILABLE CF-DE 02 21/12/10 ISSUED FOR TENDER A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K
03 SIC HSL UPC YAU
CF-DE 01 17/12/10 FINAL ISSUE A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
FAULT CF-DE 00 22/09/10 ISSUED FOR APPROVAL A.OLIVIERI T.VECCIA U.BARBARESI R.CHIORRINI
YA-F
SPEED FAULT Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
YA-F Status number Approval Approval
SIC SET POINT 03 Revision index
CURRENT ABSORPTION
YII ESD Company logo and business name Project name Company identification
I CURRENT ABSORPTION
YII ZUBAIR OIL FIELD 00250600BPFM08030
DEVELOPMENT PROJECT Job. N
RUNNING/STOPPED
YL-R
RUNNING/STOPPED Contractor logo and business name Contractor identification
L 03 YL L
03 022026-2506-GD-B-08030
LOC/REM Contract N
YLR
LOC/REM Vendor logo and business name
YLR Vendor identification
N.A. N.A.
03 SPEED
YI-S 03 Order N N.A.
INDICATION SPEED
YSI Facility Name Location Scale Sheet of Sheets
ZUBAIR FIELD ONSHORE N.A. 9 of 10
Document Title Supersedes N.
M LEGENDA & SYMBOLS Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_09_10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

SAMPLE CONNECTION NOTES:


1. APPLY DB&B AS PER ISOLATION PHILOSOPHY.
A 2. MINIMIZE DISTANCE FROM PROCESS TAKE-OFF TO SAMPLE CONNECTION.
A
3. SAMPLE LINE TO BE INSULATED FOR PERSONEL PROTECTION UPSTREAM OF COOLER.

SAMPLE CONNECTION - TYPE "A" SAMPLE CONNECTION - TYPE "B"


FOR LIQUID SAMPLES BELOW 60°C WITH ATM BOILING TEMPERATUIRE ABOVE THE SAMPLE TEMPERATURE FOR LIQUID SAMPLES ABOVE 60°C WITH ATM BOILING TEMPERATURE BELOW THE SAMPLE TEMPERATURE

P&ID REPRESENTATION P&ID REPRESENTATION

B B
TYPE "A" TYPE "B"
SC SC

STAINLESS STEEL
PROCESS SPEC.
NOTE 1,2,3

1" 1"x3/4"
PROCESS LINE/
C EQUIPMENT
C

FROM D 3/4"
BOTTOM

1"x3/4" SERVICE WATER


PROCESS LINE
NOTE 2

2"x3/4"
D 4"x2" D

1"x3/4"
TI

STAINLESS STEEL
PI

DRAIN SPEC.
3/4" 1"

4"x2"
2"x3/4"
PIPING 3/4" TO COLD / CLOSE DRAIN
E TUBING
3/4" E
SAMPLE BOTTLE
300mm (VERTICAL)
D

3/4"

OPEN DRAIN

F F

G SAMPLE CONNECTION - TYPE "C" SAMPLE CONNECTION - TYPE "D" G

FOR GAS SAMPLES FOR LIQUID SAMPLES BELOW 60°C WITH ATM BOILING TEMPERATURE BELOW SAMPLE TEMPERATURE

P&ID REPRESENTATION P&ID REPRESENTATION

TYPE "C" TYPE "D"


SC SC

H H

TO BURN PIT /
TO FLARE HEADER/ TO FLARE HEADER /
BURN PIT TO COLD / CLOSED DRAIN

NOTE 2 1" NOTE 2 1"


J J
FROM D FROM D
TOP TOP

PROCESS LINE PROCESS LINE


PROCESS SPEC. PROCESS SPEC. PROCESS SPEC. PROCESS SPEC.
STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL
1" 1"

1"x3/4" 1"x3/4" 1"x3/4" 1"x3/4"


CD-FE 03 20/04/11 MODIFIED FOR ADDENDUM A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K CD-FE 02 21/12/10 ISSUED FOR TENDER A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
K
CD-FE 01 17/12/10 FINAL ISSUE A.OLIVIERI T.VECCIA C.MARZI R.CHIORRINI
V V CD-FE 00 22/09/10 ISSUED FOR APPROVAL A.OLIVIERI T.VECCIA U.BARBARESI R.CHIORRINI
Validity Rev. Date Description Prepared by Checked by Approved by Contractor Company
Status number Approval Approval
3/4" 3/4" 3/4" 3/4" Revision index

Company logo and business name Project name Company identification


ZUBAIR OIL FIELD 00250600BPFM08030
PI PI DEVELOPMENT PROJECT Job. N
Contractor logo and business name Contractor identification
L L
022026-2506-GD-B-08030
Contract N
Vendor logo and business name Vendor identification
N.A. N.A.
Order N N.A.
SAMPLE BOTTLE SAMPLE BOTTLE Facility Name Location Scale Sheet of Sheets
(HOROZONTAL) (VERTICAL) ZUBAIR FIELD
ONSHORE N.A. 10 of 10
Document Title
LEGENDA & SYMBOLS Supersedes N.
M Superseded by N. M
Plant Area Plant Unit
P&I DIAGRAM
N.A.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A1
This document is property of Eni S.p.A. Exploration & Production Division. It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent. Software SMARTPLANT File No 00250600BPFM08030_CDFE03_10_10

You might also like