You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

P&ID SCHEMATIC TYPICAL INSTRUMENT P&ID SCHEMATIC TYPICAL INSTRUMENT P&ID SCHEMATIC TYPICAL INSTRUMENT P&ID SCHEMATIC TYPICAL INSTRUMENT
NOTES:
1 FOR LEGEND, SYMBOLS, GENERAL NOTES AND ENGINEERING DESIGN NOTES SEE
A REPRESENTATION REPRESENTATION REPRESENTATION REPRESENTATION DWG. NO. A1-JGS1EP-0001, 0002 AND 0003.
2. FOR DETAIL, REFER TO INST. PROCESS LEAD PIPING HOOK-UP.
A
(DOC. NO. A4-071061-0000-IN-804).
PRESSURE INDICATION DIFFERENTIAL PRESSURE TRANSMITTER LEVEL INDICATION TEMPERATURE INDICATION 3. FOR PRESSURE INSTRUMENTS WITH DIAPHRAGM SEALS: DIAPHRAGM SEAL SIZE
IS 2" IF INDICATED OR 3" IF NOT INDICATED ON THE SPECIFIC P&ID.
PG TG 4. PROCESS CONNECTION FOR TEMPERATURE INSTRUMENTS IS 1 1/2" FOR
TG
XXXX 3/4" NPT 2"x3/4" XXXX GENERAL SERVICE.

PIPING
3/4" NPT

INST.
2" XXXX
PG FF 5. VALVE WILL CLOSE WHEN BOTH SOLENOID VALVES ARE DE-ENERGIZED.
INST. 3/4" FF FF 1 1/2"
XXXX PIPING PDI PDT PDI NOTE 4
3/4" LI
B XXXX XXXX XXXX XXXX D/P
B
3/4"

PIPING
PG 2"x3/4"
TEMPERATURE TRANSMITTER

INST.
3/4" NPT
2"
XXXX FF

PIPING
PG

INST.
LT LI TE TT TC
XXXX TC
INST. XXXX XXXX XXXX XXXX XXXX
D/P
PIPING 2" OR 3" XXXX
NOTE 3 NOTE 3 1 1/2"

PIPING
3/4" NPT

INST.
NOTE 4
FF 3"
3/4" FF
PDI 1 1/2" PDT PDI
C FF C
TE TT TI
XXXX 1 1/2" XXXX XXXX TI
3/4" NPT 3/4" LI XXXX XXXX XXXX
1 1/2" x 3/4" RDF XXXX

PIPING
3/4" XXXX D/P

INST.
PG PG 3/4" NPT 1 1/2"
1 1/2"
XXXX XXXX 3" NOTE 4
PIPING INST.
FF
FF

PIPING
LT LI

INST.
TE
XXXX XXXX TI MUX
D/P XXXX

PIPING
XXXX

INST.
1 1/2"
3" FF
D NOTE 4 D
2" OR 3" PDI 3" PDT PDI 1/2"
NOTE 3 3" 2"
PG PG XXXX 3" XXXX XXXX FF
2" TT TC
XXXX XXXX FF TC
FF XXXX XXXX

PIPING
NOTE 3 PIPING INST.

INST.
LI LT LI XXXX
XXXX XXXX XXXX 1 1/2"
DISP. DISP. NOTE 4
2"
PG PG
2"
FLOW ORIFICE - TRANSMITTER

PIPING
PIPING

INST.
3/4" NPT 1/2"

INST.
XXXX XXXX
E 3/4"
E
2" OR 3" FF
NOTE 3 NOTE 3 PDG PDG
INST. FI FI
PIPING XXXX XXXX
XXXX XXXX
3/4"
2"x3/4"

PIPING
2"

INST.
3/4" NPT FF
FT
LG LG
PG PG XXXX

PIPING
INST. INST.

INST.
XXXX XXXX
XXXX XXXX PIPING PIPING
NOTE 3 2" OR 3" 3" 1/2" 1/2"
2"x3/4"
F NOTE 3 PDG 3" PDG 2" F
3"

PIPING
XXXX XXXX

INST.
3"

FE
PRESSURE SWITCH / TRANSMITTER PIPING
INST. (IF REQUIRED) XXXX
PI
XXXX FI
ON-LINE TEST FOR ESD ON-OFF VALVE UW INST. PIPING
UW
FF XXXX
FF 2"x3/4"
FI
PT Z Z 2" FF
G FF XXXX FT
G
XXXX 3/4" NPT
PI LG LG XXXX
INST. XXXX XXXX
XXXX PIPING S S
3/4" INST. INST.
2"x3/4" PIPING PIPING
IA IA 2" 3" 3"

PIPING
INST.
PI
XXXX ATM ATM LOCK-OUT
SYSTEM OWD
CD FE
H FF PG XXXX H
FF PT
XXXX 3/4"
PI PURGE
XXXX
SET
PO FOR HIGH BUTADIENE SERVICE
INST.
INST.
PIPING 2" OR 3"
PO PIPING FLOW ORIFICE-TRANSMITTER
NOTE 3 NOTE 3 2"x3/4"
DUAL SOV WITH ON-OFF VALVE PST Z 2" FF FI
UV-XXXXXP 3/4"
PURGE FI XXXX
PO
LG LG SET
ESD-DOR ESD-DOR ESD-AOR

PIPING
XXXX

INST.
3/4" NPT XSOV (115VAC) XSOV (115VAC) (4-20mA) XXXX INST. XXXX
J FF PIPING
FF J
1 1/2" x 3/4" RDF FF S S FT
3/4" 2"x3/4"
PI PT PI XXXX
1 1/2" POSITIONER 2"
XXXX XXXX XXXX IA
OPEN NOTE 5 NOTE 5 FOR PST
PIPING INST. ZL Z PO INST. INST. INST.
- PIPING PIPING PIPING
CLOSE MIN
ESD-DIR 2 4/9/19 ISSUED FOR CONSTRUCTION SAC ERF CCH/JJC
OWD
FE 1 12/7/18 ISSUED FOR CONSTRUCTION THK ERF CCH/JJC
XZSC XZSO
- - XXXX
3" RF XV 0 6/15/18 ISSUED FOR DESIGN THK ERF CCH/JCL
FF 2" OR 3" DESIGN CONSIDERATION : K
K FF
NOTE 3 SMART POSITIONER WILL BE CONFIGURED USING A REVERSE ACTING 3/4" B 3/26/18 ISSUED FOR HAZOP KC ERF CCH/JCL
PI PT PI RELAY TO AVOID RISK OF SPURIOUS TRIP ( I.E. MAXIMUM ACTUATOR 2"
2"
XXXX XXXX XXXX FC PRESSURE WILL BE AVAILABLE WHEN POWER TO THE INSTRUMENT IS LOST). A 1/19/18 ISSUE FOR REVIEW KC ERF CCH/JCL
NOTE 3
PIPING
INST.

REV DATE DESCRIPTION DRAWN CHKD APPD


3/4"
SINGLE SOV WITH ON-OFF VALVE PST Z
FF
3/4"
3/4"
3/4" NPT THIS DOCUMENT IS THE PROPERTY OF JGSPC, THE INFORMATION CONTAINED HEREIN MAY NOT
BE USED OR COPIED IN ANY MANNER WITHOUT THE WRITTEN PERMISSION OF JGSPC.
FF FF
LG LI LG JG SUMMIT
PT PT PI ESD-DOR ESD-AOR 3/4" NPT PETROCHEMICALS
XSOV (115VAC) (4-20mA) XXXX XXXX XXXX 3/4"
XXXX XXXX XXXX D/P GROUP L
L S 3/4"
PIPING
INST.

2" OR 3" FF JG SUMMIT STAGE 1 EXPANSION PROJECT


POSITIONER
PIPING

NOTE 3 NOTE 3 IA LT
INST.

FOR PST 3/4" CTCI CONTRACT EPC2


PI OPEN ZL Z XXXX
D/P
XXXX CLOSE - 2" PIPING & INSTRUMENT DIAGRAM
2"
FF FF
ESD-DIR
LI
AROMATICS & BUTADIENE EXTRACTION UNIT
3/4"
PI PT XZSC XZSO XXXX
INSTRUMENT DETAILS SHEET
XXXX XXXX - -
NOTE 3 2" OR 3" XV DESIGN CONSIDERATION :
M NOTE 3 SMART POSITIONER WILL BE CONFIGURED USING A REVERSE ACTING M
DRAWING REFERENCE No.:
RELAY TO AVOID RISK OF SPURIOUS TRIP ( I.E. MAXIMUM ACTUATOR
SCALE: DWG. No: REV:
PRESSURE WILL BE AVAILABLE WHEN POWER TO THE INSTRUMENT IS LOST).
FC NONE A1-JGS1EP-0004 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16