You are on page 1of 7

ENI - IRAQ

ZUBAIR OIL FIELD DEVELOPMENT PROJECT

INSPECTION DATA SHEETS (IDS) FOR


ELECTRIC ACTUATORS

CD-FE 02 24/11/2010 Issued for Tender Rafaele Antinori Campanelli Chiorrini


CD-FE 01 27/10/2010 Final Issue Rafaele Antinori Campanelli Chiorrini
CD-FE 00 04/10/2010 Issued for Approval Vircillo Antinori Campanelli Chiorrini
Validity Rev.
Prepared Cheched Approved Contractor Company
Status Number Date Description
Revision index by by by Approval Approval
Company logo and business name Project name Company Document ID

ZUBAIR OIL FIELD 00250600BIGB52031


DEVELOPMENT PROJECT
exploration & production division Job n.
Contractor logo and business name Contractor Document ID

022026-2506-SA-E-52031
Contract n.
Vendor logo and business name Vendor Document ID

Order n.
Facility Name Location Scale Sheet of Sheets
ONSHORE 1 of 7
Document Title Supersedes N.
Supersedes by N.
INSPECTION DATA SHEETS (IDS) FOR
Plant area Plant unit
ELECTRIC ACTUATORS

This document is property of Eni S.p.A. Exploration & Production Division.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

Software: Excel 2003 File name: 00250600BIGA52031_CDFE02_07


Company Document Owner Document ID Sheet of
CD-FE Rev. No.
Identification sheets
e & p division 00250600BIGB52031 022026-2506-SA-E-52031 02 2 of 7

REVISION HISTORY

REVISION INDEX

SHEET CD-FE 00 CD-FE 01 CD-FE 02 ---- ---- ---- ----


3 0 1 2
4 0 2
5 0 2
6 0 2
7 0 2
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
ELECTRIC ACTUATORS (IDS)
MATERIAL:

TAG:
CONCERNED COMPANIES:
C COMPANY P PURCHASER A CONTRACT AUTHORITY S SUPPLIER

CERTIFYING AUTHORITIES:

OTHER: OFFICIAL AUTHORITY:

TYPE OF INTERVENTION:

H BINDING PRESENCE. The cycle continuationis bound to the presence


P BINDING PRESENCE FOR THE % INDICATED IN THE NOTES
W NOT BINDING PRESENCE. In case of unwitnessed test the Supplier is authorized to continues the production cycle
supplying the appropriate documents.
R CHECK OF THE CERTIFICATES AND/OR DOCUMENTS.
C CHECK CARRIED OUT WITH RELEASE OF CERTIFICATE.
N CHECK CARRIED OUT WITHOUT RELEASE OF CERTIFICATE.
D SIMPLE DOCUMENTATION.

SPECIFICATIONS / DRAWINGS / REFERENCE STD:


1) 00250600BIST50031 Technical Specification for Electric Actuators
2) 00250600BISG50001 Instrumentation and Control Design Philosophy
3) 00250600BIGA50131Technical Data Sheet for Electric Actuators

INTERNATIONAL CODE AND STD:


1) ISO 5211
2) ISO 10474
3) ATEX 94/9/EC
4) IEC 60079
5) IEC 60529
6) 60947-5-2

02 24-11-2010 Issued for tender Rafaele Antinori Campanelli


01 27-10-2010 Final Issue Rafaele Antinori Campanelli
00 04-10-2010 Issue for Approval Vircillo Antinori Campanelli
Sheet Rev. Date Description Prepared by Checked by Approved by
Company Document ID Owner Document ID Sheet No

e & p division 00250600BIGB52031 022026-2506-SA-E-52031 3 of 7


ELECTRIC ACTUATORS (IDS)
MATERIAL:

TAG:

CODE OF
ITEM DESCRIPTION OF CHECKS AND TESTS INTERVENTION REFERENCE

S P C A

1 Pre-inspection meeting final checks and tests R

2 Actuator Final checks and Functional Tests

Verification of gauging and calibration of instruments used for checks


2.1 C R
and tests

2.2 Verification of materials certificates summary R R

2.3 Visual inspection according to order specification C H W

2.4 Dimensional check (key dimension) C W

2.5 Visual check of data plate C W

2.6 Check of degree of mechanical protection R R

2.7 Check of degree of electrical protection R R

2.8 Verification of safety execution “Type Execution Certificates” R R

2.9 Check of wiring connections to interface terminal block C H W

2.10 On-load and no-load manual engagement operation test C H W

2,11 On-load and no-load manual disengagement test C H W

2.12 Test of pull-up torque (100 % ) C W

2.13 Test of working torque C W

2,14 Check of thermal switch intervention at overload rotor C H W

2,15 Limit switch intervention check C H W

2.16 Remote operation control check C H W

2,17

2.18

02 24-11-2010 Issued for Tender Antinori Campanelli Campanelli


00 04-10-2010 Issue for Approval Antinori Campanelli Campanelli
Sheet Rev. Date Description Prepared by Checked by Approved by
Company Document ID Owner Document ID Sheet No

e & p division 00250600BIGB52031 022026-2506-SA-E-52031 4 of 7


ELECTRIC ACTUATORS (IDS)
MATERIAL:

TAG:

CODE OF
ITEM DESCRIPTION OF CHECKS AND TESTS INTERVENTION REFERENCE

S P C A

3 Electrical Checks

Check of wiring separation for various step level voltage check of


3,1 C W
electrical characteristics

3,2 Test of insulation resistance between phase and mass C W

3,2 Applied voltage test on main circuit (motor) and control circuit C W

3,3 Test of absorbed current at actuator pull-up torque (100% ) C W

4 Painting Checks

4,1 Visual checks of the condition of painted surfaces H W

4,2 Thickness check R R

4,3 Check of colour R W

4,4 Check of document for prescribed paints R R

5 Valve / Actuator Assembling Test

No load and load operating test with check of position and torque Limit
5,1 C H W
switches

5,2 Valve seat test with closing by actuator C H W

Overall dimension control check and hand-wheel orientation check


5,3 C H W
respect to flow direction

5,4 Check of operating time at specified control conditions C H W

02 24-11-2010 Issued for Tender Vircillo Antinori Campanelli


00 04-10-2010 Issue for Approval Vircillo Antinori Campanelli
Sheet Rev. Date Description Prepared by Checked by Approved by
Company Document ID Owner Document ID Sheet No

e & p division 00250600BIGB52031 022026-2506-SA-E-52031 5 of 7


ELECTRIC ACTUATORS (IDS)
MATERIAL:

TAG:

CODE OF
ITEM DESCRIPTION OF CHECKS AND TESTS INTERVENTION REFERENCE

S P C A

6 Documentatiosn and Calculation Checks

Verification of certification for degree of protection and area classification for


6,1 R R
components

6,2 Verification of material certification R R

Verification of calculation document for stem thrust/torque with driving


6,3 C R
fluid at dimensioning pressure
Verification of calculation document for stem thrust/torque with driving
6,4 C R
fluid at design pressure

7 Final Inspection Certification

The Manufacturer shall furnish the whole documentation concerning verifications,


7.1 checks and tests above mentioned (collected in sets), in the number of copies and
in the language required in the purchase order.
Supply Spec.
7.2 Review of manufacturer's data book C H W
MFR /STD

02 24-11-2010 Issued for Tender Vircillo Antinori Campanelli


00 04-10-2010 Issue for Approval Vircillo Antinori Campanelli
Sheet Rev. Date Description Prepared by Checked by Approved by
Company Document ID Owner Document ID Sheet No

e & p division 00250600BIGB52031 022026-2506-SA-E-52031 6 of 7


ELECTRIC ACTUATORS (IDS)

NOTES:
1) The Supplier shall indicate the Test procedure where required

02 24-11-2010 Issued for Tender Vircillo Antinori Campanelli


00 04-10-2010 Issue for Approval Vircillo Antinori Campanelli
Sheet Rev. Date Description Prepared by Checked by Approved by
Company Document ID Owner Document ID Sheet No

e & p division 00250600BIGB52031 022026-2506-SA-E-52031 7 of 7