ENI - IRAQ

ZUBAIR OIL FIELD DEVELOPMENT PROJECT

MATERIAL REQUISITION FOR


Cathodic Protection material

EX-DE 00 4/1/2017 Issue for Enquiry M.Hijazi H. Hammami C. Ialenti M. Shaker


Validity Rev.
Status Number Prepared Checked Approved Contractor Company
Date Description
by by by Approval Approval
Revision index
Company logo and business name Project name Company Identification

ZUBAIR OIL FIELD 250600DTSTDXXXZ


eni iraq b.v. DEVELOPMENT
Job N.
Contractor logo and business name Contractor Identification
OGI002-PL-XXXX-03
Contract N.

Vendor logo and business name Vendor Identification

Order N.
Facility Name Location Scale Sheet of Sheets
ZUBAIR OIL FIELD - GENERAL ONSHORE 1 of 9
Document Title Supersedes N.
Superseded by N.
MATERIAL REQUISITION FOR Cathodic Protection MATERIAL Plant area Plant unit

This document is property of eni iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

Software: Excel 2003 File name: 652547793.xls


Logo and business name of Company Document Identification Owner Document Identification Revision Index
document Owner Sheet of sheets
Validity Staus Rev. N. 2 of 9
250600DTSTDXXXZ OGI002-PL-XXXX-03 EX-DE 00

REVISION HISTORY

Rev. Date Nr. of sheets


Description

EX-DE 00 15/11/2016 9 Issue for Enquiry

Sheet Revision Number of the following drawing sheets

SHEET EX-DE 00 EX-DE 01 ---- ---- ---- ---- ----


2 X
3 X
4 X
5 X
6 X
7 X
8 X
9 X

This document is property of eni iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Logo and business name of Company Document Identification Owner Document Identification Revision Index
document Owner Sheet of sheets
Validity Staus Rev. N. 3 of 9
250600DTSTDXXXZ OGI002-PL-XXXX-03 EX-DE 00

INDEX

1- GENERAL…………………………………………………………………………………………………………… 4
2- APPLICABLE DOCUMENTS…………………………………………………………………………………….. 5
3- SUPPLIER DOCUMENTS REQUIRED…………………………………………………………………… 6
4- NOTES………………………………………………………………………………………………………………. 7
5- ITEMS TO BE SUPPLIED BY SUPPLIER……………………………………………………………… 8
6- VENDOR DOCUMENT LIST……………………………………………………………………………………… 9

This document is property of eni iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
Logo and business name of Company Document
document Owner Owner Document Identification Sheet of sheets
Identification Validity
Rev.N.
Status 4 of 9
250600DTSTDXXXZ OGI002-PL-XXXX-03 EX-DE 00
MATERIAL
GROUP CODE DESCRIPTION

For detailed scope of supply, see Sheet 5


TECHNICAL EVALUATION REQUIRED ✘ YES NO
CONTRACTOR APPLICABLE DOCUMENTS
Item Company no. Rev Contract no. Rev. DESCRIPTION

See Sheets 5

✘ IDS N° Refer to Sheet 5 REV.


SUPPLIER DOCUMENTS REQUIRED
AFTER PURCHASE ORDER
BID
ITEM DESCRIPTION FIRST ISSUE FINAL AS BUILT SCOPE
DOC.
COPY/TYPE DEL. DATE COPY/TYPE DEL. DATE COPY/TYPE NEEDED APPROV. INFO.

TECHNICAL DOCUMENTS

See Sheet 6

QUALITY DOCUMENTS
QUALITY SYSTEM DEFINITION:
WHEN APPLICABLE, THE SUPPLIER SHALL ADOPT A QUALITY MANAGEMENT SYSTEM IN ACCORDANCE WITH THE FOLLOWING:
ISO 9001: 2015 / UNI-EN ISO 9001: 2015 ✘ APPLICABLE NON APPLICABLE

Q1 ISO 9001 CERTIFICATE ✘ 1D

Q2 Quality Assurance Plan ✘ 1D 2APO 1D 6APO 1P + 1D X


Test Procedures / Quality Plan /
Q3 ✘ 1D 2APO 1D 6APO 4P + 1D X
Inspection & Test Plan (*)
Welding Procedures and Qualifications (WPS / PQR and
Q4 2APO 1D 6APO 4P + 1D X
Welding Book) (*) (if any)

Q5 Welders' and NDT Operators' Qualifications (*) (if any) 2APO 1D 6APO 4P + 1D X

Q6 Manufacturing records books (*) 2BDE 1D 4BDE 4P + 1D X X

MANAGEMENT DOCUMENTS

M1 Production Schedule ✘ 1D 2APO 1D 4APO 1D X

M2 Sub-Vendor List ✘ 1D 2APO 1D 4APO 1D X X

Inspection Management Tool and Progress Report /


M3 ✘ On Monthly Basis X
Inspection Progress Report

M4 Packing List ✘ 4BDE 1D X

M5 Sub-Vendor un-priced purchase order. ✘ 4APO 1D X

GENERAL NOTES COPIES-TYPE


1 Language to be used: ENGLISH (C) P: PRINT R: REPRODUCIBLE O: ORIGINAL D: DISK / PDF
2 Units of measure to be used: S.I. EXAMPLE : 3/P + 1/R + 1/D = 3 PRINT + 1 REPRO. + 1 DISK
3 Documents supplied for approval do not relieve the supplier from his DELIVERY DATE
obligation to fulfill each requirements of the MR and its attachments. APO: WEEKS AFTER P.O. ISSUE BFI: WEEKS BEFORE INSPECTION
BDE: WEEKS BEFORE DELIVERY AFI: WEEKS AFTER INSPECTION
SEE PAGE "NOTES" FOR FURTHER CLARIFICATION

This document is property of eni iraq B.V


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Logo and business name of Revision Index
document Owner Company Document
Owner Document Identification Sheet of sheets
Identification Validity
Rev.N.
Status 6 of 9
250600DTSTDXXXZ OGI002-PL-XXXX-03 EX-DE 00
SUPPLIER DOCUMENTS REQUIRED
AFTER PURCHASE ORDER
BID
FIRST ISSUE FINAL AS BUILT SCOPE
ITEM DESCRIPTION
DOC.
COPY/TYPE DEL. DATE COPY/TYPE DEL. DATE COPY/TYPE NEEDED APPROV. INFO.

TECHNICAL DOCUMENTS
1 Document List & Schedule 1D 1APO 1D 4BDE 4P + 1D X
2 Planning with scheduled delivery dates (*) 1D 1APO 1D 4BDE 4P + 1D X
Declaration of full compliance of the bid with this M.R.
3 1D X
and herein attached & recalled documentation

4 Deviations List (if any) with Supplier's motivation 1D X


5 Shipping
Cable Data schedule
Sheets and
with packing list
all data requested in MR and attached 1APO 1D 4BDE 4P + 1D X
6 Splicing
documents:andData
Cable Design Terminals
Sheets Cable
Specification Data Sheets
with design with all data
data, material requested in
qualities, 1APO 1D 4BDE 4P + 1D X
MR
quantities, thickness, weights, nozzles list / with
and attached documents: Data Sheets size design
/ ratingdata, material
/ quantity,
7 qualities, quantities, thickness, weights, nozzles 1D 1APO 1D 4BDE 4P + 1D X
accessories, equipment's setting plan with overalllistdimensions,
/ size / rating /
nozzles
8 quantity, accessories,
orientation, equipment's
anchor bolts distributionsetting
/ type plan with overall
/ number, supports 1D 1APO 1D 4BDE 4P + 1D X
9 dimensions,
distribution,
Recommendationsnozzlesfor
foundationorientation,
cable anchor
loads splicing
(wind, andbolts
thermal distributionetc).
expansion,
terminations / type / 3APO 1D 4BDE 4P + 1D X
number, supports distribution, foundation loads (wind, thermal
10 Recommendations
expansion, etc). for cable laying and installation 3APO 1D 4BDE 4P + 1D X
11 FAT/SAT Procedures 3APO 1D 4BDE 4P + 1D X
12 Reference List 1D X

QUALITY DOCUMENTS

See page 4

MANAGEMENT DOCUMENTS

See page 4

This document is property of eni iraq B.V


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Logo and business name of document Revision Index
Owner Company Document Identification Owner Document Identification Sheet of sheets
Validity
Rev.N.
Status 5 of 9
250600DTSTDXXXZ OGI002-PL-XXXX-03 EX-DE 00

APPLICABLE DOCUMENTS

Item Company Doc. no. Rev Contractor Doc. no. Rev. DESCRIPTION
CONTRACTOR TECHNICAL DOCUMENTS

1 250600DESTD0144 EXDE-01 OGI002-PR-0144-00 CP installation specification for W.I wells

FEED TECHNICAL DOCUMENTS

10

11

12

13

14

15

16

17

ENI STANDARD

18

GALVANIC ANODES FOR CATHODIC PROTECTION


19 27964VAR.COR.SDS
SYSTEM OF BURIED STRUCTURES

20

21

22

23

24

25

26

27

28

18

19

20

21

This document is property of eni iraq B.V


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Logo and business name of Revision Index
document Owner Company Document Identification Owner Document Identification Validity
Rev.N. Sheet of sheets
Status
7 of 9
250600DTSTDXXXZ OGI002-PL-XXXX-03 EX-DE 00

NOTES

(*) A step of payment (to be agreed with procurement) shall be subject to the first issue of the document.
(**) If required apply project standard attached to this document

1. REFERENCE DOCUMENTS ATTACHED

Documents listed at sheet 5 after approval of Company have a top priority.


The reference documents for the bid, here attached, are divided in different type. In case of conflict on technical requirements, the following
order of priority shall apply:

- Rules and Regulation (Local and Applicable International)


- Company's project technical specification
- Company's General / Functional specification
- Codes and Standards

In case of conflict on technical requirements between different standard relevant the same subject, the most stringent criteria shall apply.

Some reference documents mentioned in the project specification, may be not included in this Material Requisition,
because considered of minor impact and not critical for the technical and commercial quotation. However is the bidder
responsability to ask for any further clarification or documentation in case of need.

2. VENDOR Scope of Supply shall be in full compliance with Project Data Sheets and Specifications (as per Page 5 of this M.R.).

3. Copy of Shipping drawings shall accompany shipment.

This document is property of eni iraq B.V


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Logo and business name of Revision Index
document Owner Company Document Identification Owner Document Identification Validity Sheet of
Rev.N. sheets
Status
250600DTSTDXXXZ OGI002-PL-XXXX-03 EX-DE 00
8 of 9

ITEMS TO BE SUPPLIED BY SUPPLIER (1)

POS DESCRIPTION Q.TY Unit

Magnesium anode in backfill for temporary cathodic protection with 15m


1
1x10sqmm cable (XLPE INSULATION /PVC SHEETH black )
24 No

This document is property of eni iraq B.V


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Revision Index
Logo and business name of document
Owner Company Document Identification Owner Document Identification Validity Sheet of sheets
Rev.N.
Status 9 of 9
250600DTSTDXXXZ OGI002-PL-XXXX-03 EX-DE 00

VENDOR DOCUMENT LIST

REV. DATE

VENDOR NAME Project No:

ZUBAIR OIL FIELD


Project Title Material Requisition No:
DEVELOPMENT

Material Requisition Title Cathodic protection material Purchase Order No:

First Final
Final Client Doc. Number Ref. Item
Vendor Doc. Number Title Revision Issue Issue
(if required) MR (1)
Date Date

(1) Please indicate the Reference Item number shown in the "Vendor Document Required" Section of the MR to which the Document refers to
(1) Indicare l'item number riportato nella sezione "Vendor Document Required" della MR al quale il documento si riferisce

This document is property of eni iraq B.V.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.