Professional Documents
Culture Documents
FOR
CIVIL WORKS
2 X 351.43 MW CCPP, PIPIVAVA
M/s GSPC PIPAVAV POWER CO MPANY LTD
DOC No. QPE-CL-001
REVISION 01
DATE 03.04.2009
DGM (Quality)
TYPE OF CHECK-
P: PERFORM,
V: VISUAL CHECK,
R: REVIEW OF DOCUMENTS,
T: TEST,
M: MEASUREMENT
I : INSPECTION
NOTE:
1. Disposition authority for nonconformity within BHEL shall be as under:
Product Nonconformity: Manufacturing Unit/ Engineering Center.
Process/ System Nonconformity: Head (Quality), PSWR-NAGPUR.
2. Wherever log sheet is not called for class ‘A’ & ‘B’ checks, suitable record shall be maintained
in the form of logbook/ protocol.
3. Nonconformity is a deviation from the contract specifications/ engineering specifications.
4. In case of any nonconformity, accepting authority shall ensure disposition of nonconformity
before acceptance, and disposition shall be reflected in the log sheet/ protocol.
5. Task Performers and Inspection Authority shall ensure that instruments with valid calibration
are only used for Measurements.
6. In case of quantum of check specifically not mentioned in FQP or Reference document for any
characteristics, Quantum of check shall be 100% or as decided by approving authority.
7. As an evidence of carrying out the work satisfactorily, a general-purpose log sheet L-00 shall be
maintained for all the checks.
Project: 2 x 351.43 MW PIPAVAV CCPP
INDEX OF ACITIVITIES Doc No.: QPE-CL-001
Rev No.: 01
PSW R-QUALITY Date: 03.04.2009
SL. NO. ACTIVITY SHEET NO. FORMAT TO BE USED
01 Site Grading 01 & 02 P-01
02 Piling Works 03 & 04 P-02
03 Excavation 05 L05, Level book, Test Reports
d. Cleaning / Flushing of pile bore at three P/V -- B Random IS: 2911 -Do-
stages i.e. after completion of bore, after
lowering of reinforcement cage, and just
before placing concrete.
e. During boring of pile, record size of bore, M As required B 100% Drawing -Do-
commencement of SPT/ core recovery,
ensure socketing length equivalent in No piling
terms of the diameter of pile below the work in this
socketing horizon.
contract
f. Check for pile casting, reinforcement and P -- B 100% Drawing -Do-
pouring of sound concrete of required
strength
g. Check for pile termination level and R -- A 100% Tech. Spec. -Do-
record soil data
h. Check for pile cap-lines, levels, shape, V -- B 100% Tech. Spec. -Do-
size, reinforcement, concreting, and
curing etc,
BHEL-PSWR LEGENDS: FOR CLIENT/ CONSULTATN USE
TYPE OF CHECK- P: PERFORM, V: VISUAL CHECK, R: REVIEW OF DOCUMENTS, T: TEST, M: MEASUREMENT
CLASS OF CHECK- A: CRITICAL CHECK, B: MAJOR CHECK, C: MINOR CHECK,
INSPECTION BY BHEL: AS PER AUTHORIZATION FOR CHECKS & NONCONFORMITY DISPOSITION.
b. Check density of mud sample collected T Test Set Up B 100% Tech. Spec. -Do-
from pile
c. Check for slump test & cube test for T Slump Test B 100% Tech. Spec. / IS: 2911 -Do-
concrete. Cone
d. Check for Initial pile load test; vertical load T Dial gauge A For 3 Nos. of Tech. Spec. / IS: 2911 -Do- No piling
(compression), lateral load (horizontal), etc. each type of work in this
and pullout load (tension). pile.
Note: For compression test method, the contract
loading shall be cyclic.
e. Check for Routine pile tests, compression T -Do- A 0.5% of the Tech. Spec. / IS: 2911 -Do-
and horizontal. total piles.
Note: Routine test shall be conducted by
direct loading method.
f. Check for pile integrity tests (NDT). T NDT Kit A As specified in Tech. Spec. / IS: 2911 -Do-
Tech. Spec.
BHEL-PSWR LEGENDS: FOR CLIENT/ CONSULTATN USE
TYPE OF CHECK- P: PERFORM, V: VISUAL CHECK, R: REVIEW OF DOCUMENTS, T: TEST, M: MEASUREMENT
CLASS OF CHECK- A: CRITICAL CHECK, B: MAJOR CHECK, C: MINOR CHECK,
INSPECTION BY BHEL: AS PER AUTHORIZATION FOR CHECKS & NONCONFORMITY DISPOSITION.
1 Review of Mfr’s TC for pipes, fittings & V -- B 100% Drawing, Technical Spec. Reviewed
fixtures as per specifications/ codes. TC
R
2 Review of calibration certificates of R -- B 100% Calibration Certificate
instruments/ testing equipments.
R
4 Check for proper alignment, level, and M Measuring B 100% Drawing, Technical Spec. --
slope of each laid length. Ensure Tape, levelling
benching in excavation for safety purpose instrument I
as required.
2 Sample Testing for Type, Consistency, T Compressive B Third party Approved Technical - I/ R
fineness, Initial and final setting time, Strength test for Specifications/.IS: 1489 Part-I
Compressive strength for 7 days & 28 Testing M/C, source
days, and C3A Content, specific gravity Mould verification L-01
soundness alkali content. (Weakly lab L-02
Note: For critical RCC works, ordinary test for each L-05
Portland cement may have to be used. batch)
3 Ensure that material is stored properly to V/ P - C One sample IS: 4082 Logbook V
avoid deterioration from moisture and from each lot
contamination. received.
a. Storage in Covered sheds on raised
platforms.
b. Not more than 10 bags are stacked on
one heap to have proper access for
inspection.
c. Cement stacking consignment wise,
type and grade wise for easy
identification. Different types of
material are stored separately.
11.0 WATER
11.1 Before use, ensure that water from all T - B Once in a Approved Technical Test R
sources is potable. month per Specifications/.IS 456 Certificate
source
BHEL-PSWR LEGENDS: FOR CLIENT/ CONSULTATN USE
TYPE OF CHECK- P: PERFORM, V: VISUAL CHECK, R: REVIEW OF DOCUMENTS, T: TEST, M: MEASUREMENT
I: INSPECTION
CLASS OF CHECK- A: CRITICAL CHECK, B: MAJOR CHECK, C: MINOR CHECK,
INSPECTION BY BHEL: AS PER AUTHORIZATION FOR CHECKS & NONCONFORMITY DISPOSITION.
12.1 Review of manufacturer’s test certificate if R/ T - A Third party Approved Technical Test
sourced from approved manufacturer for test for Specifications, IS 1786, IS Certificate/
following: source 432, IS 1566 Test
a. Size and type of bars, verification Report
b. Grade of Steel, at-random
during the
c. Chemical Properties,
tenure of
d. Mechanical Properties like Tensile work as per
Strength, Elongation, Yield Stress, and
R
contract /
Bend Test. duly
Note: In case material is sourced from meeting.
other than approved manufacturer test to
be performed randomly as per IS code to
confirm above properties.
12.4 Ensure that reinforcement bars interfering M Measuring B 100% Bar Bending Schedules, Protocol
with pockets, pipes, sleeves, openings etc Tape Drawings
are not cut but suitably adjusted. I
12.5 Ensure that the joints and crossing bars P - C 100% IS 2502, Bar Bending -
are tied properly with correct size and type Schedules, Drawings
of binding wire. V
12.6 Ensure lapping of bars wherever P Measuring C 100% IS 456, Bar Bending -
necessary. Tape Schedules, Drawings V
12.7 Check for placement of reinforcement rods P Measuring C 100% Bar Bending Schedules, -
in correct position with adequate Tape Drawings
separators and adequate cover between I
reinforcement and shuttering.
13.3 Check Compressive strength and water- T Comp strength A - Do - IS: 1077 L-10, L-11
absorption capacity. Testing M/C, IS: 12894
Oven, Weigh I
Balance
3 Sieve analysis for Particle size & shape, T Sieve set B Once per weak IS Code L03, Test
Silt content, and Clay content. Report I/R
4 Moisture content T B Every day IS Code Test Report
I/R
5 a. Specific gravity, density, voids T/M Measuring B IS Code/ Test Certificates Test Report
b. Soundness & absorption Jar, Weigh Approved Tech. IS 383
c. Reaction with Alkali Balance, Oven Spec. IS 515
IS 2386
d. Deleterious materials, MICA
Once per
e. Organic Impurities source I/R
f. Mortar making properties
g. Petrography examination
(as applicable)
h. Bulking of sand
BHEL-PSWR LEGENDS: FOR CLIENT/ CONSULTATN USE
TYPE OF CHECK- P: PERFORM, V: VISUAL CHECK, R: REVIEW OF DOCUMENTS, T: TEST, M: MEASUREMENT
I: INSPECTION
CLASS OF CHECK- A: CRITICAL CHECK, B: MAJOR CHECK, C: MINOR CHECK,
INSPECTION BY BHEL: AS PER AUTHORIZATION FOR CHECKS & NONCONFORMITY DISPOSITION.
CONTRACTOR’S NAME & ADDRESS FIELD QUALITY PLAN PROJECT: 2 x 351.43 MW PIPAVAV CCPP
ITEM: CIVIL WORKS QP NO. QPE-CL-001 CLIENT: M/s GSPC PIPAVAV POWER COMPANY LTD
REV NO. 00
SUB-SYSTEM: PCC WORKS DATE: 03.04.2009
CONTRACT NO.: GPPC/EPC SELN/40401/760
PAGE: 19 OF 41
BHEL-PSWR
345, KINGSWAY, NAGPUR-440001
SL.NO. CHARACTERISTICS / ACTIVITY TYPE OF INSTRUMENT CLASS QUANTUM/ REFERENCE DOCUMENT/ FORMAT OF INSPECTION BY
CHECK OF FREQUENCY OF ACCETANCE STANDARD RECORD CLIENT
CHECK CHECK
17.0 PLAIN CEMENT CONCRETE (PCC)
1 Review of calibration certificates of R -- B 100% Calibration Certificate
instruments/ testing equipments.
R
2 Check for field calibration of instruments/ R -- B 100% Calibration Certificate
testing equipments in case of doubt or out
of calibration. I
3 Check for layout, verification of size and V Levelling A Drawing Drawing/ Technical Spec
level of excavation. Instruments I
4 Check for mix proportion (Cement, water, -- Weigh A IS 456 L03, L04
and aggregate content). Batcher, IS 10262 V
Measuring Jar
5 Ensure that area is clean and free from V -- B 100% -- --
water logging (de-watering as required). V
7 Shuttering, program of concreting, and P -- C 100% Drawing/ Technical Spec --
concreting with proper compaction. I
8 Check top level of PCC. P -- C 100% Drawing Level book
I
9 Curing of concrete as per IS/ P - B 100% Technical Spec Logbook
specifications. V
10 Review of test and inspection R B 100% Test
documents. reports R
BHEL-PSWR LEGENDS: FOR CLIENT/ CONSULTATN USE
TYPE OF CHECK- P: PERFORM, V: VISUAL CHECK, R: REVIEW OF DOCUMENTS, T: TEST, M: MEASUREMENT
I: INSPECTION
CLASS OF CHECK- A: CRITICAL CHECK, B: MAJOR CHECK, C: MINOR CHECK,
INSPECTION BY BHEL: AS PER AUTHORIZATION FOR CHECKS & NONCONFORMITY DISPOSITION.
12 Casting of adequate numbers of T Steel Moulds A IS 456 IS 456, 2911 & L05 I
specimen cube as per IS/ specifications. Technical Spec
BHEL-PSWR LEGENDS: FOR CLIENT/ CONSULTATN USE
TYPE OF CHECK- P: PERFORM, V: VISUAL CHECK, R: REVIEW OF DOCUMENTS, T: TEST, M: MEASUREMENT
I: INSPECTION
CLASS OF CHECK- A: CRITICAL CHECK, B: MAJOR CHECK, C: MINOR CHECK,
INSPECTION BY BHEL: AS PER AUTHORIZATION FOR CHECKS & NONCONFORMITY DISPOSITION.
3 Check layout/ excavation of new V/M -- C 100% Drawings & Technical Spec
foundations.
I
4 Ensure for Checking /Testing of materials. V/ T -- C 100% Technical Spec Test report
I
5 Ensure for proper Design Mix V/M -- C 100% -Do- Test report
-
6 Check for edges of shuttering, alternate V/M B 100% -Do-
panels. I
7 Check proper level, slope, and Thickness V/M Dumpy level C 100% -Do-
of flooring (Top levels) I
BHEL-PSWR LEGENDS: FOR CLIENT/ CONSULTATN USE
TYPE OF CHECK- P: PERFORM, V: VISUAL CHECK, R: REVIEW OF DOCUMENTS, T: TEST, M: MEASUREMENT
I: INSPECTION
CLASS OF CHECK- A: CRITICAL CHECK, B: MAJOR CHECK, C: MINOR CHECK,
INSPECTION BY BHEL: AS PER AUTHORIZATION FOR CHECKS & NONCONFORMITY DISPOSITION.
1 Check for brand, type & shade of paints. R/ V -- B 100% Drawing/Technical Spec TC
Review manufacturer’s test certificates
as applicable. R
1 Ensure that all pipes, fittings, and fixtures V - B 100% Tech Spec TC
are as per relevant code and of approved
brands. R