You are on page 1of 21

Mechanical Completion Checksheet

MCCR-M-14 - Pump
Golar GIMI

Project : GIMI Responsible ID : KSL

Tag No. : 40-P-8701A Tag Description : LT Fresh Water Cooling Pump

Zone : Bow Compartment Area : MR1F

SubSystem : 40.13 Location : Bow Gas Engine Room

SubSystem Description : FW Water Cooling for Bow Gas Engines & AC Units

Manufacturer: Rolls-Royce P&ID Dwg: 18002-KEP-040-P-XB-0006


Type/Model: NT 100-315 Layout Dwg: 18002-KEP-000-R-XE-0010
Type of Pump: Centrifugal Type Speed (RPM):
Capacity: 200 m3/hr @ 5 bar Discharge Pressure:

Item Description OK PL NA Comments

01 Inspection Check List


Check equipment is correctly tagged, easily readable and installed in accordance
01.01
with specifications.
Check that equipment is installed in accordance with project specification and
01.02
drawings and free from obstruction.
Check the location, elevation and orientation of the equipment is installed
01.03
correctly.
Confirm clearance around equipment is adequate for accessibility and
01.04
maintenance.
Visually inspect equipment for external damage, cleanliness, contaminants and
01.05
including paintwork.
Check equipment is correctly aligned, levelled, rigid and secured with correct
01.06 bolting and within minimum tolerances as per manufacturer’s specifications and
attach the flatness report.
Check that holding down arrangements are correct and shims undamaged, bolts
01.07 have been torqued in accordance with project specifications and attach the
torque tightening report.
Ensure the associate cables, auxiliary equipment and supported pipe lines
01.08
(including flexible) are fitted accordingly.
Check that there are no visible gaps between piping & fixed piping supports and
01.09
free from strain.
Check all gaskets are of the Correct type, bolts, nuts and washers in place and
01.10
tight and none are missing.
01.11 Confirm vibration mounting fitted securely and set to correct height.
Check that the equipment is earth bonded in accordance with the drawings and
01.12
specifications.
Check all piping, casing vent and drain lines have isolation valves fitted as per
01.13
drawings.
Check that motor/pump assembly correct, motor primed and vented, suction
01.14
strainer fitted and that the pump rotates freely by hand.
Check that all guards are fitted correctly and that the direction of rotation and
01.15
marking is correct.
01.16 Produce marked-up documents in accordance with installation where required.
Check seal and seal pot connections are installed correctly as per vendor
01.17
drawings
Check base plate drain pan connection lines are installed correctly as per
01.18
drawings.
01.19 Soft foot check has been performed where necessary.

01.20 Ensure Cooling lines are installed as per P&ID and vendor drawings

02 Reciprocating Pump / Positive Displacement Pump / Centrifugal Pump


Ensure that the filter/Strainer - Pressure rating is compatible to the line rating and
02.01
the direction of flow is correct.
02.02 Check pulsation dampers are fitted where applicable.

Printed by: CMS Admin, Aldwin. 09-Jan-2023 21:25, (ID=403842). Checklist type: MCCR-M-14, Rev: 8 page 1 of 2
Mechanical Completion Checksheet
MCCR-M-14 - Pump
Golar GIMI

Project : GIMI Responsible ID : KSL

Tag No. : 40-P-8701A Tag Description : LT Fresh Water Cooling Pump

Zone : Bow Compartment Area : MR1F

SubSystem : 40.13 Location : Bow Gas Engine Room

SubSystem Description : FW Water Cooling for Bow Gas Engines & AC Units

Manufacturer: Rolls-Royce P&ID Dwg: 18002-KEP-040-P-XB-0006


Type/Model: NT 100-315 Layout Dwg: 18002-KEP-000-R-XE-0010
Type of Pump: Centrifugal Type Speed (RPM):
Capacity: 200 m3/hr @ 5 bar Discharge Pressure:

Item Description OK PL NA Comments

02.03 Check calibration pot are installed correctly and visible where applicable.

02.04 Check constant level oiler are fitted, filled and protected where applicable.

02.05 Check lube oil, seal oil and cooling system are correct as per design.

03 Vertical CAN Pump

03.01 Check position. Pump impeller height adjusted as per vendor requirements.

03.02 Check all guide bolting is secured by lock washers or check nuts.
Check correct number of riser spools in place, installed correctly. Spool faces are
03.03
undamaged and square.
03.04 Check riser spool mounts, gaskets and guides are installed and secured.

03.05 Check riser spool stud bolts are in accordance with specifications and all fitted.

03.06 Check spider restraints are correct to drawing.

03.07 Check delivery head flange to caisson is secure.


Check headroom for spool removal and that the Mechanical Handling equipment
03.08
is adequate for pump removal.

Comments/Remarks:

Electronic Signature
Completed by Vendor/KSL Approved by KSL Accepted by Golar Witnessed by DNV
Company Keppel Shipyard Ltd Keppel Shipyard Ltd Golar NA

Name Naidu, Suresh Naidu, Suresh Mohamin, Wahidin

Date 07-Jan-2023 05:19:00 07-Jan-2023 05:19:00 07-Jan-2023 05:20:00

Signature: Not Applicable

Printed by: CMS Admin, Aldwin. 09-Jan-2023 21:25, (ID=403842). Checklist type: MCCR-M-14, Rev: 8 page 2 of 2
CWP NO: C140-CWP-00GN-L01
CLIENT :

Golar LNG
DRAWN : AM TITLE : CLIENT DWG NO. :
06 14.03.22 LQ NO PL RE-ISSUED FOR CONSTRUCTION (REFERENCE TO MR COMMENT NO. 1919) 18002-ROR-080-L-XB-0002 LOW TEMPERATURE SYSTEM DATE : 27.06.2018 P&ID -
05 12.11.19 AM NO PL RE-ISSUED FOR CONSTRUCTION (P&ID FROZEN AS PER GOLAR-KEPPEL MEETING) 18002-ROR-080-L-XB-0003 HIGH TEMPERATURE SYSTEM SCALE : AS SHOWN 18002-KEP-040-P-XB-0006
04 05.07.19 AM NO PL ISSUED FOR CONSTRUCTION (UPDATED AS PER GOLAR COMMENT) 18002-KEP-051-P-XB-0002 P&ID - BILGE SYSTEM - BOW AREA
FRESH WATER COOLING SYSTEM
CHKD : CZ SHEET 1 OF 3
03 18.12.18 AM NO PL ISSUED FOR APPROVAL 18002-KEP-069-P-XB-0003 P&ID - LUBE OIL SYSTEM - GAS GENERATOR SET
MAIN CODE : SS01G/00004
GAS GENERATOR SET REV. NO. : 06
02 28.09.18 JR JH PL ISSUED FOR FEED 18002-KEP-050-P-XB-0006 P&ID - SEA WATER COOLING SYSTEM - GAS GENERATOR SET
01 27.06.18 AM CZ PL ISSUED FOR APPROVAL 18002-KEP-000-L-SA-0002 PIPING SPECIFICATION - MARINE SYSTEM
This document is the property of VESSEL :
NO. DATE BY CHKD. APPD.
REVISIONS
DESCRIPTION DWG. NO. TITLE
Keppel Shipyard. It is not to be
copied nor shown to a third party
without prior consent.
Shipyard GOLAR GIMI FLNG
REFERENCE DRAWINGS
ACAD DRAWING A1 SIZE
GAS ENGINE NO. 1 GAS ENGINE NO. 2

CWP NO: C140-CWP-00GN-L01


CLIENT :

Golar LNG
DRAWN : AM TITLE : CLIENT DWG NO. :
06 14.03.22 LQ NO PL RE-ISSUED FOR CONSTRUCTION (REFERENCE TO MR COMMENT NO. 1919) 18002-ROR-080-L-XB-0002 LOW TEMPERATURE SYSTEM DATE : 27.06.2018 P&ID -
05 12.11.19 AM NO PL RE-ISSUED FOR CONSTRUCTION (P&ID FROZEN AS PER GOLAR-KEPPEL MEETING) 18002-ROR-080-L-XB-0003 HIGH TEMPERATURE SYSTEM SCALE : AS SHOWN 18002-KEP-040-P-XB-0006
04 05.07.19 AM NO PL ISSUED FOR CONSTRUCTION (UPDATED AS PER GOLAR COMMENT) 18002-KEP-051-P-XB-0002 P&ID - BILGE SYSTEM - BOW AREA
FRESH WATER COOLING SYSTEM
CHKD : CZ SHEET 2 OF 3
03 18.12.18 AM NO PL ISSUED FOR APPROVAL 18002-KEP-069-P-XB-0003 P&ID - LUBE OIL SYSTEM - GAS GENERATOR SET
MAIN CODE : SS01G/00004
GAS GENERATOR SET REV. NO. : 06
02 28.09.18 JR JH PL ISSUED FOR FEED 18002-KEP-050-P-XB-0006 P&ID - SEA WATER COOLING SYSTEM - GAS GENERATOR SET
01 27.06.18 AM CZ PL ISSUED FOR APPROVAL 18002-KEP-000-L-SA-0002 PIPING SPECIFICATION - MARINE SYSTEM
This document is the property of VESSEL :
NO. DATE BY CHKD. APPD.
REVISIONS
DESCRIPTION DWG. NO. TITLE
Keppel Shipyard. It is not to be
copied nor shown to a third party
without prior consent.
Shipyard GOLAR GIMI FLNG
REFERENCE DRAWINGS
ACAD DRAWING A1 SIZE
GAS ENGINE NO. 1 GAS ENGINE NO. 2

CWP NO: C140-CWP-00GN-L01


CLIENT :

Golar LNG
DRAWN : AM TITLE : CLIENT DWG NO. :
06 14.03.22 LQ NO PL RE-ISSUED FOR CONSTRUCTION (REFERENCE TO MR COMMENT NO. 1919) 18002-ROR-080-L-XB-0002 LOW TEMPERATURE SYSTEM DATE : 27.06.2018 P&ID -
05 12.11.19 AM NO PL RE-ISSUED FOR CONSTRUCTION (P&ID FROZEN AS PER GOLAR-KEPPEL MEETING) 18002-ROR-080-L-XB-0003 HIGH TEMPERATURE SYSTEM SCALE : AS SHOWN 18002-KEP-040-P-XB-0006
04 05.07.19 AM NO PL ISSUED FOR CONSTRUCTION (UPDATED AS PER GOLAR COMMENT) 18002-KEP-051-P-XB-0002 P&ID - BILGE SYSTEM - BOW AREA
FRESH WATER COOLING SYSTEM
CHKD : CZ SHEET 3 OF 3
03 18.12.18 AM NO PL ISSUED FOR APPROVAL 18002-KEP-069-P-XB-0003 P&ID - LUBE OIL SYSTEM - GAS GENERATOR SET
MAIN CODE : SS01G/00004
GAS GENERATOR SET REV. NO. : 06
02 28.09.18 JR JH PL ISSUED FOR FEED 18002-KEP-050-P-XB-0006 P&ID - SEA WATER COOLING SYSTEM - GAS GENERATOR SET
01 27.06.18 AM CZ PL ISSUED FOR APPROVAL 18002-KEP-000-L-SA-0002 PIPING SPECIFICATION - MARINE SYSTEM
This document is the property of VESSEL :
NO. DATE BY CHKD. APPD.
REVISIONS
DESCRIPTION DWG. NO. TITLE
Keppel Shipyard. It is not to be
copied nor shown to a third party
without prior consent.
Shipyard GOLAR GIMI FLNG
REFERENCE DRAWINGS
ACAD DRAWING A1 SIZE
Machine alignment information

Location: Bow area 12. 7 m Deck


Asset ID: 40-P-8701A Final
Operator: Dexter
Notes: GEG 1 LT FW COOLING PUMP ( 40-P-8701A) FINAL ALIGNMENT

Dimensions mm

Measurements mm

40-P-8701A Final 03.01.2023 13.13.50.pdf 03.01.2023 1/2


Results mm

Tolerances mm

Dexter

06/01/23
Hari prasath
04-Jan-2023

40-P-8701A Final 03.01.2023 13.13.50.pdf 03.01.2023 2/2


Rev-4A
Reviewed on
Md Fizul Rajesh kanna 16 Aug 2021
15-08-2021 15-08-2021
GOLAR GIMI FLNG
CWP NO: CWP- 12BW-R03

Issued for As Built 03Z 21.10.2020 TLewis OKa PIB


Issued for Approval 02 11.03.2020 TLewis OKa PIB
Issued for Approval 01 23.07.2019 TLewis TLewis TLewis
REASON FOR ISSUE REVISION REV. DATE PREP. BY CHECKED APPROVED

VENDOR LOGO PROJECT: 18002 GOLAR GIMI FLNG PAGES


Vendor Project no.: SS01G-00004-19-0002
Vendor Company: Kongsberg Maritime CM AS
1 OF 21
Contract / PO no.: 4100083652

DOCUMENT TITLE

LT cooling water stand by pumps


TAG NO.: TBC
PACKAGE/EQUIPMENT: GAS ENGINE GENERATOR
SYSTEM CODE: 80
DISCIPLINE CODE: R - Mechanical TYPE CODE: XV - Eq.& Component drawing

VENDOR DOCUMENT NUMBER: F 216_32 A


GOLAR DOCUMENT NUMBER: 18002-ROR-080-R-XV-0003 03Z
Project number Vendor code System, Discipline Sequence Current
& number Revision
Doc. Type
F 216_32 I
I – Installation documentation D – Operation/maintenance documentation S – Service (Internal use only)

Component: Cooling water pump


Type: Centrifugal Pump NT 100-315/01/330 U3.30D-W10

BEAS part no.: B01040100

05.03.2020 A TLewis OKa


DATE REV. MADE BY CHK. BY APPROVED BY

Bergen Engines AS, a Rolls-Royce Power Systems Company


P.O.Box. 3 Hylkje, 5877 Bergen, Norway, Switchboard +47 55 53 60 00, E-mail: engines.bergen@rolls-royce-bergen.com
Construction Checksheet

Vessel Name: Golar GIMI FLNG RFI Report No: G00004-SM-B-VI-MR1F-01530 Rev: 0

To: Owner Rep / Class Surveyor Name of Requestor: Win, Tun

Description: Foundation bolts tightening inspection for LT FW cooling pump (40-P-8701A)

Drawing No: 18002-KEP-000-R-XE-0010 Rev 05

Date of Inspection: 01-Dec-2021 Time of Inspection: 10:40 Location of Inspection: Bow Machinery Rm (12700 ABL)

Owner Inspection: Yes Class Survey Inspection: No Joint Inspection: Yes

1 Type of Inspection

Material Verification Final Line Check

Mechanical Fit Up Inspection

Visual Inspection Electrical

Back Gouging Hydrostatic Test

Others (Please State) Bolts tightening

Long Description:

Comments/Remarks:
Inspection has been verified and accepted by Golar.

Electronic Signature
Inspected By QC/Rep Inspected By KSL Inspected By Golar Inspected By DNVGL
Company Keppel Shipyard Ltd Keppel Shipyard Ltd Golar NA

Name Sanjay, Kumar Mon, Aung Mechanical Inspector, Shafiqul MD

Date 08-Dec-2021 22:55:00 08-Dec-2021 23:00:00 08-Dec-2021 23:41:00

Signature: Not Applicable

Printed by: Mon, Aung. 08-Dec-2021 07:45, (ID=403741). page 1 of 1