You are on page 1of 24

LAMPIRAN GAMBAR

PUMP PIT
PERENCANAAN PEMBANGUNAN JARINGAN PERPIPAAN AIR LIMBAH
DI JALAN KOTA DAN LINGKUNGAN
DINAS PEKERJAAN UMUM KOTA SEMARANG

SISTEM PENGELOLAAN AIR LIMBAH DOMESTIK TERPUSAT (SPALD-T) SKALA PERKOTAAN


DI KOTA SEMARANG

2022
REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

TIMUR
KANAL
I BANJIR
RITO
Rev Date Drawn Description Ch’k’d App’d

JL. BA
Owner

SUNGA
MINISTRY OF PUBLIC WORKS
AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant

WW-07

ACKNOWLEDGED RINALDY PRADANA S.T. MSc


(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
JL

APPROVED NINGRUM, ST, M.Env


(HEAD OF TECHICAL TEAM)
.C

NIP : 198510112009122001
IT

GRAHAM RETTKE
APPROVED
AR

PIPE B Team Leader

RIDGE
UM

Legend

DRAWING TITLE :

PLAN OF WW-07

SCALE
NAME DATE

DRAWN
1 : 500
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
8400
CENTRAL JAVA, INDONESIA

250 7900 250 KEY PLAN


N

345 15
30
330
45

315
250

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

5100
TANKI GENSET NOTES

250
PANEL ELECTRICAL

Rev Date Drawn Description Ch’k’d App’d

3350
Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant

250
MECHANICAL BAR SCREEN

3000

21769
C
ACKNOWLEDGED RINALDY PRADANA S.T. MSc
(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA

500
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001
ANCHOR M16
500

GLOBE VALVE
1 GRAHAM RETTKE
Ø 89 Cast Iron DN 250 APPROVED Team Leader
DN 250
Legend

UNP 300x100x16
500
L = 6222

L = 6222
U Bolt 250A 10"

DN 250

274 INLET PIPE RCP B B


UNP 300x100x16 DN 1200

U Bolt 250A 10"


1000

1%
2200
312
DN 200

20 PRESSURE RELIEF
Ø7 UNP 300x90x16 Cast Iron DN 250
500

U Bolt 200A 8" GLOBE VALVE


DN 200 Cast Iron DN 200

A A
UNP 300x90x16
500

U Bolt 200A 8"


500

W = 4000
C

W=4000 PRESSURE RELIEF


Cast Iron DN 200

D D
2100

TO PIPE BRIDGE
PUMP LAYOUT 1
500

DRAWING TITLE :

C
4300
PUMP LAYOUT OF WW-07

PUMP LAYOUT 2 SCALE


NAME DATE

DRAWN
1 : 100
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

MECHANICAL BAR SCREEN


Rev Date Drawn Description Ch’k’d App’d
Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
8400 ENVIRONMENTAL SANITATION

FL 4 500 1500 274 2100 626 2900 500 FL 4 4000 Project Preparation Consultant
GROUND LEVEL GROUND LEVEL
+2.020 +2.020

350
2016
FL 3 FL 3

1670
400
±0.000 ±0.000
545

ACKNOWLEDGED RINALDY PRADANA S.T. MSc


(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
TOP OF RAILING SAFETY RAILING (HEAD OF TECHICAL TEAM) NIP : 198510112009122001
-1.690
GRATING FLOOR
FLOOR LEVEL FLOOR LEVEL GRAHAM RETTKE
IWF 200x100x5.5x8mm APPROVED Team Leader
-2.590 -2.590
GRATING FLOOR GRATING FLOOR
-2.590 -2.590
Legend

FL 2 FL 2

FLEXIBLE PIPE COUPLINGS


Cast Iron DN 200

CHECK VALVE
Cast Iron DN 200
300

INLET & FREE BOARD FB INLET & FREE BOARD FB


-5.090 -5.090
HIGH WATER LEVEL HWL HIGH WATER LEVEL HWL
-5.390 -5.390
1500 300
200
250

FL 1 FL 1
H = 3000

LOW WATER LEVEL LWL LOW WATER LEVEL LWL


-6.890 -6.890

1595
1544

235
215

TOP PILECAP TOP PILECAP


-8.390 460 -8.390 750
1193
806

BOTT. PILECAP BOTT. PILECAP


-9.390 -9.390

SECTION A-A SECTION B-B DRAWING TITLE :

SECTON A-A & B-B OF WW-07

SCALE
NAME DATE

DRAWN
1 : 100
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

Rev Date Drawn Description Ch’k’d App’d


Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant

L = 6222 500 3800 500

350
GIP PIPE DN 600
From Pumps
3247 HDPE PIPE DN 600

1670
+0.345

625
GROUND LEVEL
±0.000
500 ACKNOWLEDGED RINALDY PRADANA S.T. MSc
(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE

GRATING FLOOR SECTION D-D APPROVED Team Leader

FLOOR LEVEL
Legend
-2.590

BAR SCREEN
Bar Size :
Width : 20 mm
Depth : 30 mm
Clear Spacing : 100 mm
Slope : 75° INLET PIPE RCP DN 1200

GIP PIPE DN 250 GIP PIPE DN 200

SINGLE PUMP SINGLE PUMP

Max Flow : 298 l/s Max Flow : 280 l/s


Power : 56 kW 500 500 Power : 62 kW
Weight : 1300 kg Weight : 965 kg
Flange : DN 250 c/w. C 500 1000 500 Flange : DN 200 c/w. C

SECTION C-C DRAWING TITLE :

SECTION C-C & D-D OF WW-07

SCALE
NAME DATE

DRAWN
1 : 100
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

5000 5000
1800 2200
W = 4000

300
Rev Date Drawn Description Ch’k’d App’d
Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF

1500
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant


L = 6222

MECHANICAL
7222

7222
FLOOR LEVEL BAR SCREEN
SPOT FLOOR LEVEL
-8.390 ACKNOWLEDGED
-8.390 (OFFICIAL AUTHORIZED
RINALDY PRADANA S.T. MSc
NIP : 198607112009121001
TO COMMIT)

4722
MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend

FLOOR LEVEL
-5.090

FLOOR PLAN (FL1) FLOOR PLAN (FL2)

DRAWING TITLE :

FLOOR PLAN (FL1 & FL2) OF WW-07

SCALE
NAME DATE

DRAWN
1 : 75
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

FLOOR LEVEL
+2.020

NOTES

FLOOR LEVEL Rev Date Drawn Description Ch’k’d App’d


+2.020 Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant

FLOOR LEVEL
+2.020

8800
500 1500 2500 500 3700 500 ACKNOWLEDGED RINALDY PRADANA S.T. MSc
(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

500
MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend
2945

3000
1445

RAILING
t=5mm, H=900mm

6722
538

6722
GRATING FLOOR
FLOOR LEVEL FLOOR LEVEL
Serrated Surface
-2.590 -0.080
9822

3222
2740

1885
500

500

500

500 W = 4000 0
2100

2100

2200
500

500

500 3800 500 500 500 2900 400 DRAWING TITLE :


500 W=4000 3800 500

FLOOR PLAN (FL3) & TOP PLAN OF WW-07


FLOOR PLAN (FL3) FLOOR PLAN (FL4)
SCALE
NAME DATE

DRAWN
1 : 75
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

.52
+0
EL

.52
+0
EL

GV
DN
25 PR .52
0 DN +0
25 EL
0 NOTES
GV 0 .52
DN
EL+
25
0
PR
DN
2 50 TO
PIP
GV EB
DN RID
20 GE
0 P 00
R
DN N6
ED
20
0 E PIP
P
GV HD
DN
20
0 P
R
DN
20
0
0
60
N Rev Date Drawn Description Ch’k’d App’d
IPED Owner
PP
GI MINISTRY OF PUBLIC WORKS
AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
GA HUMAN SETTLEMENTS
DEVELOPMENT
L VA DIRECTORATE OF
BANK
NI
ZE ENVIRONMENTAL SANITATION
CV D
IR
DN ON Project Preparation Consultant
25 PIP
0 ED
N
25
CV 0
D N
25
0 GA
LV
AN
IZE
CV D
IR
DN ON
20 PIP
0 ED
N
CV 20
0
DN
20
0
ACKNOWLEDGED RINALDY PRADANA S.T. MSc
(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

8.28
GRAHAM RETTKE
E L- APPROVED Team Leader

Legend
-8.28
EL

27
-8.
EL

27
-8.
EL

ISOMETRIC WW-07

DRAWING TITLE :

ISOMETRIC OF WW-07

SCALE
NAME DATE

DRAWN
1 : 75
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

C D
NOTES

Rev Date Drawn Description Ch’k’d App’d


Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant

ACKNOWLEDGED RINALDY PRADANA S.T. MSc


(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)
2
MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend

B
1

POTONGAN - 4

POTONGAN - A

DRAWING TITLE :

STRUCTUR PLAN OF WW-07

SCALE
NAME DATE

DRAWN
1 : 75
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

Rev Date Drawn Description Ch’k’d App’d


Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

POTONGAN - B Project Preparation Consultant

ACKNOWLEDGED RINALDY PRADANA S.T. MSc


(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend

POTONGAN - D

POTONGAN - C

DRAWING TITLE :

STRUCTUR PLAN OF WW-07

SCALE
NAME DATE

DRAWN
1 : 75
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

Rev Date Drawn Description Ch’k’d App’d


Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant

ACKNOWLEDGED RINALDY PRADANA S.T. MSc


(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend

POTONGAN - 1 POTONGAN - 2 POTONGAN - 3

DRAWING TITLE :

STRUCTUR PLAN OF WW-07

SCALE
NAME DATE

DRAWN
1 : 75
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330

3640
45

315

nw

ne
300

60
285

75
W

E
105
JENDELA KACA

255
240

120
se

sw
225

135
150
210 165
195

500
TANKI
Dimension L.W.H (mm) : 4000x1350x1900
Capacity : 30240 L

2425
GENSET CATERPILLAR
Model : IW250WS
Capacity : 250 kW
Weight : 3150 kg

NOTES

811 500 1080

2425
SUPPORT

1150
H = 1000mm
Overlap = 100-150mm

Rev Date Drawn Description Ch’k’d App’d


PANEL ELECTRICAL
Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

1820
Project Preparation Consultant
PINTU JENDELA

3200

GRATING FLOOR
Serrated Surface
3000

Size : 995mm (wide) x 5800mm (span)

ACKNOWLEDGED RINALDY PRADANA S.T. MSc


(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend

Hoist Cap. 5 Tons

C-Rail with flat Cable for power supply

C-Rail with flat Cable for Mobile pendant

DRAWING TITLE :

EQUIPMENT LAYOUT OF WW-07

EQUIPMENT LAYOUT SCALE


NAME DATE

DRAWN
1 : 100
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

IRON DOOR

IRON DOOR
NOTES
TANKI

GENSET

IRON DOOR
IRON DOOR

Rev Date Drawn Description Ch’k’d App’d


Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF

IRON DOOR
ENVIRONMENTAL SANITATION

Project Preparation Consultant

GLASS DOOR

IRON DOOR

ACKNOWLEDGED RINALDY PRADANA S.T. MSc


(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

MECHANICAL
Legend
BAR SCREEN

DRAWING TITLE :

DOOR LAYOUT OF WW-07

SCALE
DOOR LAYOUT NAME DATE

DRAWN
1 : 100
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

EL 2
345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

+10.243 S

+9.860
+9.697

+9.241
LADDER TRAY
Material : Hot Deep Galvanized
Size : 250x100mm +8.764

+7.470 NOTES
+7.070
TANKI GENSET
400

500
1000 H=2000mm, L=800mm, D=600mm

MVMDP LVMDP COS MCC CABLE TRAY


1000 kg 1000 kg 500 kg 1000 kg Material : Hot Deep Galvanized Rev Date Drawn Description Ch’k’d App’d
Size : 250x100mm Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

250
Project Preparation Consultant
GROUND LEVEL
+2.020

±0.000

ACKNOWLEDGED RINALDY PRADANA S.T. MSc


(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend

EL 1 EL 1
EL 2

BOTT. PILECAP
-9.390

SECTION EL-1
DRAWING TITLE :

ELECTRICAL LAYOUT & SECTION EL-1


OF WW-07

ELECTRICAL LAYOUT SCALE


NAME DATE

DRAWN
1 : 100
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

+10.243

+9.860

+9.241

+8.335

NOTES

+7.470

+7.070

Rev Date Drawn Description Ch’k’d App’d


Owner

GENSET MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

PANEL Project Preparation Consultant

250
GROUND LEVEL
+2.020

±0.000
ACKNOWLEDGED RINALDY PRADANA S.T. MSc
(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend

BOTT. PILECAP
-9.390

DRAWING TITLE :
SECTION EL-2
SECTION EL-2 OF WW-07

SCALE
NAME DATE

DRAWN
1 : 100
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

Rev Date Drawn Description Ch’k’d App’d


Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant

ACKNOWLEDGED RINALDY PRADANA S.T. MSc


(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend

DRAWING TITLE :

PLAN OF WW-11

SCALE
NAME DATE

DRAWN
1 : 50
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

B
4660

Rev Date Drawn Description Ch’k’d App’d


Owner

500
MINISTRY OF PUBLIC WORKS
AND HOUSING
1000 1000 ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
197

DIRECTORATE OF
79 ENVIRONMENTAL SANITATION
Ø3 ANCHOR M12
DN 100 Project Preparation Consultant
UNP 300x100x16
U Bolt 100A 4"
384

A A
ANCHOR M12

L = 2290
L=2290

3290

2000

2000
DN 100
UNP 300x100x16
U Bolt 100A 4"
384

ANCHOR M12
ACKNOWLEDGED RINALDY PRADANA S.T. MSc
DN 100 (OFFICIAL AUTHORIZED NIP : 198607112009121001
UNP 300x100x16 TO COMMIT)

U Bolt 100A 4" MAHARDIANI KUSUMA


197

APPROVED NINGRUM, ST, M.Env


(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

500
GRAHAM RETTKE
APPROVED Team Leader

Legend

W=2300 500 W = 2300 500 1860 500

B 5660

PUMP LAYOUT (PL) TOP PLAN FOR WW-11

DRAWING TITLE :

TOP PLAN & PUMP LAYOUT OF WW-11

SCALE
NAME DATE

DRAWN
1 : 50
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

500 W=2300 500 1860 500


500 L=2300 500

975 1000 628 430 1000 465


150 2000 150
GROUND LEVEL
+1.600

350
350
NOTES

C C

1250
+0.475

TAHAP 1B

TAHAP 1B
FL FL

Rev Date Drawn Description Ch’k’d App’d


Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant

Inlet DN200 Inlet DN200 PVC DN 100

INLET DN200 PVC FLANGE


-2.460 DN 100

Inlet DN300 Inlet DN300 ACKNOWLEDGED RINALDY PRADANA S.T. MSc


(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)
TAHAP 1B

FLEXIBLE RUBBER JOINT TAHAP 1B TAHAP 1B TAHAP 1B

MAHARDIANI KUSUMA
DN 100 APPROVED
(HEAD OF TECHICAL TEAM)
NINGRUM, ST, M.Env
NIP : 198510112009122001

INLET DN300 & FREE BOARD FB APPROVED


GRAHAM RETTKE
Team Leader
-3.700
300

Legend
HIGH WATER LEVEL HWL CHECK VALVE (CV)
-5.500 Cast Iron DN 100

PL PL
H = 1500

100
SINGLE PUMP
LOW WATER LEVEL LWL Max Flow : 34.7 l/s
-5.500 Power : 4.9 kW
197 384 384 197
Weight : 180 kg
Flange : DN 100 H or V
TOP PILECAP
-6.300

BOTT. PILECAP
-7.300

DRAWING TITLE :

SECTION A-A & B-B OF WW-11

SECTION A-A
SECTION B-B
SCALE
NAME DATE

DRAWN
1 : 50
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

5660
2300 2360

Rev Date Drawn Description Ch’k’d App’d


Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
GLOBE VALVE (GV) DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
Cast Iron DN 100 BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION
197

79 Project Preparation Consultant


Ø3 TAHAP 1B

To MH-0394
384

FLOOR LEVEL FLOOR LEVEL

3290
HDPE PIPE DN 150
-6.300 +0.100
TAHAP 1B

TAHAP 1B

2790
PVC PIPE DN 250
384

ACKNOWLEDGED RINALDY PRADANA S.T. MSc


(OFFICIAL AUTHORIZED NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
TAHAP 1B

TAHAP 1B

(HEAD OF TECHICAL TEAM) NIP : 198510112009122001


197

GRAHAM RETTKE
APPROVED Team Leader

Legend

SECTION C-C
FLOOR PLAN FOR WW-11 (FL)

DRAWING TITLE :

SECTION C-C & FLOOR PLAN OF WW-11

SCALE
NAME DATE

DRAWN
1 : 50
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

94
H -03
ToM
.10
+0 0
EL 15
DN
NOTES
.10
E +0
E PIP EL
P
HD .10
+0
EL
00
DN1 PV
V CP
G 0 IPE
10 DN
DN 25
GV 0 0
10
N
G VD
Rev Date Drawn Description Ch’k’d App’d
Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant

PV
CP
IPE
DN
10
0
CV
DN
10
0
CV
DN ACKNOWLEDGED
10 RINALDY PRADANA S.T. MSc
0 (OFFICIAL AUTHORIZED NIP : 198607112009121001
CV TO COMMIT)

DN MAHARDIANI KUSUMA
10 APPROVED NINGRUM, ST, M.Env
0 (HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend

0
- 6.3
EL
3 0
-6.
EL
0
- 6.3
EL

ISOMETRIC WW-11

DRAWING TITLE :

ISOMETRIC OF WW-11

SCALE
NAME DATE

DRAWN
1 : 50
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

TAHAP 1B

TAHAP 1B
Rev Date Drawn Description Ch’k’d App’d
Owner

MINISTRY OF PUBLIC WORKS


AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant

POTONGAN - 1
ACKNOWLEDGED RINALDY PRADANA S.T. MSc
(OFFICIAL AUTHORIZED
TAHAP 1B

NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend

DRAWING TITLE :

POTONGAN - 2
POTONGAN - A STRUCTUR PLAN OF WW-11

SCALE
NAME DATE

DRAWN
1 : 50
DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

CONTROL ROOM
AREA

LARGE DISPLAY
PUMP PIT
SEWER LINE
MONITOR Rev
Owner
Date Drawn Description Ch’k’d App’d

20" MINISTRY OF PUBLIC WORKS


AND HOUSING
M pH NH3 O2 CO2 ASIAN

RTU / 4G kWH TSS DIRECTORATE GENERAL OF


DEVELOPMENT
HUMAN SETTLEMENTS
BANK

ENERGY MONITOR
DIRECTORATE OF

ANOMIA SENSOR

CO/CO2 SENSOR
ENVIRONMENTAL SANITATION

SUBMERSIBLE
Project Preparation Consultant

TSS SENSOR

PH SENSOR

O2 SENSOR
PUMP
SERVER 01

SWITCH/HUB ROUTER/MODEM
ACKNOWLEDGED
(OFFICIAL AUTHORIZED
RINALDY PRADANA S.T. MSc
NIP : 198607112009121001
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

Legend

HMI HMI HMI HMI

M M M M M M M
M COD pH BOD TSS NH3
SOLID
LEVEL TRANSMITTER

LEVEL TRANSMITTER

LEVEL TRANSMITTER
SLUDGE & SLURRY

OPERATED VALVE

OPERATED VALVE

OPERATED VALVE

OPERATED VALVE
SUMP PIT SLUDGE

SUMP PIT SLUDGE

SUMP PIT SLUDGE


SLURRY SLUDGE

SLUDGE
BLOWER AERASI

BLOWER AERASI

BLOWER AERASI

ANOMIA SENSOR
GRIT CHAMBER

GRIT CHAMBER

GRIT CHAMBER

DEWATERING

SLUDGE PUMP
TRANSMITTER

TRANSMITTER

TRANSMITTER
SLUDGE PUMP

MOTOR SCRAPER 5 KW
FLOW METER

FLOW METER

FLOW METER
FINE SCREEN

COD SENSOR
FLOWMETER

BOD SENSOR
MOTORiZED

TSS SENSOR
MOTORIZED

MOTORIZED

MOTORIZED

MOTORIZED

MOTORIZED
MOTORIZED

MOTORIZED

PH SENSOR
PRESSURE

PRESSURE

PRESSURE
PENSTOCK

PENSTOCK

PDZ PUMP
REMOVAL
FM-RW-01

SCREAP
MOTOR

MOTOR
COARSE
SCREEN

DEBRIS
SOLAR DRYER BED
PUMP
PUMP

PUMP

PUMP

PUMP

20x50 m

INLET COARSE PRIMARY AERATION SECONDARY DISINFECTANT OUT FLOW GRAFITY DEBRIS DEWATERING &
AREA SCREEN CLARIFIER AREA CLARIFIER THICKENER REMOVAL SCREW PRESS
DRAWING TITLE :
AREA
SCADA SYSTEM

SCALE
NAME DATE

DRAWN

DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


REVISION 24/10/2022
ACCELERATING INFRASTRUCTURE
DELIVERY THROUGH BETTER
ENGINEERING SERVICE PROJECT (ESP)

DETAILED DESIGN FOR THE WASTEWATER


MANAGEMENT SYSTEM IN SEMARANG CITY,
CENTRAL JAVA, INDONESIA

KEY PLAN
N

345 15
30
330
45

315

nw

ne
300

60
285

75
W

E
105
255
240

120
se

sw
225

135
150
210 165
195

NOTES

RTU RTU RTU RTU RTU


Ai01 Ai02 Ai03 Ai03 Ai03

Rev Date Drawn Description Ch’k’d App’d


Owner

PT pH TssNH3 FM
MINISTRY OF PUBLIC WORKS
AND HOUSING
ASIAN
DIRECTORATE GENERAL OF
DEVELOPMENT
HUMAN SETTLEMENTS
BANK
DIRECTORATE OF
ENVIRONMENTAL SANITATION

Project Preparation Consultant

RTU
Ai03

RTU RTU
Ai03 Ai03
HH
H ACKNOWLEDGED
(OFFICIAL AUTHORIZED
RINALDY PRADANA S.T. MSc
NIP : 198607112009121001

O2 CO2
TO COMMIT)

MAHARDIANI KUSUMA
APPROVED NINGRUM, ST, M.Env

L
(HEAD OF TECHICAL TEAM) NIP : 198510112009122001

GRAHAM RETTKE
APPROVED Team Leader

LT
Legend

Max Flow : 298 l/s Max Flow : 298 l/s Max Flow : 280 l/s Max Flow : 280 l/s
Power : 56 kW Power : 56 kW Power : 62 kW Power : 62 kW
Weight : 1300 kg Weight : 1300 kg
Weight : 965 kg Weight : 965 kg
Flange : DN 250 c/w. C Flange : DN 250 c/w. C Flange : DN 200 c/w. C Flange : DN 200 c/w. C
DRAWING TITLE :

PIPING AND INSTRUMENTATION DIAGRAM

SCALE
NAME DATE

DRAWN

DWG CHECK

ENG CHECK
DRAWING NUMBER

CAD FILE NAME REV. STATUS


2022

You might also like