You are on page 1of 1

S1 S2

AMOUNT: 60
AMOUNT: 8

4 4

30 25

25
30 25
30 25

25
30 25

55
55

30
30

6
6
6

6
6

338
228

228

228
338
228

228

228
4-Ø15 4-Ø15

338

338
4-Ø15 4-Ø15

21
21

Ø
Ø

6
6

6
6

25 30

25 30

30
25 30

25 30

30

55
55

25
25
25 50 25 25 50 25 25 50 25 25 50 25
100 100 100 100

2-FB 100x6x459 2-FB 100x6x459


2-FB 100x6x243 2-FB 100x6x843
4-BN M12x35(2-W) 4-BN M12x35(2-W)
4- IMPULSIVE ANCHOR M12x125 4- IMPULSIVE ANCHOR M12x125

114 114 114 114

25 50 25
25 50 25

100
100

6 6 6 6 6 6
200 800

S3
AMOUNT: 7 S4
AMOUNT: 1

4
30 25

25
30 25

4
55

30 25

25
30 25
30
6

55

30
6
6

6
6
228

228

228
338

338

4-Ø15 4-Ø15
21
Ø

6
338
228

228

228
338
4-Ø15 4-Ø15

21
Ø
6
6

6
25 30

25 30

30
55

6
25 30

25 30

30
25

55

25
25 50 25 25 50 25
100 100 25 50 25 25 50 25
100 100
2-FB 100x6x459
2-FB 100x6x293 2-FB 100x6x459
4-BN M12x35(2-W) 2-FB 100x6x893
4- IMPULSIVE ANCHOR M12x125 4-BN M12x35(2-W)
4- IMPULSIVE ANCHOR M12x125
114 114
114 114
NOTE:
25 50 25

PURSUANT TO ITEM 5 OF ANNEX 'A' OF THE REVISED IMPLEMENTING RULES


100

25 50 25
AND REGULATION OF R.A. 9184, THE APPROVAL BY THE AUTHORIZED

100
GOVERNMENT OFFICIALS OF DETAILED ENGINEERING SURVEYS AND DESIGNS
UNDERTAKEN BY CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF
THE LATTER FOR THE TECHNICAL INTEGRITY OF THE SURVEYS AND DESIGNS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING
6 6 6 OFFICIALS.

250 6 6 6 THE DESIGN CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THE
STRUCTURAL DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO
850 FAULTY AND/OR INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE
CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

A BRACKET HARUKAZU OHASHI


PROJECT MANAGER
APL3 328 SCALE 1:10

1. ALL DIMENSION ARE IN MM AND LEVELS ARE IN METERS UNLESS OTHERWISE MENTIONED.
2. GRADE OF STEEL PLATE UNLESS OTHERWISE NOTED : SS400
3. STEEL MATERIAL WITHOUT MARK SHOULD BE HOT DIP GALVANIZED ADHESION OF ZINC
SHALL BE IN ACCORDANCE WITH JIS H 8641 HDZ 35 TO HDZ 55. THE STEEL MATERIAL
HAVING A PLATE THICKNESS OF 3.2MM OR MORE AND LESS THAN 6mm IS HDZ 45.
STEEL MATERIALS,PIPE,STRIPED STEEL PLATES. BOLTS AND NUTS WITH PLATE THICKNESS
LESS THAN 3.2mm SHALL BE HDZ 35.
4. NUTS FOR U BOLT SHALL BE DOUBLE NUTS ( TYPE 1&3)
NUTS EXCEPT U BOLT SHALL BE SINGLE NUT ( ANTI-LOOSE TYPE ).

ORIENTAL CONSULTANTS GLOBAL CO., LTD


PREPARED : PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

IN JOINT VENTURE WITH


JICA-ASSISTED
HIROSHI KUDO CEBU-MACTAN BRIDGE (4TH BRIDGE) AIRPORT LINK VIADUCT 3 (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
BRIDGE ENGINEER
AND
CHODAI CO., LTD REPUBLIC OF THE PHILIPPINES P1-BR
COASTAL ROAD CONSTRUCTION
SUBMITTED : DRAINAGE FACILITY OF DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LOPE L. PAJARILLAGA, JR. BLESILDA S. RAMOS BENJAMIN A. BAUTISTA EDWIN C. MATANGUIHAN ERIC A. AYAPANA MAXIMO L. CARVAJAL
NIPPON KOEI CO., LTD PROJECT APL3 328
SUBSTRUCTURE (5/5) ROADS MANAGEMENT CLUSTER I (BILATERAL) PROJECT MANAGER I, CHIEF, BRIDGES DIVISION PROJECT DIRECTOR, OIC - DIRECTOR ASSISTANT SECRETARY FOR INFORMATION UNDERSECRETARY FOR INFORMATION
HARUKAZU OHASHI (PACKAGE - 1) ROADS MANAGEMENT CLUSTER I (B) BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER I (B) BUREAU OF DESIGN MANAGEMENT AND TECHNICAL SERVICES MANAGEMENT AND TECHNICAL SERVICES
ALMEC CORPORATION 2ND STREET, PORT AREA, MANILA
PROJECT MANAGER JICA L/A No. PH-P274 DATE DATE DATE DATE DATE DATE