WORK NAME: EFFLUENT TREATMENT PLANT WITH ZLD & STP FOR HURL,BARAUNI, (BIHAR)
LOI NO: PNMM/PCV-171/WC/004R DATED 28/10/2019
NAME OF CONTRACTOR: DRIPLEX WATER ENGINEERING PVT.LTD.
DATE OF MEASUREMENT 11.06.2021
CHECK LIST FOR RUNNING ACCOUNT BILL No. : RA-02
Abstract/ Measurement Sheet/ Book as WPM Formats YES NO N.A
2 Description of job as per SOR/ Billing Schedule in Measurement Sheet/ Book ensured in the
Abstract Sheet (e.g. Milestone No. / SOR no./ Sub division no.)
3 Checking Officer- specify % checked & certify in words "checked & found correct".
4 Measurement agreed and certified by both EIC & Authorized representative of Contractor
with duly Stamped.
5 Site handover letter, if applicable as per LOA
6
Pre-requisite Slip duly filled-up & signed with Name, Designation of certifying Officials
Secured Advance YES NO N.A
13 HR clearance for all labour laws PF & ESI certification etc up to the date of completion to the
job
PDIL Certification
100 % checking done
50 % checking done
HURL Certification
10 % measurements checked
Remarks
2 % measurements checked
Remarks