Professional Documents
Culture Documents
ARCHITECT'S CERTIFICATE
Date: 31.12.2023
To
Skyscraper Realtech Properties LLP.
04-0583, ACTION AREA, New Town,
North Twenty Four Parganas, West
Kolkata -700161.
Sir.
Based onSite Inspection, with respect to each of the BuildingWing of the aforesaid
Real Estate Project, I certify that as on the date of this certificate, the Percentage of
Work done for each of the buildingWing of the Real Estate Project. The percentage
of the work executed with respect to each of the activity of the entire phase is
detailed in Table Aand B.
Table -A
Building/Wing Number Block A
Sr. Percentage of
No Tasks/Activity Work done
1 Excavation 80%
2 Foundation 40%
3 number of Podiums NA
4 Stilt Floor NA
5 5 number of Slabs of Super Structure 0%
Internal walls, Internal Plaster, Floorings within
6 Flats/Premises, Doors and Windows to each of the
Flat/Premises 0%
7 Sanitary Fitings within the Flat/Premises 0%
Staircases, Lifts Wells and Lobbies at each Floor level
8 connecting Staircases and Lifts, Overhead and Underground
Water Tanks
0%
The external plumbing and external plaster, elevation,
completion of terraces with waterproofing of the
Building/MWing 0%
Installation of lifts, water pumps, Fire Fighting Fittings and
Equipment as per CFO NOG, Electrical fittings to Common
Areas, electro, mechanical equipment, compliance to
10
conditions of environmentCRZ NOC, Finishing to entrance
lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Walland all other requirements as
may be required to
Obtain Occupation/Completion Certificate
0%
Building/Wing Number Block B
of
Percentage
Sr. work done
No Tasks/Activity
100%
1 Excavation
60%
2 Foundation
number of Podiums
NA
3
NA
4 Stilt Floor
NA
5 5 number of Slabs of Super Structure
Internal walls, Internal Plaster, Floorings within
each of the
6 Flats/Premises, Doors and Windows to 0%
Flat/Premises 0%
7 Sanitary Fittings within the Flat/Premises
each Floor level
Staircases, Lifts Wells and Lobbies at
Underground
connectingStaircases and Lifts, Overhead and
0%
Water Tanks
plaster, elevation,
The external plumbing and external
completion of terraces with waterproofing of the 0%
Building/Wing
Fittings and
Installation of lifts, water pumps, Fire Fighting
Electrical fittings to Common
Equipment as per CFO NOC, to
equipment, compliance
Areas, electro, mechanical to entrance
conditions of environment/CRZ NOC, Finishing
appurtenant to
10
lobby/s, plinth protection, paving of areas as
Building/Wing, Compound Wall and all other requirements
may be required to
Obtain Occupation/Completion Certificate 0%
BuildingWing Number Block C
Percentage of
Sr. Work done
No Tasks/Activity
35%
4 Excavation
NA
2 Foundation
NA
3 number of Basement(s) and Plinth
NA
4
number of Podiums
NA
5 Stilt Floor
0%
Structure
6 5 number of Slabs of Super
Internal walls, Internal Plaster, Floorings within
each of the
7 Flats/Premises, Doors and Windows to 0%
Flat/Premises 0%
Sanitary Fitings within the Flat/Premises
each Floor level
Staircases, Lifts Wells and Lobbies at
and Underground
9 connecting Staircases and Lifts, Overhead 0%
Water Tanks
plaster, elevation,
The external plumbing and external the
10 completion of terraces with waterproofing of 0%
BuildingWing
Fittings and
Installation of lifts, water pumps, Fire Fighting Common
fittings to
Equipment as per CFO NOC, Electrical compliance to
Areas, electro, mechanical equipment,
Finishing to entrance
conditions of environment/CRZ NOC,
appurtenant to
11
lobby/s, plinth protection, paving of areas requirements as
Building/Wing, Compound Wall and all other
may be required to 0%
Obtain Occupation/Completion Certificate
Building/Wing Number Block D
Percentage of
work done
Sr.
Tasks/Activity
No 100%
1 Excavation 80%
2 Foundation NA
Plinth
number of Basement(s) and NA
number of Podiums NA
5 Stilt Floor 0%
Super Structure
6 5 number of Slabs of
Floorings within
Internal walls, Internal Plaster, Windows to each of the
7 Flats/Premises, Doors and 0%
Flat/Premises 0%
Flat/Premises
8 Sanitary Fittings within the level
Lobbies at each Floor
Staircases, Lifts Wells and Underground
Overhead and
connecting Staircases and Lifts, 0%
Water Tanks
elevation,
and external plaster,
The external plumbing waterproofing of the
terraces with
completion of 0%
10
BuildingWing
Fire Fighting Fittings and
Installation of lifts, water pumps,
Electrical fittings to Common
Equipment as per CFO NOC,
equipment, compliance to
Areas, electro, mechanical NOC, Finishing to entrance
conditions of environment/CRZ
areas appurtenant to
11 lobby/s, plinth protection, paving of other requirements as
Building/Wing, Compound Wall and all
may be required to 0%
Obtain Occupation/Completion Certificate
Table - B
entire Registered Phase
Internal & External Development Works in Respect of the Percentage of
Sr. Common areas and Facilities Proposed Remarks
work done
No Amenities (Yes/No)
1
Internal Roads &Footpaths
2
Water Supply
3
Sewerage (chamber, lines, Septic Tank, STP)
4
Storm VWater Drains
5
Landscaping &Tree Planting
6
Street Lighting
7
Community Buildings
8
sullage
Treatment and disposal of sewage and NIL
water /STP
9
Disposal
Solid Waste Management &
10
Water Conservation, Rain Water
Harvesting, Percolating WelWPit
11
Energy Management
12
Requirements
Fire Protection and Fire Safety
13
Electrical Meter Room, Sub-station, Receiving
Station
14 Others (Option to Add more)
Yours Faithuty
Reg No.
71820410009,
Picura
Signature of Architect
(License No.I8aD4IOOO.)