Parcel9 @ ETV Micron Electricals

CONTRACTOR:

Micron Electricals

PROJECT:

EMBASSY TECH VILLAGE PARCEL 9,


BENGALURU

Document:

METHOD STATEMENT

For

Installation of Raceways & Junction Boxes

SIGNATURE:

NAME: SHRISHAIL R ARABALLI

DATE: 30.12.2019

Page 1 of 3
Parcel9 @ ETV Micron Electricals

MICRON ELECTRICALS SYNERGY EMBASSY GROUP

METHOD STATEMENT
INSTALLATION OF RACEWAYS & JUNTION
TITLE: DATE: 30.12.2019
BOXES
EMBASSY TECH VILLAGE PARCEL 9,
PROJECT:
BENGALURU

CLIENT: EMBASSY GROUP REF No: EMBASSY / MS / 12 Rev: 00

This Method Statement is to give instructions regarding the Installation of


PURPOSE:
Raceways & Junction Boxes at the Project Site.

RESOURCES:
Raceways, Junction Boxes, Anchor Fasteners, Hi-tech Rods, Channels, Nuts & Bolts,
MATERIALS /
Hammering / Drilling Machine, Cutting Plier. Wire Stripper, Screw Drivers, Wall
PLANT / TOOLS:
Groove Cutting Machine, Chasing Machine & other Hand Tools.
MAN POWER Engineer, Electricians, Skilled / Semi-skilled Workers, Helpers.
DRAWINGS Approved GFC / Shop Drawings
FORMATS: Quality Formats as required for Installation, Testing & Commissioning.

Sl. No. RESPONSIBILITY ACTIVITY DESCRIPTION

1 Site Supervisor / Preparation UNLOADING


Safety Supervisor  Unload at site store and Stack the material
properly to avoid physical damages
 Issue of material as per site requirement

2 Project Engineer / Installation ON COLUMNS & WALLS


Site Supervisor /  Mark Locations of Raceways on Column /
Safety supervisor
Walls, as per the approved drawings.
 Mark of Locations of Wooden Ghattas &
Horizontal Raceways shown in the drawing.
 Drill holes on columns for fixing Raceways.
 Fix Wooden Ghattas & Horizontal
Raceways with proper scenarios.
 Fix Vertical Raceways.
 Check alignment.

Page 2 of 3
Parcel9 @ ETV Micron Electricals

3 Project Engineer / Installation ABOVE FALSE CEILING:


Site Supervisor /  Mark Locations & Route of Raceways &
Safety supervisor
Junction Boxes on the ceiling.
 Mark locations of Anchor Fasteners.
 Drill holes in ceiling slab for inserting &
fixing Anchor Fasteners.
 Insert Anchor Fasteners in the hole & fix
Hi-tech Rod of required length.
 Fix Horizontal supports / channels to Hi-
tech rods by using nuts & Bolts.
 Check the level with Sprit Level.
 Place Raceways on the supports.

QUALITY CONTROL

4 Site Engineer / Installation /  Quality Formats for Installation activities to


Quality Supervisor Termination be used.
/ Testing
 Ensure that all the instructions as per this
Method Statement are followed at site
.