Subrack View
Grounding installation on Subrack and grounding installation on rack (if install Rack)
With watermark
AC Power connection on Rectifier and ACPDB with labelling (If Install Rectifier)
With watermark
3. Measurement
1 Test Preparation
1.The optical patch cord should not be over tight or intersection when layout,
Expected
the couple patch cord should be tied with proper force in a neat manner.
Result
2. The patch cord should be with right labeling.
Expected
1.The P-GND must be grounded correctly and reliably.
Result
Visual Check
Objective
Inspect the power plant inside cabinet.
Test time
10min
Prerequisites
Static check under no power.
Instruments
N/A
Test Procedures
Visual check.
Expected Result
Power System should meet the requirements.
Test data
No. Items Record
1 System type
2 CSU type
3 Rectifier type
Conclusion:
PASS FAIL
Test time
10min
Prerequisites
Static check under no power.
Instruments
N/A
Test Procedures
1.Check the controller should be operated in front of the system.
2.All rectifier can be pulled out and plugged easily.
3.All breaker can be operated in front of the system.
Expected Result
The operation should be convenient.
Test data
No. Items Record
Monitor LCD and key board can be accessed
1 Pass Fail
easily
2 Easily plug in and pull out of rectifiers Pass Fail
3 Breakers Pass Fail
Conclusion:
PASS FAIL
Test time
5min
Prerequisites
AC input voltage should be in the range of the rated voltage.
Instruments
DMM
Test Procedures
1.Check the AC distribution, measure the AC input voltage by DMM or read from the
controller. The voltage should be in the voltage range on the nameplate.
2.Switch on the input main breaker, and then the rectifiers will start to work.
Expected Result
The system could works properly.
Test data
No. Items Record
1 AC input voltage V
2 Power on Pass Fail
Conclusion
PASS FAIL
Test time
10min
Prerequisites
The system is working well.
Instruments
N/A
Test Procedures
1.Connect power system to a computer.
2.Get and check all data in remote Web browser.
3.Set parameter in the remote Web browser.
Expected Result
All real data could be visit on Web browser and the parameters can be set on Web
browser as well.
Test data
No. Item Read Conclusion
1 DC output
Pass Fail
voltage
3 Real data of
Pass Fail
FB100B3
Conclusion:
PASS FAIL
Test time
5min
Prerequisites
1. The battery should be connected well and the breaker should be switched on.
2. AC input breaker should be switched on and all rectifiers should works properly.
3. The battery SOC should be over 80%.
Instruments
N/A
Test Procedures
1.Adjust the load to around 10A.
2.Switch off the input main breaker,and check battery discharge current.
Expected Result
The loads should work properly after AC failure.
Test data
No. Items Record
1 The loads works properly Pass Fail
Conclusion
PASS FAIL
Test time
5min
Prerequisites
1. Battery should be connected well and the breaker should be switched on.
2. AC input breaker should be switched off.
3. The battery SOC should be no more than 90%.
Instruments
N/A
Test Procedures
1.Adjust the load to around 10A.
2.Verify the battery charge coefficient.
3.Switch on the input main breaker,the DC power system should charge the battery
properly.
Expected Result
The battery should be charged according to the charge coefficient.
Test data
No. Items Record
1 Battery charge current A
Conclusion
PASS FAIL
Network
Diagram
Preset Conditions:
1. Power off the primary power voltage, and check the NE status;
2. Power on the primary power voltage, and check the NE status;
Procedure 3. Power off the backup power voltage, and check the NE status;
4. Power on the backup power voltage, and check the NE status;
5. Primary and backup power voltage should by normally(Test by Multimeter)
Test Result
Remark
Network
Diagram
Preset Conditions:
1. Power off all MCB power of DWDM, and check the NE status configuration;
Procedure
2. Power on all MCB power of DWDM, and check the NE status configuration
Test Result
Remark
DC POWER CONNECTION
BATTERY INSTALLATION