You are on page 1of 37

PT.

Iforte Solusi Infotek


PO No:

Installation Acceptance Test Procedure

Site ID : P-W-SIT1-0001

Device Type : OLA

NE Hostname : Besuki Situbondo

SOW : Swap & Expansion1 and Expansion 2

Prepared by

PT. ZTE INDONESIA

All rights reserved. No spreading without permission of ZTE. Page: 1


Acceptance Test Approval Page

Approval Status Date Signature

PT Iforte Solusi Infotek


Name :
Position :

Vendor
Name :
Position :

Comments:

All rights res erved. No spreading without permission of ZTE. Page: 2


TABLE OF CONTENTS
Installation Acceptance Test Procedure .....................................................................................1
Acceptance Test Approval Page ..............................................................................................2
1. Cabinet Photograph ................................................................................................... 4
2. Item Check ............................................................................................................... 12
3. Measurement ............................................................................................................13
4. Bill Of Quantity Materials ..........................................................................................17
DC Power System Acceptance Test Procedure ....................................................................20
1 Test Preparation ......................................................................................................................20
1.1 Test Configuration ......................................................................................................... 20
1.2 Test Block Diagram ........................................................................................................ 20
1.3 Test Instruments .............................................................................................................20
1.4 Power Redundancy Inspection .....................................................................................21
1.5 Cabling Inspection ......................................................................................................... 21
1.6 Earth/Grounding Inspection ......................................................................................... 21
2 Details of Test Cases and Result ..........................................................................................22
2.1 Power System Test Cases ..............................................................................................22
Visual Check ................................................................................................................ 22
Front Operation .......................................................................................................... 23
AC Input Test .............................................................................................................. 24
Communication Test (WEB) ...................................................................................... 25
2.2 Battery Test Cases .......................................................................................................... 26
Battery Discharge Test ...............................................................................................26
Battery Recharge Test ................................................................................................27
2.3 Power Board 1+1 Protection Test ................................................................................28
2.4 Power Off DWDM configuration Test ......................................................................... 29

All rights reserved. No spreading without permission of ZTE. Page: 3


1. Cabinet Photograph

Site Location Over View

Full view site with Watermark

Full view site with Watermark

All rights res erved. No spreading without permission of ZTE. Page: 4


Cabinet View

Cabinet view with watermark

Subrack View

Subrack View with Watermark

All rights reserved. No spreading without permission of ZTE. Page: 5


Grounding Connection with Labelling

Grounding installation on Subrack and grounding installation on rack (if install Rack)
With watermark

Grounding Connection at Busbar With watermark

All rights res erved. No spreading without permission of ZTE. Page: 6


Rectifier Installation

Rectifier Installation (if install Rectifier) With watermark


NO

AC Power connection on Rectifier and ACPDB with labelling (If Install Rectifier)
With watermark

All rights reserved. No spreading without permission of ZTE. Page: 7


Power Cable Connection with Labelling

DC Power connection on MCB Rectifier and PDU


With watermark

DC Power connection on DWDM With watermark

All rights res erved. No spreading without permission of ZTE. Page: 8


Internal Optical Connection

All internal Optical installation With watermark

All internal Optical installation With watermark

All rights reserved. No spreading without permission of ZTE. Page: 9


Optical Laying and spare

Optical Laying and spare with watermark

Optical Laying and spare with watermark

All rights reserved. No spreading without permission of ZTE. Page: 10


Site Clean and No debris

Indoor or Outdoor view clean no debris with watermark

Indoor or Outdoor view clean no debris with watermark

All rights reserved. No spreading without permission of ZTE. Page: 11


2. Item Check
Item Contents and Standard Conclusion Remarks
The cabinet should be installed in a Pass
place as required by the design and Fail
engineering drawings (or the user).
The racks should be installed properly Pass
and firmly. The horizontal and vertical Fail
deviation
Acceptance check for
No part of the cabinet falls off or gets Pass
rack installation
damaged or missing. The paint should Fail
be in good condition. Signs on the
cabinet should be correct, clear and
complete.
The racks should be fastened to the Pass
ground with expansion bolts tightened Fail
The sub-racks and racks should be Pass
reinforced in compliance with the Fail
Acceptance check for equipment assembly requirements.
sub-rack installation The sub-racks should be firmly Pass
installed and properly arranged with Fail
their connectors in good contact.
The NM equipment should be installed Pass
Acceptance check for
as required by the design and Fail
NM installation
engineering drawings (or the user).
The cables inside the equipment Pass
should be properly connected with Fail
connectors in good contact.
The power cables should be installed Pass
properly and firmly in good contact Fail
Acceptance check for
and in good order.
Cabling Installation
The Grounding cables should be Pass
installed properly and firmly in good Fail
contact and in good order.
Alarm cable installed and connect Pass
securly Fail
The fiber connection lines should be Pass
routed as required by the design and Fail
engineering drawings (or the user).
Redundant length of fiber connection Pass
lines at both ends should be identical Fail
and compliant with the technical
requirements.
The bending radius of the fiber Pass
connection lines inside the troughs at Fail
the turning points should be not less
Acceptance check for
than 38 ~ 40 mm.
Laying of optical fibers
Fiber connection lines should be Pass
protected with tubes or troughs. The Fail
parts without tubes should be bound
with proper force with cable ties.
The bundled fiber connection lines Pass
should be straight without evident Fail
twists in troughs.
The route and direction of cables Pass
should comply with the design. Fail
The cables in the aisle must be bound. Pass

All rights reserved. No spreading without permission of ZTE. Page: 12


The bundled cables should be tightly Fail
against each with straight appearance.
The cables and jumpers should be Pass
arranged straightly, bundled tightly in Fail
proper tightness.
The turnings of cables should be even Pass
and smooth, and the parts other than Fail
curves should be kept vertical or in
line.
Both ends of inter-rack cables and Pass
cabling must be clearly labeled without Fail
wrong or missing connection.
All Labelling installed correctly, No Pass
Labelling
peel, clear to read Fail
Power measurements for each MCB Pass
PDU to Rectifier Fail
Measurement
OCPS measurement Pass
Fail
there is no installation trash, rubbish Pass
Site Cleaning
after installation Fail

3. Measurement

Board Performance Reference(OCPS)


Board Info. Output Optical Power(dBm) Input Optical Power(dBm)
OCPS(CE,2122) -1.0dBm~+22dBm -25dBm~+7dBm
OCPS(CE,3122) -1.0dBm~+22dBm -35dBm~-2dBm

Board Performance Test(OCPS)


Output Optical Input Optical
Board Info. Slot Remarks
Power(dBm) Power(dBm)
OCPS(CE,2122)
OCPS(CE,3122)

Board Performance Reference(SOPS)


Board Info. Insertion loss(dB)
SOPS(T1_I→T1_O1) <4.5dB
SOPS(T2_I→T2_O1) <4.5dB
SOPS(R1_I1→ R1_O) <2.2dB
SOPS(R2_I1→ R2_O) <2.2dB

Board Performance Test(SOPS)


Board Info. Slot Port Insertion loss(dB) Remarks
SOPS(T1_I→T1_O1) T1_O1
SOPS(T2_I→T2_O1) T2_O1

All rights reserved. No spreading without permission of ZTE. Page: 13


SOPS(R1_I1→ R1_O) R1_I1
SOPS(R2_I1→ R2_O) R2_I1
Board Performance Reference(WSUSA9P9D)
Board Info. Insertion loss(dB)
WSUSA9P9D(IN→Ox) ≤15dB
WSUSA9P9D(Ax→OUT) ≤8dB

Board Performance Test(WSUSA9P9D)


Board Info Slot Port Insertion loss(dB) Remarks
O1
O2
O3
O4
WSUSA9P9D(IN→O1~O8)
O5
O6
O7
O8
A1
A2
A3
A4
WSUSA9P9D(A1~A9→OUT) A5
A6
A7
A8
A9

Board Performance Reference(WSUST20D)


Board Info. Insertion loss(dB)
WSUST20D(IN→D1~D20) ≤9.5dB
WSUST20D(A1~A20→OUT) ≤9.5dB

Board Performance Test(WSUST20D)


Board Info Slot Port Insertion loss(dB) Remarks
D1
D2
D3
WSUST20D(IN→D1~D20)
D4
D5
D6

All rights reserved. No spreading without permission of ZTE. Page: 14


D7
D8
D9
D10
D11
D12
D13
D14
D15
D16
D17
D18
D19
D20
A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
WSUST20D(A1~A20→OUT)
A11
A12
A13
A14
A15
A16
A17
A18
A19
A20

External Alarm Test for New Cabinet


No. External Alarm Name Result
1 DOOR OPEN
2 RECTIER FAIL
3 PLN FAIL/ A FAIL

All rights reserved. No spreading without permission of ZTE. Page: 15


BATTERY LOW
4
VOLTAGE
5 BATTERY STOLEN

All rights reserved. No spreading without permission of ZTE. Page: 16


4. Bill Of Quantity Materials

Qty Qty Remarks


No Item ItemCode Unit
Plan Actual
1 Main Equipment
1.1 SFP module(E,OTDR) 180000395810 PCS 2
1.2 V type SFP VOA without power detector 180000244191 PCS 2
1.3 V type SOSC SFP 80KM 180000234034 PCS 0
1.4 V type SOSC SFP 140KM 180000273713 PCS 2
2 XFP and SFP
SFP+ module(10GBASE-LR/10GBASE-LW/1200-SM-LL-
2.1 180000242331 PCS
L/I64.1,10km)
2.2 SFP(GE/FC,1000BASE-LX/100-SM-LL-L,1.25G~1G,10km,1310nm) 180000234049 PCS
3 Client side board
V Type Client Side Board With 20 Ports: Any-rate,Type
3.1 180000452059 PCS
L(Pluggable)
3,2 QSFP28 module(LR4) 180000433378 PCS
V type Client side board with 10 ports: OTU4 level,Type R(100G,N-
3,3 180000433466 PCS
QSFP28)
4 Line side board(beyond 100G)
4.1 200G Line CFP2 Module Type C(D,C,R2,H1s) 180000472756 PCS
V Type Line Side Board With 5 Ports:OTUC2 Level(Type
4.2 180000477413 PCS
R)(Pluggable)
4,3 V Type Line side board with 5 ports: OTU4 level(Pluggable) 180000417720 PCS
4,4 100G Line CFP2 Type C(D,C,R1,H2b) 180000483378 PCS
5 Tool & Other Equipment
5.1 Transmission Manual Download Guide Paper 180000426057 KIT 1
5.2 fiber clean rod 180000446414 PCS 1
6 ZXUCP A200(WASON)
6.1 WASON Update&Maintance 180000363238 KIT 1
6.2 WASON(E-ODUk) 180000363242 KIT
6.3 WASON basic function module (E-Wavelength) 180000363243 KIT 1
6.4 WASON basic module (E-OLA) 180000363244 KIT 1
6.5 WASON traffic(200G) 180000352127 KIT
6,6 WASON traffic(100G) 180000363249 KIT
6,7 WASON traffic(10G) 180000363247 KIT
7 Installation Material
7.1 Patchcord(Singlemode,LC/PC,internal) 180000059661 KIT 10
7.2 Patchcord(Singlemode,LC/PC,external) 180000059662 KIT 4
7.3 Optical Attenuator 180000059750 KIT
Patchcord(Singlemode,E2000) 180000059663
Patchcord(Multi-mode,LC/PC,external) 180000059660
7.4 16mm2 blue Single Core flame retardant power cable 180000059678 KIT
7.5 16mm2 black Single Core flame retardant power cable 180000059679 KIT
16mm2 yellow-green Single Core flame retardant power cable 180000059680
7.6 25mm2 blue Single Core flame retardant power cable 180000410731 KIT

All rights reserved. No spreading without permission of ZTE. Page: 17


Qty Qty Remarks
No Item ItemCode Unit
Plan Actual
7.7 25mm2 Black Single Core Flame Retardant Power Cable 180000410732 PCS
7.8 25mm2 yellow-green Single Core flame retardant power cable 180000215273 KIT 1
7.9 Match Kit(engineering accessory package) 180000059901 KIT 1
7.10 IEC front-mount left&right arm 180000171531 PCS 2
7.11 25mm2 Blue Single Core Flame Retardant Power Cable(NXG1) 180000481072 PCS 2
7.12 25mm2 Black Single Core Flame Retardant Power Cable(NXG1) 180000481073 PCS 2
7.13 35mm2 Blue Single Core Flame Retardant Power Cable(NXG1) 180000481074 PCS 4
7.14 35mm2 Black Single Core Flame Retardant Power Cable(NXG1) 180000481075 PCS 4
NXG1 PDU(2U) 180000493686 PCS
8 S3K-E SUB-RACK/Common Board
8.1 V Type 2.2m Rack(2200x600x300,S3K-E) 180000472207 KIT
8.2 V Type Node Control Processor,Type A 180000472209 PCS
8.3 V Type Power Board,Type A 180000472210 PCS
8.4 V Type Packet Switch Board For S3K-E,Type A 180000472212 PCS
8.5 V Type Extended Interface Board,Type A 180000472213 PCS
8.6 V Type S3K-E SubRack 180000472752 KIT
9 G2K-E SUB-RACK/Common Board
9.1 V Type G2K-E SubRack 180000472754 KIT 1
9.2 V Type Control Processor And Switch Board 180000470404 PCS 2
9.3 V Type G2K-E Power Board,Type P 180000474767 PCS 4
9.4 V Type Packet Switch Board For G2K-E 180000474768 PCS
9.5 V Type Extended Interface Board,Tpye Q 180000474769 PCS
V Type 2.2m G2K-E Rack(2200x600x300,21",G2K-
9.6 180000483274 KIT
E+3*NXG1,DC,6*power input)
10 NXG0/NXG1 RACK/SUB-RACK/ACCESSORY
10.1 V Type 2.2m NXG1 Rack2200x600x300,21",5*NXG1,DC) 180000478197 KIT
11 NXG0/NXG1 ROADM
11.1 V Type Wavelength Selective Switch Unit,Type S(T20D,CE) 180000477818 PCS
11.2 V Type Wavelength Selective Switch Unit,Tpye S(A9P9D,CE) 180000478046 PCS
12 NXG0/NXG1 SUB-RACK/Common Board
12.1 V Type Subrack NXG1-21B(DC) 180000477774 KIT
12.2 Smart Node Control Processor Board,Type G 180000477778 PCS 2
12.3 V Type Cabinet Control Processor,Type G(1 SFP) 180000477780 PCS
12.4 V Type Power Board,Type G 180000477781 PCS 2
12.5 V Type Smart OSC(Type H,N-SFP) 180000477782 PCS
12.6 V Type Extended Interface Board,Type GA 180000477783 PCS 1
12.7 V Type Extended Interface Board,Type GA 180000477783 PCS
12.8 V Type Extended Interface Board,Type GC 180000477784 PCS 1
12.9 V Type Extended Interface Board,Type GC 180000477784 PCS
12.10 V Type Subrack NXG1-21F(DC) 180000483488 KIT 1
Open Rack 19'' fo OTB

All rights reserved. No spreading without permission of ZTE. Page: 18


Qty Qty Remarks
No Item ItemCode Unit
Plan Actual
13 NXG0/NXG1 OP Unit
13.1 V Type Smart Optical Protection Board,Type S(2-ch,1550) 180000477816 PCS
14 NXG0/NXG1 OA Unit
14.1 V Type Smart Optical ComPrehensive Board(CE,OTDR,VOA) 180000477790 PCS 1
14.2 DWDM CFP2-LIKE EDFA ONACE2122-H1 180000477817 PCS 1
14.3 DWDM CFP2-LIKE EDFA ONACE3122-H1 180000481770 PCS 1
15 NXG0/NXG1 OPM Unit
V Type Smart Enhanced Optical Performance Monintor 8 Channel
15.1 180000477810 PCS
Board(8,CE)
V Type Optical Multiplex & Deultiplex board(Type S)(5) 180000478047 PCS

All rights reserved. No spreading without permission of ZTE. Page: 19


DC Power System Acceptance Test Procedure

1 Test Preparation

1.1 Test Configuration


No. Configuration Type Quantity Remark
1 DC power system
2 Rectifier module
3 CSU
4 Lithium battery

1.2 Test Block Diagram

Figure 1 Test Block Diagram

1.3 Test Instruments


No. Instruments Model Remark
It can measure AC/DC voltage(up to
Digi-Multimeter
1 300V),DC current(up to the maximum
( DMM )
current in the test )
If no adjustable load, it can be replaced by
2 Adjustable Load real load.The capacity is should be no less
than 10A.
3 Computer For WEB visit test

All rights reserved. No spreading without permission of ZTE. Page: 20


1.4 Power Redundancy Inspection
Purpose Power redundancy installation inspection
1. Check DC power distribution box for breakers are connected with ZTE OTN
rack and labeled, as per redundancy requirement.
Expected
2. Switch off one circuit breaker that is connected to ZTE OTN rack from the
Result
DC power distribution box that is for redundancy, the ZTE OTN should still be
powered ON.
Test Result Pass Fail

Tested by: Tested by:


(iFORTE) (ZTE)

1.5 Cabling Inspection


Purpose Cabling installation inspection

1.The optical patch cord should not be over tight or intersection when layout,
Expected
the couple patch cord should be tied with proper force in a neat manner.
Result
2. The patch cord should be with right labeling.

Test Result Pass Fail

Tested by: Tested by:


(iFORTE) (ZTE)

1.6 Earth/Grounding Inspection


Purpose Earth/Grounding installation inspection

Expected
1.The P-GND must be grounded correctly and reliably.
Result

Test Result Pass Fail

Tested by: Tested by:


(iFORTE) (ZTE)

All rights reserved. No spreading without permission of ZTE. Page: 21


2 Details of Test Cases and Result

2.1 Power System Test Cases

Visual Check
Objective
Inspect the power plant inside cabinet.

Test time
10min

Prerequisites
Static check under no power.

Instruments
N/A

Test Block Diagram


N/A

Test Procedures
Visual check.

Expected Result
Power System should meet the requirements.

Test data
No. Items Record

1 System type

2 CSU type

3 Rectifier type

4 Lithium battery type

Conclusion:
PASS FAIL

All rights reserved. No spreading without permission of ZTE. Page: 22


Front Operation
Objective
Confirm the front operation of system.

Test time
10min

Prerequisites
Static check under no power.

Instruments
N/A

Test Block Diagram


N/A

Test Procedures
1.Check the controller should be operated in front of the system.
2.All rectifier can be pulled out and plugged easily.
3.All breaker can be operated in front of the system.

Expected Result
The operation should be convenient.

Test data
No. Items Record
Monitor LCD and key board can be accessed
1 Pass Fail
easily
2 Easily plug in and pull out of rectifiers Pass Fail
3 Breakers Pass Fail

Conclusion:
PASS FAIL

All rights reserved. No spreading without permission of ZTE. Page: 23


AC Input Test
Objective
Confirm the DC power system could works properly.

Test time
5min

Prerequisites
AC input voltage should be in the range of the rated voltage.

Instruments
DMM

Test Block Diagram


Refer to figure 1.

Test Procedures
1.Check the AC distribution, measure the AC input voltage by DMM or read from the
controller. The voltage should be in the voltage range on the nameplate.
2.Switch on the input main breaker, and then the rectifiers will start to work.

Expected Result
The system could works properly.

Test data
No. Items Record
1 AC input voltage V
2 Power on Pass Fail

Conclusion
PASS FAIL

All rights reserved. No spreading without permission of ZTE. Page: 24


Communication Test (WEB)
Objective
Verify the communication.

Test time
10min

Prerequisites
The system is working well.

Instruments
N/A

Test Block Diagram


Refer to figure 1.

Test Procedures
1.Connect power system to a computer.
2.Get and check all data in remote Web browser.
3.Set parameter in the remote Web browser.

Expected Result
All real data could be visit on Web browser and the parameters can be set on Web
browser as well.

Test data
No. Item Read Conclusion

1 DC output
Pass Fail
voltage

2 Load current Pass Fail

3 Real data of
Pass Fail
FB100B3

No. Item Set Conclusion


1 Battery 1
Pass Fail
capacity

Conclusion:
PASS FAIL

All rights reserved. No spreading without permission of ZTE. Page: 25


2.2 Battery Test Cases

Battery Discharge Test


Objective
Confirm the battery can feed loads after AC failure.

Test time
5min

Prerequisites
1. The battery should be connected well and the breaker should be switched on.
2. AC input breaker should be switched on and all rectifiers should works properly.
3. The battery SOC should be over 80%.

Instruments
N/A

Test Block Diagram


Refer to figure 1.

Test Procedures
1.Adjust the load to around 10A.
2.Switch off the input main breaker,and check battery discharge current.

Expected Result
The loads should work properly after AC failure.

Test data
No. Items Record
1 The loads works properly Pass Fail

Conclusion
PASS FAIL

All rights reserved. No spreading without permission of ZTE. Page: 26


Battery Recharge Test
Objective
Confirm the battery can be charged after discharge.

Test time
5min

Prerequisites
1. Battery should be connected well and the breaker should be switched on.
2. AC input breaker should be switched off.
3. The battery SOC should be no more than 90%.

Instruments
N/A

Test Block Diagram


Refer to figure 1.

Test Procedures
1.Adjust the load to around 10A.
2.Verify the battery charge coefficient.
3.Switch on the input main breaker,the DC power system should charge the battery
properly.

Expected Result
The battery should be charged according to the charge coefficient.

Test data
No. Items Record
1 Battery charge current A

Conclusion
PASS FAIL

All rights reserved. No spreading without permission of ZTE. Page: 27


2.3 Power Board 1+1 Protection Test
Purpose To verify the 1+1 protection of power interface unit

PDU OF Rack Logic Diagram:

Network
Diagram

Preset Conditions:
1. Power off the primary power voltage, and check the NE status;
2. Power on the primary power voltage, and check the NE status;
Procedure 3. Power off the backup power voltage, and check the NE status;
4. Power on the backup power voltage, and check the NE status;
5. Primary and backup power voltage should by normally(Test by Multimeter)

Expected The NE always works normally, and is online.


Result

Test Result

Remark

Tested by: Tested by:


(iFORTE) (ZTE)

All rights reserved. No spreading without permission of ZTE. Page: 28


2.4 Power Off DWDM configuration Test
Purpose To verify the configuration recovery

PDU OF Rack Logic Diagram:

Network
Diagram

Preset Conditions:
1. Power off all MCB power of DWDM, and check the NE status configuration;
Procedure
2. Power on all MCB power of DWDM, and check the NE status configuration

Expected The NE always works normally, online, and no configuration missing


Result

Test Result

Remark

Tested by: Tested by:


(iFORTE) (ZTE)

All rights reserved. No spreading without permission of ZTE. Page: 29


RECTIFIER INSTALLATION VIEW

All rights reserved. No spreading without permission of ZTE. Page: 30


RECTIFIER MODULE VIEW

RECTIFIER SUBRACK VIEW

All rights reserved. No spreading without permission of ZTE. Page: 31


AC POWER CONNECTION

DC POWER CONNECTION

All rights reserved. No spreading without permission of ZTE. Page: 32


GROUNDING INSTALLATION

BATTERY INSTALLATION

All rights reserved. No spreading without permission of ZTE. Page: 33


BATTERY CONNECTION

All rights reserved. No spreading without permission of ZTE. Page: 34


POWER and LOAD Measurement Before Power On

All rights reserved. No spreading without permission of ZTE. Page: 35


POWER and LOAD Measurement After Power On and config (Capture)

All rights reserved. No spreading without permission of ZTE. Page: 36


POWER Off DWDM Configuration Test

All rights reserved. No spreading without permission of ZTE. Page: 37