ARCHITECT'S CERTIFICATE

Date:05.03.2021

To

Synergy Properties

Flat No 2, Building 50 & 51,


Samayadnya Co-operative Housing,Society,
Opp. SPM English Medium School,
Lokmanya Nagar, Sadashiv Peth, Pune 411030

Sublect: Certificateof Percentage of Completion of development Work Require for MahaRERA


registration process of the project PALOMA situated on the Gat No 268 demarcated by its
boundaries (18 39'39" N 73 35'05"E) Gat No 27L, Gat No 272 - to the North, Road And Mhaske
House- totheSouth, GatNo269,GatNo270,Gat27l- to the East, Gat No 272 - totheWestof
Village - Adhale Budruk, Taluka - Maval, District - pune , 410506 admeasuring 25810.00 sq.mts.
area beinB developed by Synergy Properties.

5ir,

I Arch. Shripad Padhye have undertaken assjgnment as Architect of certifying percentage of


Completjon ofdevelopment Work ofthe plotted layout ofthe project PALOMA. situated on Gat No
268 ofVillage , Adhale Eudruk, Taluka - Maval, District - pune pin - 41OSOG admeasuring 26810.00
sq. mts, area being developed by SyneGy properties

1. Following technical professiona15 are appointed by Owner / promotert


i. Mi. Shripad Padhye as Architect

ii. Mr. Shishir Dhawade as Structura I Cons u lta nt

iii. Mr. lmran Shaikh as MEp Consultant

iv. Mr. Jitendra Borate as Project Engineer

Based on Site lnspection, with respect to each of the Buildin&/Wing of the aforesaid Real Estate
Project, I certify that, as on the date of this Percentage of Work done for each of the

62'<\
qt
3'6o,,,,,,,)?
Reg. No. rClv87ll I l3l
Flot No. 17, 4lh floor, Rohl Sokho Aportment, (Choflonyo Hospttot Buttdlng), Pune Sinhgod Rood,
Shrimd
N6or Nllqr'om Bidge, Poruoli, CTS No. 253 d Flnol Plol No. 588/A, Pune : 4t 1030. Padhyc
Phone No. : (0201 24333935, 9422361389. Emoil : shipodpodhye@yohoo.corn
buitding/wing/protYS&%'v"ut%ftl8fl€Bf$IStSofloiect as resistered vrde number (Resistration in
process) under MahaRERA is as per table A herein below. The percentage
of the work executed with
respect to each of the activity of the entire phase is detailed in Table B.

Table A

Sr.

1 Excavation

2 number of Basement(s) and Pljnth NA


3 number of Podiums NA

4 Stilt Floor NA
5 number of Slabs of Super Structure NA
6 lnternal walls, lnternal plaster, NA
Floorings within Flats/Premises,
Doors and Windows to each ofthe Flat/premises
7 Sanitary Fittings within the Flat/premises, Electrical Fittings within the NA
Flat/Premises

8 Staircases, Lifts Wells and Lobbies at each Floor levelconnecting NA


Staircases and Lifts, Overhead and Underground Water Tank5

9 The external plumbing and external plaster. elevation, NA


completion of terraceswith waterproofing of the
BuildingAr'r'ing.
10 lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment a; NA
per CFO NOC, Electrical fittings to Common Areas, electro, mechanical
equipment, Compliance to conditions of environment /CRZ NOC,
Finishing to entrance lobby/s, pljnth protection, paving of areas
appurtenantto Building/Wing, Compound Wall and all other
requireritents as may be required to Obtain Occupation /Completion
Certificatel
Building Aving Number_ (to be prepared separatety for each Buitdinffuii! of tilfrq---ij

#\
E("o,rrn,'")?
R\.--,/;i
Reg. No. :Clv87ll I l3l
Flot No. 17, 4th floor, Roh Sokho Apoiment, (Choiiorryo Hospitot Buitdtng), Pune Stnhgod Rood,
Neor Nlloyom Bidge, Porvoli, CTS No. 253 A, Finol Pot No. 588/d Pune : 41 1030.
Phone t{o. : {020) 24333935,9422361389. Emoll : shripodpodlrye@yohoo.com
Ar.
v
Shfinad
PadhyG
Wobslle : vww orshrioodoodhve.com
TA$"E-a

lnternal & External Development Works in Respect ofthe entire Reqistered phase

S. No Common areas Proposed Percentage of Details


and Facilities, Amenities (Yes/No) Work done
1. lnternal Roads & Footpaths YES 0v.

2. Water Supply YES ov PROVtStON Or


BOREWELT &SUPPTY
INfRASTRUCIU RE 45
PERCONSULTANT.
3. Sewerage (Chamber, lines, YES o%
Septic Tank, STP) AS PER CONSULTANT

4. Storm Water Drains YE5 o% AS PER CONSULTANT

5. Landscaping & Tree Planting YES o% AS PER CONSULTANT

6. Street Lighting YES lYo AS PER CONSULTANT

7. Community Buildin8s NO 0v.

Treatment and disposal of YES o%


sewage and sullage water AS PER CONSULTANT

9. Solid Waste management YES o%


& Disposal AS PER CONSUTTANT

10. Water conservation, Rain YES o% AS PCR CONSUTIANT

water harvesting
17. Energy management NO o./"

12. Fire protection and fire NO ovd


safety requirements
13. Electrical meter room, sub- YES o%
station, receiving station AS PER MSEDCL

14. Others (Option to Add


more)
Yours Faithfully

ARCHTTECT SHRTPAD pADHyE. (REG. NO CAl87l11