APSHCL'11,,I'\/2O21'ENGINEERING SEC-APSHCL
Andhra Pradesh State Housing Corporation Limited
Plot No I I & 12, Near APIIC Colony, Auto Nagar, Vijayawada - 520 007 (A'P')
From: To
Dr. Narayana Bharat Gupta. rAS All the Project Directors (H)
Managing Director in the State
Sir,
Sub: APSHCL - Navaratnalu Pedalandariki Illu (NPI) Construction of Model
-
Houses in Layouts - conducting detailed analysis ol Specifications and cost of
construction - Reg.
Ref: I. Minutes of the PDs Conference held by the Prl' Sec. to Govt' Hsg Dept
and MD. APSHCL on 07.01 '2021 communicated through e-file
APSHCL- I I I 61202l -DEE Engineering-APSHCL, dt I I'0 I'202 I'
2' T/o Lr No even, dt 30.03.2021 & 06.04.2021 addressed to all PDs (H) in
the State.
3. Instructions of the Hon'ble Chief Minister during the review meeting
held on 05.05.2021 on Housing activities.
***
l. You are aware that. instructions were issued to the districts to take up
constmction of model houses @ one per each layout to demonstrate the
construction ofhouse with type design and actual cost of construction'
2. Accordingly. so far beneficiaries were identified for construction model houses
in 5,048 layouts and 77 model houses are completed / nearing completion'
3. During the review meeting held on 05.05.2021 on housing activilies .Hon'ble
Chief Minister has directed Housing Department to conduct detailed analysis of
Specifications adopted in Model Houses and cost of construction and to take
appropriate aclion for completion of houses within the unit cost.
4. Hence, all the PDs(H) are directed to do cost analysis study on each model
house completed so far and suggest the appropriate measures/innovations to
complete the house within the unit cost in case the actual cost of construction
exceeds the unit cost. The cost analysis summary may be fumished in the
enclosed Annexure-l & II.
5. The report of the Project Director (H) along with enclosures shall reach this
office on or before 31 .05.2021 '
Yours faithlully,
Digitally approved
Managing Director
//Attested//
&\-
Annexure -I : Basic Details
Cost Analysis of Model House Constructed under Navaratnalu -
Pedalandariki Illu as per Approved Type design (17'xl6')
I Beneficiaq details I
,l
Name of the District
) Name of the Assemblv Constituencv
J Name of the Manadal / ULB
4 Name of the the GP/Ward
) Name of the Beneficiary
'l
I
6 Father/Husband name
7 Scheme/Year I
8 Housing ID :l
9 PMAY ID .t
Assistant Engineer (H) Dy. Executive Engineer (H) Executive Engineer (H) Project Director (H)
Mandal Sub Division Division District
Annexure -II : Cost AnalYsis
Cost Analysis of Model House Constructed under Navaratnalu -
Pedalandariki lllu as per Approved Type design (17'xl6')
!latcrial dctails
I ( cnrcnl 90 llags t25 20250
I
lcirch rl
2'6"i6'6"
R(:C Window framcs
II l'x4'
.l Nos H50 ,1J50
l2 Ntts -1900
0.9 !i 1.20)
Window Shullcr\ ( W2-
L1 I Nos 700 7{)0 I
0.9 r 0.6
Kadapa Slabs
(Almyrahs.Sun rhitdcs.
I.1 Sqnl I50 r 750
Kitchcn I'latli)rm. sink.
t,olls)
Finishing materials
l)aints (Primcr.
ttl
I)islcmpcr/ llnrul\ion.
t5 No 1000 2000
wood primcr. Slnthctic
cnilmcl ilinl I
t1 I No "1000
malcrials
Total lllaterials ( ost l22Jt i I
I
ll lrillinS. carth li)r llit\cntcnl It lonnc 500 {000 I
( Verandah ltems:
llascmcnl civil work ( I
.l
l"
(
dia MS round I'ipes
l)urlinsl
2550 ---T--- Rs.)
5
l.rbour lbr lixing ol l'ipcs
& A( shcels
l'crsnd{h Cost (68sft)
tJ2
()9
t2
[T--
Skilled Workers cost**
(l\lrson, Bar bender, .1.t600
t)
I'lumber, Electrician,
Psinter)
'l'otrl House Cost I ti0{I)0
E 0 0 t) 0
Assistant Engineer (H) Dy. lixecutive Engineer (H) Execulive Engineer (H) I'rojcct [)irector ([ I)
Mandal Sub Division Division District
Yours laithfully,
Digitally approved
Managing Director