You are on page 1of 6

SIRTE OIL COMPANY

for Production, Manufacturing of Oil & Gas


Maintenance Dept.
Maintenance Engineering Division
Projects Group
CONSTRUCTION WORK SCHEDULE
CWO NO ° : 98208-230-413
CONTRACTOR : Consortium between EZAR Ltd & Alsholaa AlMudhiaa
PROJECT NO° & TITLE : MP -1365 : RENOVATION OF MAINTENANCE FACILITIES WORKSHOP

Year 2019
Month Aril May June July August
ITEM N° Description of Activities Week W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3

Weight %
1 Mobilization and site Preparation 3.0% 1.00% 1.00% 1.00%
2 Engineering Documentation 4.0% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50%
3 Procurement of materials 17.0% 17 %
3.1 Datasheet approval & Inspection of materials at the vendor's site 2.0% 1.00% 0.50% 0.50%
3.2 Delivery of materials from vendor to SOC Site 15.0% 5.00% 5.00% 5.00%
4 New washroom and renewal of workshop`s offices 14.5% 14.5 %
4.1 Earthwork 1.5% 0.50% 0.50% 0.50%
4.2 excavation and lean concrete pour 1.5% 0.50% 0.50% 0.50%
4.3 Formwork and reinforcement rebar installation 1.5% 0.50% 0.50% 0.50%
4.4 Foundation concrete (bases, footing, pedestals, beams, etc...) 2.5% 1.25% 1.25%
4.5 Drainage system 1.5% 0.75% 0.75%
4.6 Reinforced concrete floor slab 120 thk 2.0% 2.00%
4.7 Elevation works ( column, beams, lintel, etc..) 1.5% 1.00% 0.50%
4.8 Reinforced concrete roof slab 150 thk 2.5% 0.83% 0.83% 0.84%
5 Masonry works 4.0% 4%
5.1 Construction of new masonry wall ( new washrooms ) 3.0% 1.00% 1.00% 1.00%
5.2 Repair of existing masonry wall 1.0% 0.50% 0.25% 0.25%
6 Electrical work 2.0% 1.00% 0.50% 0.50%
7 Plumbing water supply and sanitairy work 2.0% 1.00% 0.50% 0.50%
8 Architectural works 4.0% 4%
8.1 Plaster works 2.0% 1.00% 0.50% 0.50%
8.2 Installation ceramic tile 2.0% 1.00%
9 Ceiling installation 2.5%
9.1 New washrooms 1.0%
9.2 Workshop`s offices 1.5%
10 Built - Up roofing and roof drainage 1.5% 0.75% 0.75%
11 Repair of concrete floor and drain channel 0.5% 0.25% 0.25%
12 External painting works 1.0%
13 Door and window installation 5.0%
13.1 Installation and repair of steel doors 1.0%
13.2 Windows Installation 1.5%
13.3 Repair of workshop`s offices doors 0.5%
14 Internal painting 2.0%
15 Septic tank installation 5.5% 5.5 %
15.1 Construction of new septic tanks 4.0% 2.00% 1.00% 1.00%
15.2 Saok-away pit and revision manholes 1.5% 0.75% 0.75%
16 Dismantle of roof panels and wall panels 5.0% 5%
16.1 Dismantle works ( Section A ) Workshop`s Offices 3.0% 0.75% 0.75% 0.75% 0.75%
16.2 Dismantle works ( Section B ) Facility Workshop 2.0% 0.50% 0.50%
17 Repair and installation works 18.0% 18 %
17.1 Repair and installation works ( Section A ) Workshop`s Offices 9.0% 2.25% 2.25% 2.25% 2.25%
17.2 Repair and installation works ( Section B ) Facility Workshop 9.0%
18 Repair of roller doors 0.5%
19 Test of roofs and walls 6.0%
20 Demobilization and housekeeping 4.0%

PLANNED 100.0% 1.50% 1.50% 2.00% 2.00% 2.75% 3.25% 3.00% 5.00% 6.75% 7.58% 8.33% 6.34% 8.00% 7.00% 2.00% 1.00% 2.00%
Weekly Progress
ACTUAL
PLANNED 2% 3% 5% 7% 10% 13% 16% 21% 28% 35% 44% 50% 58% 65% 67% 68% 70%
Cumulative Progress
ACTUAL
PLANNED 2 4 6 6 6 6 6 6 10 10 10 6 8 8 4 2 4
Manpower
ACTUAL

Contract: Name:Consortium between EZAR Ltd & Alsholaa AlMudhiaa Signture…………... Date……………. SOC: Approvel………….. ProjectEng……………. Signture…………... Date
MEF -06-01-06
RK SCHEDULE
START DATE : ( 15 / 04 / 2019 )
COMPLETION DATE: ( 25 / 10 / 2019 )
REVISON NO ° : 1

2019
August September October
W4 W1 W2 W3 W4 W1 W2 W3 W4

4%

1.00%
2.5 %
1.00%
0.50% 0.50% 0.50%

0.33% 0.33% 0.34%


5%
0.50% 0.50%
0.75% 0.75%
0.25% 0.25%
1.00% 0.50% 0.50%

5%

0.50% 0.50%
18 %
2.25% 2.25% 2.25% 2.25%
0.20% 0.20% 0.10%
2.00% 2.00% 2.00%
4.00%

3.53% 4.03% 4.19% 3.25% 2.75% 2.25% 2.00% 2.00% 6.00% 100.00%

74% 78% 82% 85% 88% 90% 92% 94% 100%

4 4 6 6 6 6 6 2 4

………….. ProjectEng……………. Signture…………... Date…………..


Rev- (1)
MED comments of MP 1365 Time table
NO. ITEM
1 2
2 3
3 3.1
4 3.2
5 3.3
6 4
7 4.3
8 4.6
9 4.7
10 4.8
11 4.9
12 6
13 7
14 8
15 8.1
16 10
17 12
18 16
19 16.1
20 16.2
21 17
22 17.1
23 17.2
24 19
25 20

Please contact MED regarding any clarification on this matter

Reviewed by :
ALI AL MAJBARY NOEL F. DELA CRUZ
Projects Coordinator
mments of MP 1365 Time table
DESCRIPTION OF ACTIVITIES
Engineering documents weight % to be reduced to 4%
Procurement to be reduced to 17%
Datasheet approval to be deleted and merge with Item 3.2
Shall be Datasheet approval & Inspection of materials at the vendor's site , change weight % to 2%
Delivery of materials from vemdor to SOC site weight percent to be 15%
New Washroom and renewal of maintenance workshop to be reduced to 14.5%
Formworkand reinforcement rebar installation to be reduced to 1.5%
Reinforced concrete floor slab 120 thk weight % to be increased to 2%
Demolishing works to be deleted, remove from the Description of activities.
Elevation works( shall be properly specified and described)
Reinforced concrete roof slab 150 thk weight % to be reduced to 2.5%
Electrical work to be reduced to 2%
Plumbing water supply and sanitairy work to be reduced to 2%
Architectural works to be reduced to 4%
Plaster works to be reduced to 2%
Built - Up roofing and roof drainage tobe increased to 1.5%
External painting works to increased to 1%
Dismantle of roof panels and wall panels to be increased to 5%
Dismantle works ( Section A ) Workshop`s Offices to be increased to 3 %
Dismantle works ( Section B ) Facility Workshop to increased to 2%
Repair and installation works to increased to 18%
Repair and installation works ( Section A ) Workshop`s Offices to be increased to 9%
Repair and installation works ( Section B ) Facility Workshop to be increased to 9%
Test of roofs and walls to be increased to 6%
Demobilization and housekeeping to be increased to 4%

ontact MED regarding any clarification on this matter

MAJBARY NOEL F. DELA CRUZ


(Project Engineer)