Professional Documents
Culture Documents
KEC/IMS/EHS/07/F/1F
EHS Assessment Score Issue. No. 2 Rev. No. 0
Project Manager :
RM/Country Manager :
PCH/ VP:
Applicable Assessment
S.NO. Criteria Weightage Remark
Weightage Score
1 Minimum Mandatory Requirement
1.1 EHS Induction / Training & TBT 5.00 5.00 0.00
1.2 Emergency Preparedness 5.00 5.00 0.00
1.3 Work @ Height 5.00 5.00 0.00
1.4 Work Permit System 4.00 4.00 0.00
1.5 Tools & Plants 4.00 4.00 0.00
1.6 Safety Equipment 5.00 5.00 0.00
1.7 Electrical Safety 4.00 4.00 0.00
1.8 Chemical Safety 1.00 1.00 0.00
1.9 Edges Protection & Floor Opening 7.00 7.00 0.00
Total 40.00 40.00 0.00
2 Operational EHS Requirements
2.1 Safety Visual Management 3.00 3.00 0.00
2.2 EHS Budget 1.00 1.00 0.00
2.3 Contractor Management / Project Pre- 1.00 1.00 0.00
Mobilization Stage
2.4 EHS training and deployment 3.00 3.00 0.00
2.5 Tools & Plants (Construction Equipment) 3.00 3.00 0.00
2.6 Welding, Grinding and Gas cutting 3.00 3.00 0.00
2.7 Means of Access (Ladder & Scaffold) 4.00 4.00 0.00
2.8 Activities Operational Control 3.00 3.00 0.00
2.9 LOTO & Electrical Safety # 1 3.00 3.00 0.00
2.10 Fire Management 2.00 2.00 0.00
2.11 Road & Transport 2.00 2.00 0.00
2.12 Worker Welfare at site & Labor Camp 2.00 2.00 0.00
2.13 Storage of Material and Handling 4.00 4.00 0.00
2.14 Housekeeping 2.00 2.00 0.00
Total 36.00 36.00 0.00
3 EHS Proactive Parameters
3.1 Leading Indicator 4.00 4.00 0.00
3.2 Incident Reporting 1.00 1.00 0.00
3.3 Reward & Recognition and Innovation 2.00 2.00 0.00
Total 7.00 7.00 0.00
4 Leadership & Management Commitment
4.1 Visit by VP/PCH (HSV) 2.00 2.00 0.00
4.2 Review by VP/PCH (HSR) 2.00 2.00 0.00
4.3 Region Safety Visit (RSV) 2.00 2.00 0.00
4.4 Region Safety Review (RSR) 2.00 2.00 0.00
4.5 Team Safety Visit (TSV) 2.00 2.00 0.00
4.6 Weekly EHS Review (WER) 2.00 2.00 0.00
4.7 EHS Discipline 2.00 2.00 0.00
4.8 EHS Standard and Procedure 3.00 3.00 0.00
Total 17.00 17.00 0.00
Over all EHS Score 100 100 0.00
All workers deployed for height jobs shall be authorized by height pass which
2.00 A 2.00 0.00
to issued after medical fitness, Work at height training and vertigo test.
Safety net must be provided for arrest of material or person e.g. in silo /
1.00 A 1.00 0.00
1.3 Work @ Height 5 scaffolding /roof / chimney construction work etc.
All "Fall prevention & Fall protection" equipment i.e. retractable fall arrestor ,
life line, Full body harness used for height work & SCBA set shall be uniquely 2.00 A 2.00 0.00
identified, inspected and recorded regularly on fortnightly basis ?
Are the permit issuer physically inspect the work area and verify the defined
1.00 A 1.00 0.00
controlled before issuing the permit( not EHS officer)
Are routine/non routine activities (as per risk) shall be performed with work
Work Permit permit system and details / name of all workmen involved in job shall be 1.00 A 1.00 0.00
1.4 4
System mentioned ?
Do they brief to workers/gang on control measures stated into work permit ? 1.00 A 1.00 0.00
Safety Protective 100% compliance for foot protection viz safety shoes / gum boots is
1.5 5 mandatory as per risk assessment. 1.00 A 1.00 0.00
Equipment
Personnel Protective Equipment's must be compliance 100% like
jacket/gloves /shoulder pad/goggles/nose or dust mask/plugs etc. as per risk 1.00 A 1.00 0.00
assessment?
High Visibility jackets must be worn by all at site. 1.00 A 1.00 0.00
Are all work area like foundation, cable trench, barricated as per risk
1.00 A 1.00 0.00
assessment?
Are floor or roof edges /sidewalks protected by hand rail (top rail and mid
1.00 A 1.00 0.00
rail) ?
Edges
Protection, Are toe boards installed around the edges of a permanent floor opening
1.8 Floor Opening 7 0.50 A 0.50 0.00
(where persons may pass below the opening)?
(Cut/Holes),
Excavation Are all warning signs are in good condition and can be clearly seen from far. 0.50 A 0.50 0.00
Are all excavated area barricaded by hard/Soft barrication as risk assessment. 1.00 A 1.00 0.00
Excavation area shall have access & egress arrangement 1.00 A 1.00 0.00
Excavation area will be protected by shoring /slop cut as per risk assessment. 1.00 A 1.00 0.00
Safety Visual Is fully equipped safety park available at project Site? 1.00 A 1.00 0.00 ### of
Management
Do's / Don’ts shall be effective, relevant to activity and displayed where "
0.33 A 0.33 0.00
2.1 ( safety 3 engaged worker can easily refer it. F
a
signage, i
Posters , Store area shall have identification of material, marking of walkways and r
0.33 A 0.33 0.00 l
Banners etc.) access road? y
Identification and marking of Assembly point, First aid boxes location and C
'Smoking Zone' Area. 0.34 A 0.34 0.00 o
m
p
3 3.00 3.00 0.00 l
Do we have dedicated EHS budget (at least 0.5% of project / construction ### yi
2.2 EHS Budget 1 value) and communicated & available at site? 1.00 A 1.00 0.00 n
g
"
1 1.00 1.00 0.00
All the Contractors/ Service provider must sign the EHS agreement prior to
0.33 A 0.33 0.00
start the work.
Contractor
Management / Monthly EHS performance rating for contractor being done. 0.33 A 0.33 0.00 ###
2.3 Project Pre- 1
Mobilization
Stage Is pre-mobilization checklist being implemented before commencing the
0.33 A 0.33 0.00
project and observed critical deviation being escalated to management?
Specific Lock Out Tag Out, Manual handling & scaffolding training shall be 0.43 A 0.43 0.00
conducted for all workers.
EHS training and
2.4 3 Specific confined space training shall be conducted for all confined space
deployment 0.43 A 0.43 0.00
workers (not TBT type, a specific training)
Are 100% of employees & contractor workmen being covered in "Life After 0.43 A 0.43 0.00
Accident" Training on monthly basis ?
Are ERP, First aid, prevention of snake bite etc. awareness training conducted
at site 0.43 A 0.43 0.00
Other Training like Fire prevention, or any other ? 0.43 A 0.43 0.00
3 3.00 3.00 0.00
N
All lifting equipment and accessories shall be uniquely identified and marked o
0.60 A 0.60 0.00
with SWL. .
Is operator trained, medically examined along with eye check-up, valid licence ### of
0.60 A 0.60 0.00
and carrying authorized identity card with them?
"
Tools & Plants F
2.5 (Construction 3 Are all moving equipment like Crane/Hydra/Excavator/all vehicle etc. having a
0.60 A 0.60 0.00
Equipment) audible back horn, back light, safety hook latch? i
r
l
All lifting operation shall be carried out by trained riggers (dressed in red high y
0.60 A 0.60 0.00
visibility vest.) with guy rope.
C
o
Construction/Lifting equipment must be complied safety requirement and
0.60 A 0.60 0.00 m
checked & record regularly basis? p
l
3 3.00 3.00 0.00 y
i
N
n
All cables (Input, Welding & Ground Cable) shall be in sound condition o
0.60 A 0.60 0.00 g
."
(without worn-out or cracked insulation)
o
Are welding holders & its insulation in appropriate condition 0.60 A 0.60 0.00 f
"
Welding, All welding machine / gas cutting shall be checked on monthly/fortnightly F
2.6 Grinding and 3 0.60 A 0.60 0.00 a
basis. i
Gas cutting r
l
All grinding/cutting machine shall be checked on regular basis. 0.60 A 0.60 0.00 y
C
o
Gas cutting set shall be checked on regular basis and record maintain. 0.60 A 0.60 0.00 m
p
l
3 3.00 3.00 0.00 y
i
n
g
"
Certified Scaffolder/Inspector is available at site. 0.50 A 0.50 0.00
Are all rungs and steps intact in good condition? 0.44 A 0.44 0.00
4 4.00 4.00 0.00
Is there pre-inspection checklist followed for Piling work / Blasting? (If
applicable) 0.75 A 0.75 0.00
All electrical installation must be formally inspected and recorded. 0.38 A 0.38 0.00
Fire ### o
2.10 2 Fire Extinguishers must be available and maintained at project store / site as f
Management 0.67 A 0.67 0.00
per risk assessment/fire load.
"
F
Is there availability of Fire point with bucket at store / site ? 0.67 A 0.67 0.00 a
i
2 2.00 2.00 0.00 r
l
N
y
Are all drivers undergone defensive driving and CPR training? 0.50 A 0.50 0.00 o
.C
### oo
Road & Are all vehicles having operational seat belts and all passenger using it? 0.50 A 0.50 0.00 m
fp
2.11 Transport 2
l
"y
Is the speed limit defined and displayed at site 0.50 A 0.50 0.00 Fi
an
ig
Are Portable Fire Extinguisher & First Aid kit available in vehicle? 0.50 A 0.50 0.00 r"
l
2 2.00 2.00 0.00 y
Is there rest shed / available at site for workers? 0.25 A 0.25 0.00 C
o
Are there precaution taken to avoid biological hazard like snake bite, scorpion ### m
0.25 A 0.25 0.00 p
Worker Welfare sting etc. l
2.12 at site & Labor 2 y
Is clean drinking water facility available at all working locations? 0.25 A 0.25 0.00 i
Camp n
Is there toilet facility available at site/ store/office? 0.25 A 0.25 0.00 g
"
Labor Camp shall be audited as per checklist on fortnightly basis with 1.00 A 1.00 0.00
compliance of all action points.
2 2.00 2.00 0.00
Is there safe clearance for all material through walkways and road? 0.50 A 0.50 0.00
Is loading & unloading plan of materials available? 0.50 A 0.50 0.00
###
Is material storage SOP/Methodology followed and material stable & secure ? 0.50 A 0.50 0.00
Storage of Are storage areas/walkways free from tripping hazards? 0.50 A 0.50 0.00
2.13 Material and 4 There shall be specific yard for storage of scrap / waste material ? 0.50 A 0.50 0.00
Handling
Are vehicle stopper/ wedges being used in vehicles which are in standby 0.50 A 0.50 0.00
position (loading/unloading)
Is there material identification marking/route marking displayed at storage
0.50 A 0.50 0.00
area?
Availability of Emergency Siren at project site / store? 0.50 A 0.50 0.00
4 4.00 4.00 0.00
Waste segration must be done at source and it is to be kept in different color
0.33 A 0.33 0.00
coded dustbin.
Are floor area neat & clean during de-shuttering/erection / foundation / ###
0.33 A 0.33 0.00
building area /other work?
Are materials stored in areas that do not interfere with workers or the flow of
materials? 0.33 A 0.33 0.00
2.14 Housekeeping 2
All unwanted material like cement bags, reinforcement rod pieces, waste
0.33 A 0.33 0.00
concrete etc. are removed from work area after completion of work.
Leading ### o
3.1 4 Near Miss reported (Minimum 05 per month) as per corporate guideline.? 1.33 A 1.33 0.00 f
Indicator
"
What is percentage of closure of Deviation and Near Miss per corporate F
1.33 A 1.33 0.00 a
guideline ? i
r
4 4.00 4.00 0.00 l
y
N
o
All injuries & dangerous occurrence shall be communicated as per incident 0.50 A 0.50 0.00 .C
Incident reporitng guidline. Investigation report alongwith CAPA is available. o
m
3.2 1 o
Reporting fp
l
Other Incident CAPA must be implmented as per incident tracker "y
0.50 A 0.50 0.00
compliance . Fi
an
1 1 1 0 ig
r"N
Is there any EHS award from customer / external like Peacock, Greentech, 0.67 A 0.67 0.00
lo
y.
NSC etc.
Reward & ### Coo
Monthly Reward & Recogntion program exists & implemented for contractor
3.3 Recognition and 2 0.67 A 0.67 0.00 f
workers. m
Innovation p
"l
Safety innovative idea generated and implemented at project (at least one Fy
0.67 A 0.67 0.00 ai
per project) in
r
2 2 2 0 Proactive Compliances gl
"y
Total 7 Total EPP Score-------> 7 7 0 0%
C
4 Leadership & Management Commitment o
m
N
p
o
l
Visit by VP/PCH Is there any Monthly Hierarchic Safety Visit (HSV) conducted by VP/PCH at .y
4.1 2 2 A 2.00 0.00
(HSV) project? i
o
n
fg
2 2 2.00 0.00 "
"
F
Review by Is there any Monthly Hierarchic Safety review (HSR) conducted by VP/PCH at
4.2 2 2 A 2.00 0.00 a
VP/PCH (HSR) project? i
r
2 2 2.00 0.00 l
y
4.3 Region Safety 2 Is there any Fortnightly Regional Safety Visit conducted by RM/Country 2 A 2.00 0.00 C
Visit (RSV) Manager/Multiple project handling at Project? o
m
2 2 2.00 0.00 p
l
Region Safety Is there any Fortnightly Regional Safety Review conducted by RM/Country y
4.4 2 2 A 2.00 0.00
Reviews (RSR) Manager/Multiple project handling at Project? i
n
2 2 2.00 0.00 g
"
###
Is there weekly TSV being carried out lead by Project Head (PM, Sr.PM) total
1.00 A 1.00 0.00
Team Safety four TSV in month?
4.5 Visit (TSV) 2
Ensure immediate corrective actions are taken and action plan exists for open
1.00 A 1.00 0.00
deviations
2 2.00 2.00 0.00
4.6 Weekly EHS 2 Is there weekly review conducted by Project manager independent or part of 2 A 2.00 0.00
Review (WER) over all project review?
2 2 2.00 0.00
Is there violation memo system available in Project? 1.00 A 1.00 0.00
4.7 EHS Discipline 2
Is there work stoppage/Penalty system in place? 1.00 A 1.00 0.00
2 2.00 2.00 0.00
For all critical / high risk activity, specific HIRA(Hazard Identification & Risk ###
Assessment) including past learning of incidents must be undertaken and 1.00 A 1.00 0.00
formally recorded.
Are the site doing Job hazard analysis before commencing all non routine
0.50 A 0.50 0.00
EHS Standard activity?
4.8 3
and Procedure
Site EHS roles, responsibilities are framed and cascaded down. 0.50 A 0.50 0.00
Project team must be aware about EHS procedures. 0.50 A 0.50 0.00
Any other EHS procedure e.g. EHS plan, Aspect & Impact, Legal Register etc. 0.50 A 0.50 0.00
Negative Score Criteria : Negative marking shall be considered on yearly basis and mark deduction
from yearly score for Region/BU's wise. As per below mention criteria
Description Criteria Negative Score
Any single instance of fatal accident (irrespective of no.
Fatal Accident 20
of death in any accident)