You are on page 1of 1

SMART Cell – Bilge – Installation Certificate

Installation procedure: Smart Cell - Bilge Installation Instructions 110617

Monitor Serial number: Ship:

Separator Model & Serial Number:

Section 1
Installation

Process Yes/ No/ N/a


Has the monitor been securely fitted?
Clean water piped?
Sample water piped to separator outlet without any isolation valves?
Air supply piped to bilge monitor autoclean?

If no then why not?

Section 2
Electrical Connections

Process Yes/ No/ N/a


Mains power connected correctly?
Alarm 1 connected correctly?
Alarm 2 connected correctly?
Separator Status switch SW1 connected correctly?
Separator Backflush switch SW2 connected correctly?
4-20mA output connected?

If no then why not?

Section 3
IMO Download
Process Yes/ No/ N/a
Confirm that alarms are being recorded
Confirm that SW1 switch is being recorded
Confirm that SW2 is being recorded

Installation completed by:

Company:

Signed: Date:

Customer: Rank:

RIVERTRACE ENGINEERING LIMITED


Unit P, Kingsfield Business Centre, Philanthropic Road, Redhill, Surrey, Rh1 4DP
CN Date: 12.09.12 Authorised By: C Redstone
Title: Smart Cell – Bilge – Installation Certificate Doc. No. 110826 Rev: A

You might also like