Professional Documents
Culture Documents
Lab 22
Lab 22
Without Scaling
Without Fouling
Reject
valve
closed
Standard RO
Geometry stable
Concentration stable
2
Pulse Flow Operation
› Three successful pilots
1 2
3
HP Pump Operation Regime
Pressure
Reject
flow
Flow
Pat. GB2519880;
PCT/IB2015/055665;
Reject discharge Permeate production WO 2016024179 A1
Pulse Flush Pilot in Hadera RO Plant
5
Short Stay in an Extremely High Concentration allows reaching Extremely
High Recovery
› The pulse flow RO process
› Fast increase of brine flow concentration during Production (Dead-End 100% recovery)
› Fast decrease of brine flow concentration during short time reject flush
PF brine concentration
PF
6
Slow Dynamics of the Nucleation Process
Relatively Slow Dynamics of the Nucleation Process, compare to short time stay of
PFRO brine in membranes, allows reach extremely high recovery
The mathematical model represents the actual time required for formation of a CaCO3 layer on the existing proto-crystals
7
Expert Design Model
› Pulse flow RO
› Results of low conductivity test
8
1-stage PFRO versus 4-stage BWRO
5 5 5 1.000
roding:
Coding:Actual
0.1532
0.4
Actual 0.1532
0.1447
0.000
4.1 4.1 12.62 4.1
12.6
n Points
sign Points
4.1
0.6
4.1 0.6835 12.62 4.1
13
0.6835 0.4 0.6835
0.1026
0.1447
13 0.1308
0.6835
0.102612.62
12.67 0.1447 0.1532
3.2
12.67 12.62 Desirability 0.787 3.2
12.6
12.55
0.1308
0.1532 X1 = A: Production
Prediction 12.65 3.2
0.172
1.000
Prediction 0.2643
B: Flushing (sec)
B: Flushing (sec)
B: Flushing (sec)
0.6924 0.71 12.6 0.7651
3.2 Desirability 0.787 3.2 Prediction 12.65 3.2 Prediction 0.2643
X2 = B: Flushing
0.6924 12.55 0.172 0.2
B: Flushing (sec)
B: Flushing (sec)
0.6924 0.71 0.7651
0.6924 0.6463 0.2
0.6
4.1
2.3 2.3 2.3
0.2804
0.6835 0.6835
12
0.2804
2.3
0.6835 0.6835
2.3
12
2.3
0.800
A: Production 0.4
Production
B: Flushing 1.4
0.6
1.4
0.4
1.4
0.6
Flushing
1.4 1.4 1.4 11
0.6
0.4 11
0.6 0.600
0.4 0.2 0.8
60 75.56 91.11 106.7 122.2 137.8 153.3 168.9 184.4 200 60 75.56 91.11 106.7 122.2 137.8 153.3 168.9 184.4 200
0.7267 60 75.56 0.7455
91.11 106.7 122.2 137.8
0.7696
153.3 168.9 184.4 200
0.400
Desirability
0.6865
A: Production (sec) A: Production (sec) A: Production (sec)
A: Production (sec) A: Production (sec) A: Production (sec)
0.6838
94
94
94.97
4.1 4.1
99.8
0.000
4.1 94.97 4.1
0.6838
99.8
96
0.6463
96
96.93 99.77
0.6865
96.93 99.77
3.2 3.2
0.6
97.35 Prediction 98.18 Prediction 99.69
99.71
B: Flushing (sec)
99.73
B: Flushing (sec)
99.72 99.71
3.2 97.35 Prediction 98.18 3.2 Prediction 99.69
99.73 99.71
B: Flushing (sec)
97.72
98
2.3 2.3 99.7
98
98.34
2.3 2.3 99.7
99.68 5 200
98.34 98.61
98.61
99.68 0.4 99.66
184.444
99.66
4.1 168.889
1.4 99.17 1.4
99.63
1.4 99.17 1.4 0.2 153.333
99.63 99.6 3.2
137.778
99.6
0.5 100
122.222
100 0.5 0.5 2.3
60 75.56 91.11 106.7 122.2 137.8 153.3 168.9 184.4 200 60 75.56 91.11 106.7 122.2 137.8 153.3 168.9 184.4 200
106.667
0.5
600.5 75.56 91.11 106.7 122.2 137.8 153.3 168.9 184.4 200
91.1111
60 75.56 91.11 106.7 122.2 137.8 153.3 168.9 184.4 200 60 75.56 91.11 106.7 122.2 137.8 153.3 168.9 184.4 200
B: Flushing (sec) 1.4 A: Production (sec)
75.5556
A: Production (sec) A: Production (sec)
0.5 60
A: Production (sec) A: Production (sec)
A: Production (sec)
Not pumping brine flow continuously results in ~ 20% Power Saving
800m3/h
160m3/h
200m3/h
1000m3/h 40m3/h
200m3/h
13
Micro Pilot - RO Reject Brine Squeezer
Capacity 2000 GPD, Recovery 50%-90%
2.5 kw motor