You are on page 1of 1

Project Manager SS/Result/

Gulmohar Trade Centre Date:-

Project:- Gulmohar trade centre, plot no. 8-F, Main markeet, Gulberg, Lahore

Subject:- Compressive strength of concrete cylinders


Dear Sir,
We received 3 Nos. of concrete cylinder after 28 days making and curing them for their testing of
compressive strength.
Please find enclosed herewith test results for your information and record.

Detailed of the results are as under:-


Age Load
Corrected
Testing Compressive
Description of Casting Date Load
Date Strength
Cylinder
(Days) (lbs) (Psi)
(lbs)
Column A-2
(level Up to - 07-01-2019. 04-02-2019. 28 days 31000 30962 1094
19',8'')
Column B-1
(level Up to - 07-01-2019. 04-02-2019. 28 days 191000 190767 6743
19',8'')

Column D-3
(level Up to - 07-01-2019. 04-02-2019. 28 days 261000 260682 9215
19',8'')

Avg 5684
Note:-
1- The responsibility of concrete cylinder making curing etc. rests, with client.
2- The results may be compared with the project specification relevant standards as the case may be.
3- Correction factor of compressive strength machine is 0.122 %.

Material Engineer
Soil & Foundation Engineering
Services