Project:- Gulmohar trade centre, plot no. 8-F, Main markeet, Gulberg, Lahore
Column D-3
(level Up to - 07-01-2019. 04-02-2019. 28 days 261000 260682 9215
19',8'')
Avg 5684
Note:-
1- The responsibility of concrete cylinder making curing etc. rests, with client.
2- The results may be compared with the project specification relevant standards as the case may be.
3- Correction factor of compressive strength machine is 0.122 %.
Material Engineer
Soil & Foundation Engineering
Services