Name of Applicant: SOIL AND FOUNDATION ENGINEERING SERVICES
Sr. Name of Project Value of
No. Geotechnical Contract Contract* Duration (Pak Rs.) EXPANSION AND RENOVATION OF BEGUM NUSRAT BHUTTO (BNB) SUKKUR AIRPORT 3420139 40 days
CONSTRUCTION OF MULTI LEVEL GRADE
SEPARATION AT SHAHDARA MORR, LAHORE 1022643 24 days
DETAILED DESIGN AND CONSTRUCTION
SUPERVISION OF TRIBAL AREA ELECTRIC 930435 35 days COMPANY (TESCO) OFFICE BUILDING, PESHAWAR RAVI RIVERFRONT URBAN DEVELOPMENT PROJECT (RRUDP) RIVER TRAINING WORKS AND 858058 30 days BARRAGES (PACKAGE 6 RIVER EMBANKMENT)
BRIDGE OVER HUDIARA DRAIN TO CONNECT
KARBATH TO PHASE-VII, DHA LAHORE 390784 17 days
FEDERAL GOVERNMENT EMPLOYEES HOUSING
AUTHORITY AT MOUZA TAMMA AND MOHRIAN, 2347781 3 weeks ZONE-IV, ISLAMABAD 600 MW SOLAR PHOTOVOLTAIC (PV) POWER PLANT NEARHEAD MUHAMMADWALA, 485611 8 days MUZAFFARGARH (PACKAGE-II) 600 MW SOLAR PHOTOVOLTAIC (PV) POWER PLANT NEARHEAD MUHAMMADWALA, 489006 12 days MUZAFFARGARH (PACKAGE-III) 600 MW SOLAR PHOTOVOLTAIC (PV) POWER PLANT NEARHEAD MUHAMMADWALA, 488880 12 days MUZAFFARGARH (PACKAGE-IV) 600 MW SOLAR PHOTOVOLTAIC (PV) POWER PLANT NEARHEAD MUHAMMADWALA, 367376 10 days MUZAFFARGARH DESIGN OF REMAINING COMPONENTS AND CONSTRUCTION SUPERVISION OF WORKS OF 535063 23 days PAKISTAN DIGITAL CITY (PDC), HARIPUR, KHYBER PAKHTUNKHWA FEASIBILITY STUDY FOR REMODELLING OF BRBD LINK CANAL TO MEET THE SHORTAGE OF CANAL 2411780 45 days SUPPLY FOR LAHORE AND KASUR DIVISIONS Application Form A-2 Page 2 of 4 Pages
Experience of the Firm
Name of Applicant: SOIL AND FOUNDATION ENGINEERING SERVICES
Sr. Name of Project Value of
No. Geotechnical Contract Contract* Duration (Pak Rs.) EXPANSION OF TERMINAL BUILDING AND ALLIED FACILITIES AT ALLAMA IQBAL INTERNATIONAL 1290265 12 days AIRPORT (AIIAP), LAHORE. UNDERPASS ALONG SHABBIR SHARIF ROAD,PHASE VI, DHA LAHORE 411983 21 days RAVI RIVERFRONT URBAN DEVELOPMENT PROJECTINFRASTRUCTURE DEVELOPMENT AT 298373 15 days CHAHAR BAGH (Road Works) URBAN REGENERATION OF WALTON - CENTRAL BUSINESS DISTRICT, LAHORE 499482 30 days (PLOT-07 PARKING PLAZA) URBAN REGENERATION OF WALTON – CENTRAL BUSINESS DISTRICT, LAHORE (BASEMENT 310268 22 days EXTENSION OF PLOT-07 PARKING PLAZA) RIVER RAVI URBAN DEVELOPMENT PROJECT RIVER TRAINING WORKS RIVER EMBANKMENT 495020 22 days (FIRST 3 KM REACH) RAVI RIVERFRONT URBAN DEVELOPMENT PROJECT (RRUDA) MEHMOOD BOOTI / SHADBAGH 859693 8 days WASTEWATER TREATMENT PLANT RIVER RAVI URBAN DEVELOPMENT PROJECT ACCESS ROAD ZONE 2 407721 25 days
WASTEWATER TREATMENT PLANTS FOT
MEHMOOD BOOTI / SHADBAGH, SHAHDARA AND 361063 25 days BABU SABU LAHORE OFFICE AND UTILITY BUILDING AT CBD WALTON, LAHORE 344325 20 days
PARKING BUILDINGS AT CBD WALTON, LAHORE
277578 18days EXTENTION OF BRIDGE AT BABUSABU INTERCHANGE, LAHORE 264457 17 days
CONSTRUCTION OF AUDITORUM AT NATIONAL
INSTITUTE OF HEALTH, ISLAMABAD 485948 20 days Application Form A-2 Page 3 of 4 Pages
Experience of the Firm
Name of Applicant: SOIL AND FOUNDATION ENGINEERING SERVICES
Sr. Name of Project Value of
No. Geotechnical Contract Contract* Duration (Pak Rs.) CONSULTANCY SERVICES FOR FATA INFRASTRUCTURE WORKS UNDER FATA 676948 25 days INFRASTRUCTURE PROGRAM (FIP) AND USAID FUNDED LAND REGISTRATION CENTER (LRC), PESHWAR CBD WALTON, LAHORE ROAD WORKS - PHASE I 155420 12 days CONSTRUCTION OF BUS TERMINAL AT NORTHERN BYPASS/MOTORWAY JUNCTION, PESHAWAR 1118326 38 days
GEOTECHNICAL INVESTIGATION FOR QUAID-E-
AZAM UNIVERSITY (QAU),ISLAMABAD 918495 5 weeks FEASIBILITY STUDY OF ADDITIONAL BULK WATER OPTIONS OF INDUS SOURCE 1491816 5 weeks RIVER RAVI URBAN DEVELOPMENT PROJECT RIVER TRAINING WORKS RIVER EMBANKMENT 495020 22 days (FIRST 3 KM REACH) RAVI RIVERFRONT URBAN DEVELOPMENT PROJECT (RRUDA) MEHMOOD BOOTI / SHADBAGH 859693 8 days WASTEWATER TREATMENT PLANT RIVER RAVI URBAN DEVELOPMENT PROJECT ACCESS ROAD ZONE 2 407721 25 days DESIGN ADVISOR FOR MAJOR ARTERIAL ROADS (ROAD WORKS) PACKAGE-I: DEPALPUR-VEHARI 1334880 6.5 weeks ROAD (LENGTH 150 KM) DESIGN ADVISOR FOR MAJOR ARTERIAL ROADS (ROAD WORKS) PACKAGE-II: HASILPUR- 732586 6.5 weeks BAHAWALNAGAR ROAD (LENGTH 75 KM) TECHNICAL ASSESSMENT AND FEASIBILITY OF 497525 15days PROPOSEDMODEL ROADS IN SAHIWAL FAISALABAD-CHINIOT-SARGODHA ROAD SOIL INVESTIGATIONS 247290 4 weeks
MULTAN-VEHARI RAOD SOIL INVESTIGATIONS
425280 4 wees
Application Form A-2 Page 4 of 4 Pages
Experience of the Firm
Name of Applicant: SOIL AND FOUNDATION ENGINEERING SERVICES
Sr. Name of Project Value of
No. Geotechnical Contract Contract* Duration (Pak Rs.) CONSULTANCY SERVICES FOR EXPANSION AND UPGRADATION OF PAKISTAN PETROLEUM 366856 1.5 weeks COREHOUSE (PETCORE), ISLAMABAD CONSTRUCTION OF APARTMENTS AT OFF HOUSING SCHEME, PHASE-I RAIWAND ROAD 735685 4.5 weeks LAHORE DESIGN FOR REMODELLING OF KETCHERY CHOWK, RAWALPINDI 375734 30 days
CONSULTANCY SERVICES FOR COMBINED
EFFLUENT TREATMENT PLANT IN NORTH 443370 4 weeks WESTERN INDUSTRIAL ZONE AT PORT QASIM, KARACHI CONSULTANCY SERVICES FOR PROPOSED WATER WORKS IN EASTERN INDUSTRIAL ZONE AT PORT 918495 25 days QASIM, KARACHI FEASIBILTYY STUDY, MASTER PLANNING AND DESIGN OF PAKISTAN DIGITAL CITY HARIPUR, 495990 4 weeks KHYBER PAKHTUNKHWA CONSTRUCTION DESIGN AND SUPERVISION SERVICES FOR UNHCR WAREHOUSE AT 265617 15 days CHAMKANI PESHAWAR.